Pacific Northwest-Pacific Southwest Intertie Project and Parker-Davis Project-Rate Order No. WAPA-210
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
The extension of the Desert Southwest Region's (DSW) existing transmission service rates for the Pacific Northwest-Pacific Southwest Intertie Project (Intertie) and the existing transmission and firm electric service formula rates for the Parker-Davis Project (PDP) have been confirmed, approved, and placed into effect on an interim basis. The existing rates under Rate Schedules INT-FT5, INT-NFT4, PD-F7, PD- FT7, PD-FCT7, and PD-NFT7 are set to expire on September 30, 2023. This rate extension makes no changes to the existing rates and extends them through September 30, 2024.
Full Text
<html>
<head>
<title>Federal Register, Volume 88 Issue 167 (Wednesday, August 30, 2023)</title>
</head>
<body><pre>
[Federal Register Volume 88, Number 167 (Wednesday, August 30, 2023)]
[Notices]
[Pages 59904-59909]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2023-18737]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Western Area Power Administration
Pacific Northwest-Pacific Southwest Intertie Project and Parker-
Davis Project--Rate Order No. WAPA-210
AGENCY: Western Area Power Administration, DOE.
ACTION: Notice of rate order extending transmission and firm electric
service rates.
-----------------------------------------------------------------------
SUMMARY: The extension of the Desert Southwest Region's (DSW) existing
transmission service rates for the Pacific Northwest-Pacific Southwest
Intertie Project (Intertie) and the existing transmission and firm
electric service formula rates for the Parker-Davis Project (PDP) have
been confirmed, approved, and placed into effect on an interim basis.
The existing rates under Rate Schedules INT-FT5, INT-NFT4, PD-F7, PD-
FT7, PD-FCT7, and PD-NFT7 are set to expire on September 30, 2023. This
rate extension makes no changes to the existing rates and extends them
through September 30, 2024.
DATES: The extended rates under Rate Schedules INT-FT5, INT-NFT4, PD-
F7, PD-FT7, PD-FCT7, and PD-NFT7 will be placed into effect on an
interim basis on October 1, 2023.
FOR FURTHER INFORMATION CONTACT: Jack D. Murray, Regional Manager,
Desert Southwest Region, Western Area Power Administration, P.O. Box
6457, Phoenix, AZ 85005-6457, or Tina Ramsey, Rates Manager, Desert
Southwest Region, Western Area Power Administration, (602) 605-2565, or
email: <a href="/cdn-cgi/l/email-protection#5f3b2c282f282d322d341f283e2f3e71383029"><span class="__cf_email__" data-cfemail="abcfd8dcdbdcd9c6d9c0ebdccadbca85ccc4dd">[email protected]</span></a>.
SUPPLEMENTARY INFORMATION: Western Area Power Administration (WAPA)
published a Federal Register notice (Proposed FRN) on June 23, 2023 (88
FR 41101), proposing to extend the existing Intertie transmission
service rates and the existing PDP transmission and firm electric
service formula rates under Rate Schedules INT-FT5, INT-NFT4, PD-F7,
PD-FT7, PD-FCT7, and PD-NFT7. The Proposed FRN also initiated a 30-day
public consultation and comment period.
Legal Authority
By Delegation Order No. S1-DEL-RATES-2016, effective November 19,
[[Page 59905]]
2016, the Secretary of Energy delegated: (1) the authority to develop
power and transmission rates to the WAPA Administrator; (2) the
authority to confirm, approve, and place such rates into effect on an
interim basis to the Deputy Secretary of Energy; and (3) the authority
to confirm, approve, and place into effect on a final basis, or to
remand or disapprove such rates, to FERC. By Delegation Order No. S1-
DEL-S3-2023, effective April 10, 2023, the Secretary of Energy also
delegated the authority to confirm, approve, and place such rates into
effect on an interim basis to the Under Secretary for Infrastructure.
By Redelegation Order No. S3-DEL-WAPA1-2023, effective April 10, 2023,
the Under Secretary for Infrastructure further redelegated the
authority to confirm, approve, and place such rates into effect on an
interim basis to WAPA's Administrator. This extension is issued under
Redelegation Order No. S3-DEL-WAPA1-2023 and Department of Energy rate
extension procedures set forth in 10 CFR part 903.\1\
---------------------------------------------------------------------------
\1\ 50 FR 37835 (Sept. 18, 1985) and 84 FR 5347 (Feb. 21, 2019).
---------------------------------------------------------------------------
Following review of DSW's proposal, Rate Order No. WAPA-210 is
hereby confirmed, approved, and placed into effect on an interim basis.
This extends, without adjustment, the existing Rate Schedules INT-FT5,
INT-NFT4, PD-F7, PD-FT7, PD-FCT7, and PD-NFT7 through September 30,
2024. WAPA will submit Rate Order No. WAPA-210 and the extended rate
schedules to FERC for confirmation and approval on a final basis.
Department of Energy Administrator, Western Area Power Administration
In the Matter of: Western Area Power Administration Extension for
the Pacific Northwest-Pacific Southwest Intertie Project Transmission
Service Rates and Parker-Davis Project Firm Electric Service and
Transmission Service Formula Rates, Rate Order No. WAPA-210.
Order Confirming, Approving, and Placing Rates for the Pacific
Northwest-Pacific Southwest Intertie Project and Formula Rates for the
Parker-Davis Project Into Effect on an Interim Basis
The rates in Rate Order No. WAPA-210 are established in accordance
with section 302 of the Department of Energy (DOE) Organization Act (42
U.S.C. 7152).\1\
---------------------------------------------------------------------------
\1\ This Act transferred to, and vested in, the Secretary of
Energy the power marketing functions of the Secretary of the
Department of the Interior and the Bureau of Reclamation
(Reclamation) under the Reclamation Act of 1902 (ch. 1093, 32 Stat.
388), as amended and supplemented by subsequent laws, particularly
section 9(c) of the Reclamation Project Act of 1939 (43 U.S.C.
485h(c)); and other acts that specifically apply to the projects
involved.
---------------------------------------------------------------------------
By Delegation Order No. S1-DEL-RATES-2016, effective November 19,
2016, the Secretary of Energy delegated: (1) the authority to develop
power and transmission rates to the Western Area Power Administration
(WAPA) Administrator; (2) the authority to confirm, approve, and place
such rates into effect on an interim basis to the Deputy Secretary of
Energy; and (3) the authority to confirm, approve, and place into
effect on a final basis, or to remand or disapprove such rates, to
FERC. By Delegation Order No. S1-DEL-S3-2023, effective April 10, 2023,
the Secretary of Energy also delegated the authority to confirm,
approve, and place such rates into effect on an interim basis to the
Under Secretary for Infrastructure. By Redelegation Order No. S3-DEL-
WAPA1-2023, effective April 10, 2023, the Under Secretary for
Infrastructure further redelegated the authority to confirm, approve,
and place such rates into effect on an interim basis to WAPA's
Administrator. This extension is issued under Redelegation Order No.
S3-DEL-WAPA1-2023 and DOE rate extension procedures set forth in 10 CFR
part 903.\2\
---------------------------------------------------------------------------
\2\ 50 FR 37835 (Sept. 18, 1985) and 84 FR 5347 (Feb. 21, 2019).
---------------------------------------------------------------------------
Background
Intertie Project Transmission Service
On August 22, 2013, FERC approved and confirmed Rate Schedules INT-
FT5 and INT-NFT4 under Rate Order No. WAPA-157 on a final basis for a
5-year period through April 30, 2018.\3\ WAPA's Administrator
subsequently approved the use of the existing Intertie transmission
service rates for short-term sales for the period between May 1, 2018,
and October 31, 2018, or the date the extension of the Intertie
transmission service rates went into effect, whichever occurred first.
On September 11, 2018, the Deputy Secretary of Energy approved the
extension of the Intertie transmission service rates on an interim
basis.\4\ On December 3, 2018, FERC approved and confirmed the
extension of Rate Schedules INT-FT5 and INT-NFT4 under Rate Order No.
WAPA-181 on a final basis for a two-year period through September 30,
2020.\5\ On March 2, 2021, FERC approved and confirmed the extension of
Rate Schedules INT-FT5 and INT-NFT4 under Rate Order No. WAPA-192 on a
final basis for a 3-year period through September 30, 2023.\6\
---------------------------------------------------------------------------
\3\ Order Confirming and Approving Rate Schedules on a Final
Basis, FERC Docket No. EF13-4-000.
\4\ 83 FR 47921 (Sept. 21, 2018).
\5\ Order Confirming and Approving Rate Schedules on a Final
Basis, FERC Docket No. EF18-5-000.
\6\ Order Confirming and Approving Rate Schedules on a Final
Basis, FERC Docket No. EF20-9-000.
---------------------------------------------------------------------------
DSW is extending the existing Intertie transmission service rates
under Rate Schedules INT-FT5 and INT-NFT4 for one year, through
September 30, 2024. The existing rates provide sufficient revenue to
pay all annual costs, including interest expense, and repay investment
within the allowable period consistent with the cost recovery criteria
set forth in Department of Energy (DOE) Order RA 6120.2.
Parker-Davis Project Transmission and Firm Electric Service
On September 18, 2014, FERC approved and confirmed Rate Schedules
PD-F7, PD-FT7, PD-FCT7, and PD-NFT7 under Rate Order No. WAPA-162 on a
final basis for a 5-year period through September 30, 2018.\7\ On
January 31, 2019, FERC approved and confirmed the extension of Rate
Schedules PD-F7, PD-FT7, PD-FCT7, and PD-NFT7 under Rate Order No.
WAPA-184 on a final basis for a 5-year period through September 30,
2023.\8\
---------------------------------------------------------------------------
\7\ Order Confirming and Approving Rate Schedules on a Final
Basis, FERC Docket No. EF14-4-000.
\8\ Order Confirming and Approving Rate Schedules on a Final
Basis, FERC Docket No. EF19-1-000.
---------------------------------------------------------------------------
DSW is extending the existing PDP transmission and firm electric
service formula rates under Rate Schedules PD-F7, PD-FT7, PD-FCT7, and
PD-NFT7 for a one-year period, through September 30, 2024. The existing
formula rates provide sufficient revenue to pay all annual costs,
including interest expense, and repay investment within the allowable
period consistent with the cost recovery criteria set forth in DOE
Order RA 6120.2.
Discussion
In accordance with 10 CFR 903.23(a), DSW filed a notice in the
Federal Register on June 23, 2023, proposing to extend, without
adjustment, Rate Schedules INT-FT5, INT-NFT4, PD-F7, PD-FT7, PD-FCT7,
and PD-NFT7 under Rate Order No. WAPA-210.\9\ DSW determined it was not
necessary to hold public information or public comment forums on the
proposed rates and formula rates extension, but provided a 30-day
consultation and comment period to give the public an opportunity to
comment on the proposed extension. The consultation and comment period
ended on July 24,
[[Page 59906]]
2023, and DSW received no comments on the proposed rates and formula
rates extension.
---------------------------------------------------------------------------
\9\ 88 FR 41101 (2023).
---------------------------------------------------------------------------
Ratemaking Procedure Requirements
Environmental Compliance
WAPA previously determined that this action fits within the
following categorical exclusions listed in appendix B to subpart D of
10 CFR 1021.410: B4.3 (Electric power marketing rate changes).
Categorically excluded projects and activities do not require
preparation of either an environmental impact statement or an
environmental assessment.\10\ A copy of the categorical exclusion
determination is available on WAPA's website at <a href="http://www.wapa.gov/regions/DSW/Environment/Pages/environment.aspx">www.wapa.gov/regions/DSW/Environment/Pages/environment.aspx</a>. Look for file entitled, ``Rate
Order WAPA-210.''
---------------------------------------------------------------------------
\10\ The determination was done in compliance with the National
Environmental Policy Act (NEPA) of 1969, as amended, 42 U.S.C. 4321-
4347; the Council on Environmental Quality Regulations for
implementing NEPA (40 CFR parts 1500-1508); and DOE NEPA
Implementing Procedures and Guidelines (10 CFR part 1021).
---------------------------------------------------------------------------
Determination Under Executive Order 12866
WAPA has an exemption from centralized regulatory review under
Executive Order 12866; accordingly, no clearance of this notice by the
Office of Management and Budget is required.
Submission to the Federal Energy Regulatory Commission
The provisional rates and formula rates herein confirmed, approved,
and placed into effect on an interim basis, together with supporting
documents, will be submitted to FERC for confirmation and final
approval.
Order
In view of the above and under the authority delegated to me, I
hereby confirm, approve, and place into effect on an interim basis,
Rate Order No. WAPA-210, which extends the existing transmission rates
and firm electric service and transmission formula rates under Rate
Schedules INT-FT5, INT-NFT4, PD-F7, PD-FT7, PD-FCT7, and PD-NFT7
through September 30, 2024. The rates will remain in effect on an
interim basis until: (1) FERC confirms and approves this extension on a
final basis; (2) subsequent rates are confirmed and approved; or (3)
such rates are superseded.
Signing Authority
This document of the Department of Energy was signed on August 24,
2023, by Tracey A. LeBeau, Administrator, Western Area Power
Administration, pursuant to delegated authority from the Secretary of
Energy. That document, with the original signature and date, is
maintained by DOE. For administrative purposes only, and in compliance
with requirements of the Office of the Federal Register, the
undersigned DOE Federal Register Liaison Officer has been authorized to
sign and submit the document in electronic format for publication, as
an official document of the Department of Energy. This administrative
process in no way alters the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC, on August 25, 2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S. Department of Energy.
Rate Schedule INT-FT5
(Supersedes Rate Schedule INT-FT4)
United States Department of Energy Western Area Power Administration
Desert Southwest Region
Pacific Northwest-Pacific Southwest Intertie Project
Long-Term and Short-Term Firm Point-to-Point Transmission Service
(Approved Under Rate Order No. WAPA-157)
Effective
The first day of the first full billing period beginning on or
after May 1, 2013, and will remain in effect through September 30,
2018, or until superseded by another rate schedule. [Note: This rate
schedule was extended by Rate Order No. WAPA-181 through September 30,
2020, by Rate Order No. WAPA-192 through September 30, 2023, and by
Rate Order No. WAPA-210 through September 30, 2024.]
Applicable
To firm point-to-point transmission service customers where
capacity and energy are supplied to the Pacific Northwest-Pacific
Southwest Intertie Project (Intertie) transmission system at points of
interconnection with other systems and transmitted and delivered, less
losses, to points of delivery on the Intertie transmission system.
Long-Term Rate
For transmission service of one year or longer, the rate is $19.32
for each kilowatt (kW) per year, payable monthly at the rate of $1.61
for each kW per month.
Short-Term Rates
For transmission service up to one year, the maximum rate for each
kW is as follows:
Monthly: $1.61
Weekly: $0.3715
Daily: $0.0529
Hourly: 2.21 mills
Discounts may be offered from time-to-time in accordance with
Western's Open Access Transmission Tariff (OATT).
Billing
Western will bill firm point-to-point transmission service
customers monthly by applying the rates listed above to the amount of
capacity reserved. Payment for long-term transmission service will be
required one month in advance of said service.
Character and Conditions of Service
Alternating current at 60 hertz, three-phase, delivered and metered
at the voltages and points of delivery established by the service
agreement or contract.
Adjustments for Reactive Power
There shall be no entitlement to transfer of reactive kilovolt-
amperes at delivery points, except when such transfers may be mutually
agreed upon by the customer and Western or their authorized
representatives.
Adjustments for Losses: [This Section Was Superseded by Rate Schedule
DSW-TL1]
Capacity and energy losses incurred in connection with the
transmission and delivery of capacity and energy under this rate
schedule shall be supplied by the customer in accordance with the
service agreement or contract. If losses are not fully provided by a
customer, charges for financial compensation may apply.
Unreserved Use: [This Section Was Superseded by Rate Schedule DSW-UU1]
Western will assess a charge for any unreserved use of the
transmission system. Unreserved use occurs when a customer uses
transmission service that it has not reserved or uses transmission
service in excess of its reserved capacity. Unreserved use may also
include a customer's failure to curtail transmission when requested.
The charge for unreserved use is two times the maximum allowable
rate for the service at issue, assessed as follows: The penalty for a
single hour of unreserved use is based on the daily short-term rate.
The penalty for more
[[Page 59907]]
than one assessment of unreserved use for any given duration (e.g.,
daily) increases to next longest duration (e.g., weekly). The penalty
for multiple instances of unreserved use (e.g., more than one hour)
within a day is based on the daily short-term rate. The penalty for
multiple instances of unreserved use isolated to one calendar week is
based on the weekly short-term rate. The penalty for multiple instances
of unreserved use during more than one week in a calendar month is
based on the monthly short-term rate.
A customer that exceeds its reserved capacity at any point of
receipt or point of delivery, or a customer that uses transmission
service at a point of receipt or point of delivery that it has not
reserved, is required to pay for all ancillary services that were
provided by the Western Area Lower Colorado (WALC) Balancing Authority
and associated with the unreserved use. The customer will pay for
ancillary services based on the amount of transmission service used and
not reserved.
Rate Schedule INT-NFT4
(Supersedes Rate Schedule INT-NFT3)
United States Department of Energy Western Area Power Administration
Desert Southwest Region
Pacific Northwest-Pacific Southwest Intertie Project
Nonfirm Transmission Service
Effective
The first day of the first full billing period beginning on or
after May 1, 2013, and will remain in effect through September 30,
2018, or until superseded by another rate schedule. [Note: This rate
schedule was extended by Rate Order No. WAPA-181 through September 30,
2020, by Rate Order No. WAPA-192 through September 30, 2023, and by
Rate Order No. WAPA-210 through September 30, 2024.]
Applicable
To nonfirm transmission service customers where capacity and energy
are supplied to the Northwest-Pacific Southwest Intertie Project
(Intertie) transmission system at points of interconnection with other
systems and transmitted and delivered, less losses, to points of
delivery on the Intertie transmission system.
Rate
The nonfirm transmission service rate is 2.21 mills for each
kilowatt per hour. Discounts may be offered from time-to-time in
accordance with Western's Open Access Transmission Tariff (OATT).
Billing
Western will bill nonfirm transmission service customers monthly by
applying the rate listed above to the amount of capacity reserved.
Character and Conditions of Service
Alternating current at 60 hertz, three-phase, interruptible,
delivered and metered at the voltages and points of delivery
established by service agreement or in advance by Western. Curtailment
conditions shall be determined by Western and in accordance with
Western's OATT.
Adjustments for Reactive Power
There shall be no entitlement to transfer of reactive kilovolt
amperes at delivery points, except when such transfers may be mutually
agreed upon by the customer and Western or their authorized
representatives.
Adjustment for Losses: [This Section Was Superseded by Rate Schedule
DSW-TL1]
Capacity and energy losses incurred in connection with the
transmission and delivery of capacity and energy under this rate
schedule shall be supplied by the customer in accordance with the
service agreement or contract. If losses are not fully provided by a
customer, charges for financial compensation may apply.
Unreserved Use: [This Section Was Superseded by Rate Schedule DSW-UU1]
Western will assess a charge for any unreserved use of the
transmission system. Unreserved use occurs when a customer uses
transmission service that it has not reserved or uses transmission
service in excess of its reserved capacity. Unreserved use may also
include a customer's failure to curtail transmission when requested.
The charge for unreserved use is two times the maximum allowable
rate for the service at issue, assessed as follows: The penalty for a
single hour of unreserved use is based on the daily short-term rate.
The penalty for more than one assessment of unreserved use for any
given duration (e.g., daily) increases to next longest duration (e.g.,
weekly). The penalty for multiple instances of unreserved use (e.g.,
more than one hour) within a day is based on the daily short-term rate.
The penalty for multiple instances of unreserved use isolated to one
calendar week is based on the weekly short-term rate. The penalty for
multiple instances of unreserved use during more than one week in a
calendar month is based on the monthly short-term rate.
A customer that exceeds its reserved capacity at any point of
receipt or point of delivery, or a customer that uses transmission
service at a point of receipt or point of delivery that it has not
reserved, is required to pay for all ancillary services that were
provided by the Western Area Lower Colorado (WALC) Balancing Authority
and associated with the unreserved use. The customer will pay for
ancillary services based on the amount of transmission service used and
not reserved.
Rate Schedule PD-F7
(Supersedes Schedule PD-F6)
United States Department of Energy Western Area Power Administration
Desert Southwest Region
Parker-Davis Project
Schedule of Rates for Firm Electric Service
Effective
The first day of the first full billing period beginning on or
after October 1, 2008, through September 30, 2013, or until superseded,
whichever occurs earlier. [Note: This rate schedule was extended by
Rate Order No. WAPA-162 through September 30, 2018, by Rate Order No.
WAPA-184 through September 30, 2023, and by Rate Order No. WAPA-210
through September 30, 2024.]
Available
In the area served by the Parker-Davis Project (P-DP).
Applicable
To firm electric service customers for firm power service supplied
through one meter at one point of delivery, unless otherwise provided
by service agreement or contract.
Character and Conditions of Service
Alternating current at 60 hertz, three-phase, delivered and metered
at the voltages and points of delivery established by service agreement
or contract.
Charges
Energy Charge: Each firm electric service customer shall be billed
monthly an energy charge. This charge is equal to the customer's
monthly contractual energy reservation multiplied by the Energy Rate,
rounded to the penny. The Energy Rate shall be equal to 50 percent of
the annual generation revenue requirement divided by the estimated
total generation delivery commitments, rounded to two decimal places.
Capacity Charge: Each firm electric service customer shall be
billed monthly
[[Page 59908]]
a capacity charge. This charge is equal to the customer's monthly
contractual capacity reservation multiplied by the Capacity Rate,
rounded to the penny. The Capacity Rate shall be equal to 50 percent of
the annual generation revenue requirement divided by the estimated
total generation delivery commitments, rounded to two decimal places.
Transmission Charge: Each firm electric service customer shall be
billed monthly a transmission charge. This charge is equal to the
customer's contractual reservation multiplied by the rate calculated in
accordance with PD-FT7, rounded to the penny.
Lower Basin Development Fund Contribution Charge: The contribution
charge is 4.5 mills/kWh for each kWh measured or scheduled to an
Arizona purchaser and 2.5 mills/kWh for each kWh measured or scheduled
to a California or Nevada purchaser.
Billing of Excess Energy
For each month in which there is excess energy available, offered,
and delivered to the firm electric service customer, such excess energy
shall be billed at the Energy Rate.
Billing for Unauthorized Overruns: [This Section Was Superseded by Rate
Schedule DSW-UU1]
For each month in which there is a contract violation involving an
unauthorized overrun of energy and/or capacity, such overruns shall be
billed at 10 times the Energy and/or Capacity Rate in this rate
schedule. For each month in which there is a contract violation
involving an unauthorized overrun of transmission, such overrun shall
be billed at two times the Transmission Charge in this rate schedule.
Transformer Losses: [This Section Was Superseded by Rate Schedule DSW-
TL1]
If delivery is made at transmission voltage but metered on the low-
voltage side of the substation, the meter readings will be increased to
compensate for transformer losses as provided for in the contract.
Power Factor
The firm electric service customer will normally be required to
maintain a power factor at all points of measurement between 95-percent
lagging and 95-percent leading.
Rate Schedule PD-FCT7
(Supersedes Schedule PD-FCT6)
United States Department of Energy Western Area Power Administration
Parker-Davis Project
Schedule of Rate for Firm Transmission Service of Salt Lake City Area/
Integrated Projects Power
Effective
The first day of the first full billing period beginning on or
after October 1, 2008, through September 30, 2013, or until superseded,
whichever occurs earlier. [Note: This rate schedule was extended by
Rate Order No. WAPA-162 through September 30, 2018, by Rate Order No.
WAPA-184 through September 30, 2023, and by Rate Order No. WAPA-210
through September 30, 2024]
Available
In the area served by the Parker-Davis Project (P-DP).
Applicable
To Salt Lake City Area/Integrated Projects (SLCA/IP) southern
division customers, where SLCA/IP capacity and energy are supplied to
the P-DP system by the Colorado River Storage Project (CRSP) at points
of interconnection with the CRSP system and transmitted and delivered
on a unidirectional basis, less losses, to southern division customers
at points of delivery on the P-DP system.
Character and Conditions of Service
Alternating current at 60 hertz, three-phase, delivered and metered
at the voltages and points of delivery established by service agreement
or contract.
Rate
The annual rate for each kilowatt per year is equal to the annual
transmission revenue requirement divided by the estimated transmission
delivery commitments, rounded to the nearest 12 cent increment. The
annual rate is payable monthly at a rate for each kilowatt per month
equal to the annual rate divided by 12.
Billing
Western will bill firm transmission service customers monthly by
applying the rates under this rate schedule to the amount of capacity
reserved. Payment for service will be required one month in advance of
said service.
Adjustments for Reactive Power
There shall be no entitlement to transfer of reactive kilovolt-
amperes at delivery points, except when such transfers may be mutually
agreed upon by the customer and Western or their authorized
representatives.
Adjustments for Losses: [This Section Was Superseded by Rate Schedule
DSW-TL1]
Capacity and energy losses incurred in connection with the
transmission and delivery of capacity and energy under this rate
schedule shall be supplied by the customer in accordance with the
service agreement or contract.
Overrun of Capacity Reserved: [This Section Was Superseded by Rate
Schedule DSW-UU1]
Western will assess a charge for unauthorized use of transmission
service at a rate equal to two times the applicable rate for the
service at issue. The charge will be applied to use in excess of the
reservation amount, which shall be the difference between the amount of
transmission service actually used by the customer less the amount of
transmission service the customer has reserved. The customer will incur
the charge for an overrun during the calendar month or for the period
of transmission service if such service is for a term of less than one
month.
Rate Schedule PD-FT7
(Supersedes Schedule PD-FT6)
United States Department of Energy Western Area Power Administration
Parker-Davis Project
Schedule of Rates for Firm Point-to-Point Transmission Service
Effective
The first day of the first full billing period beginning on or
after October 1, 2008, through September 30, 2013, or until superseded,
whichever occurs earlier. [Note: This rate schedule was extended by
Rate Order No. WAPA-162 through September 30, 2018, by Rate Order No.
WAPA-184 through September 30, 2023, and by Rate Order No. WAPA-210
through September 30, 2024.]
Available
In the area served by the Parker-Davis Project (P-DP).
Applicable
To firm point-to-point transmission service customers where
capacity and energy are supplied to the P-DP system at points of
interconnection with other systems and transmitted and delivered, less
losses, to points of delivery on the P-DP system.
[[Page 59909]]
Character and Conditions of Service
Alternating current at 60 hertz, three-phase, delivered and metered
at the voltages and points of delivery established by service agreement
or contract.
Long-Term Rate
For transmission service one year or longer, the annual rate for
each kilowatt per year is equal to the annual transmission revenue
requirement divided by the estimated transmission delivery commitments,
rounded to the nearest 12 cent increment. The annual rate for long-term
service is payable monthly at a rate for each kilowatt per month equal
to the annual rate for long-term service divided by 12.
Short-Term Rates
For transmission service up to one year, the maximum rate for each
kW is as follows:
Monthly: Equal to the annual long-term rate, divided by 12 and rounded
to two decimal places
Weekly: Equal to the annual long-term rate, divided by 52 and rounded
to two decimal places
Daily: Equal to the annual long-term rate, divided by 365 and rounded
to two decimal places
Hourly: Equal to the annual long-term rate, divided by 8,760 and
rounded to five decimal places
Discounts may be offered from time to time in accordance with
Western's Open Access Transmission Tariff.
Billing
Western will bill firm point-to-point transmission service
customers monthly by applying the rates under this rate schedule to the
amount of capacity reserved. Payment for service will be required one
month in advance of service.
Adjustments for Reactive Power
There shall be no entitlement to transfer of reactive kilovolt-
amperes at delivery points, except when such transfers may be mutually
agreed upon by the customer and Western or their authorized
representatives.
Adjustments for Losses: [This Section Was Superseded by Rate Schedule
DSW-TL1]
Capacity and energy losses incurred in connection with the
transmission and delivery of capacity and energy under this rate
schedule shall be supplied by the customer in accordance with the
service agreement or contract.
Overrun of Capacity Reserved: [This Section Was Superseded by Rate
Schedule DSW-UU1]
Western will assess a charge for unauthorized use of transmission
service at a rate equal to two times the applicable rate for the
service at issue. The charge will be applied to use in excess of the
reservation amount, which shall be the difference between the amount of
transmission service actually used by the customer less the amount of
transmission service the customer has reserved. The customer will incur
the charge for an overrun during the calendar month or for the period
of transmission service if such service is for a term of less than one
month.
Rate Schedule PD-NFT7
(Supersedes Schedule PD-NFT6)
United States Department of Energy Western Area Power Administration
Parker-Davis Project
Schedule of Rate for Nonfirm Transmission Service
Effective
The first day of the first full billing period beginning on or
after October 1, 2008, through September 30, 2013, or until superseded,
whichever occurs earlier. [Note: This rate schedule was extended by
Rate Order No. WAPA-162 through September 30, 2018, and by Rate Order
No. WAPA-184 through September 30, 2023, and by Rate Order No. WAPA-210
through September 30, 2024.]
Available
In the area served by the Parker-Davis Project (P-DP).
Applicable
To nonfirm transmission service customers where capacity and energy
are supplied to the P-DP system at points of interconnection with other
systems and transmitted and delivered, less losses, to points of
delivery on the P-DP system.
Character and Conditions of Service
Alternating current at 60 hertz, three-phase, delivered and metered
at the voltages and points of delivery established by service agreement
or contract.
Rate
The nonfirm transmission service rate for each kilowatt per hour is
equal to the annual transmission revenue requirement divided by the
estimated transmission delivery commitments, divided by 8,760 and
rounded to five decimal places. Discounts may be offered from time to
time in accordance with Western's Open Access Transmission Tariff.
Billing
Western will bill nonfirm transmission customers monthly by
applying the nonfirm rate under this rate schedule to the amount of
capacity reserved.
Adjustments for Reactive Power
There shall be no entitlement to transfer of reactive kilovolt-
amperes at delivery points, except when such transfers may be mutually
agreed upon by the customer and Western or their authorized
representatives.
Adjustments for Losses: [This Section Was Superseded by Rate Schedule
DSW-TL1]
Capacity and energy losses incurred in connection with the
transmission and delivery of capacity and energy under this rate
schedule shall be supplied by the customer in accordance with the
service agreement or contract.
[FR Doc. 2023-18737 Filed 8-29-23; 8:45 am]
BILLING CODE 6450-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.