Air Plan Approval; Michigan; DTE River Rouge
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
The Environmental Protection Agency (EPA) is approving a request submitted by the Michigan Department of Environment, Great Lakes, and Energy (EGLE) on January 12, 2023, and supplemented on April 19, 2023, to revise the Michigan state implementation plan (SIP) for particulate matter (PM). The revision updates the fugitive dust plan for the Detroit Edison--River Rouge Power Plant (DTE Energy) located in River Rouge, Michigan. The facility is no longer in operation and therefore, the plan eliminates requirements to reflect plant shut down.
Full Text
<html>
<head>
<title>Federal Register, Volume 88 Issue 140 (Monday, July 24, 2023)</title>
</head>
<body><pre>
[Federal Register Volume 88, Number 140 (Monday, July 24, 2023)]
[Rules and Regulations]
[Pages 47377-47379]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2023-15404]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-R05-OAR-2023-0031; FRL-10954-02-R5]
Air Plan Approval; Michigan; DTE River Rouge
AGENCY: Environmental Protection Agency (EPA).
ACTION: Direct final rule.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency (EPA) is approving a
request submitted by the Michigan Department of Environment, Great
Lakes, and Energy (EGLE) on January 12, 2023, and supplemented on April
19, 2023, to revise the Michigan state implementation plan (SIP) for
particulate matter (PM). The revision updates the fugitive dust plan
for the Detroit Edison--River Rouge Power Plant (DTE Energy) located in
River Rouge, Michigan. The facility is no longer in operation and
therefore, the plan eliminates requirements to reflect plant shut down.
DATES: This direct final rule will be effective September 22, 2023,
unless EPA receives adverse comments by August 23, 2023. If adverse
comments are received, EPA will publish a timely withdrawal of the
direct final rule in the Federal Register informing the public that the
rule will not take effect.
ADDRESSES: Submit your comments, identified by Docket ID No. EPA-R05-
OAR-2023-0031 at <a href="https://www.regulations.gov">https://www.regulations.gov</a> or via email to
<a href="/cdn-cgi/l/email-protection#b3d1dfd2d8dfd6ca9dc3d2ded6dfd2f3d6c3d29dd4dcc5"><span class="__cf_email__" data-cfemail="47252b262c2b223e6937262a222b260722372669202831">[email protected]</span></a>. For comments submitted at <a href="http://Regulations.gov">Regulations.gov</a>,
follow the online instructions for submitting comments. Once submitted,
comments cannot be edited or removed from <a href="http://Regulations.gov">Regulations.gov</a>. For either
manner of submission, EPA may publish any comment received to its
public docket. Do not submit electronically any information you
consider to be Confidential Business Information (CBI) or other
information whose disclosure is restricted by statute. Multimedia
submissions (audio, video, etc.) must be accompanied by a written
comment. The written comment is considered the official comment and
should include discussion of all points you wish to make. EPA will
generally not consider comments or comment contents located
[[Page 47378]]
outside of the primary submission (i.e., on the web, cloud, or other
file sharing system). For additional submission methods, please contact
the person identified in the FOR FURTHER INFORMATION CONTACT section.
For the full EPA public comment policy, information about CBI or
multimedia submissions, and general guidance on making effective
comments, please visit <a href="https://www2.epa.gov/dockets/commenting-epa-dockets">https://www2.epa.gov/dockets/commenting-epa-dockets</a>.
FOR FURTHER INFORMATION CONTACT: Charles Hatten, Environmental
Engineer, Control Strategies Section, Air Programs Branch (AR-18J),
Environmental Protection Agency, Region 5, 77 West Jackson Boulevard,
Chicago, Illinois 60604, (312) 886-6031, <a href="/cdn-cgi/l/email-protection#2d454c59594843034e454c5f41485e6d485d4c034a425b"><span class="__cf_email__" data-cfemail="f199908585949fdf929990839d9482b1948190df969e87">[email protected]</span></a>. The
EPA Region 5 office is open from 8:30 a.m. to 4:30 p.m., Monday through
Friday, excluding Federal holidays and facility closures due to COVID-
19.
SUPPLEMENTARY INFORMATION: Throughout this document whenever ``we,''
``us,'' or ``our'' is used, we mean EPA.
I. General Information
On January 12, 2023, EGLE submitted a revision to the fugitive dust
plan (FDP) for DTE Energy River Rouge facility. The original FDP was
approved into the SIP on January 17, 1995 (60 FR 3346), pursuant to
Consent Order No. 9-1993. The purpose of the FDP was to reduce the PM
emissions of fugitive dust from coal handling activities, exposed areas
and storage piles, and vehicle traffic while the facility was in
operation. In 2021, DTE Energy retired their coal-fired boilers, and
thus, no longer functioned as a base-load power plant. In 2022, DTE
Energy no longer served as a coal handling and processing plant for the
steel mill operations at Cleveland-Cliffs in Dearborn and U.S. Steel in
River Rouge.
In accordance with the stipulation 13.B.(1) of the Consent Order,
DTE Energy may revise the Control Program provided that: (a) DTE Energy
demonstrates, in writing, that the proposed revision does not result in
an increase in the level of fugitive dust or particulate emissions and
submits the demonstration to the EGLE for approval; (b) The revision is
approved.
The changes to the FDP, as determined by EGLE, will not increase in
the level of fugitive dust emissions at DTE Energy. The facility is
adjusting its FDP to reflect that it has shut down and no longer
necessary to implement the measures needed to address air quality
issues associated with coal handling activities, vehicle traffic, and
retirement of equipment with coal processing. Therefore, no increased
PM emissions will result. Since the plant has ceased operations EGLE
approved the revised FDP for the DTE Energy facility.
II. What action is EPA taking?
EPA is approving a revision to the FDP for DTE Energy into the
Michigan SIP. The revision to the FDP will not result in an increase in
fugitive dust emissions at the DTE Energy facility.
We are publishing this action without prior proposal because we
view this as a noncontroversial amendment and anticipate no adverse
comments. However, in the proposed rules section of this Federal
Register publication, we are publishing a separate document that will
serve as the proposal to approve the state plan if relevant adverse
written comments are filed. This rule will be effective September 22,
2023 without further notice unless we receive relevant adverse written
comments by August 23, 2023. If we receive such comments, we will
withdraw this action before the effective date by publishing a
subsequent document that will withdraw the final action. All public
comments received will then be addressed in a subsequent final rule
based on the proposed action. EPA will not institute a second comment
period. Any parties interested in commenting on this action should do
so at this time. Please note that if EPA receives adverse comment on an
amendment, paragraph, or section of this rule and if that provision may
be severed from the remainder of the rule, EPA may adopt as final those
provisions of the rule that are not the subject of an adverse comment.
If we do not receive any comments, this action will be effective
September 22, 2023.
III. Incorporation by Reference
In this rule, EPA is finalizing regulatory text that includes
incorporation by reference. In accordance with requirements of 1 CFR
51.5, EPA is finalizing the incorporation by reference of the Michigan
Consent Order described in section I. of this preamble and set forth in
the amendments to 40 CFR part 52 below. EPA has made, and will continue
to make, these documents generally available through
<a href="http://www.regulations.gov">www.regulations.gov</a> and at the EPA Region 5 Office (please contact the
person identified in the FOR FURTHER INFORMATION CONTACT section of
this preamble for more information). Therefore, these materials have
been approved by EPA for inclusion in the SIP, have been incorporated
by reference by EPA into that plan, are fully federally enforceable
under sections 110 and 113 of the Clean Air Act (CAA) as of the
effective date of the final rulemaking of EPA's approval, and will be
incorporated by reference in the next update to the SIP compilation.\1\
---------------------------------------------------------------------------
\1\ 62 FR 27968 (May 22, 1997).
---------------------------------------------------------------------------
IV. Statutory and Executive Order Reviews
Under the CAA, the Administrator is required to approve a SIP
submission that complies with the provisions of the CAA and applicable
Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in
reviewing SIP submissions, EPA's role is to approve state choices,
provided that they meet the criteria of the CAA. Accordingly, this
action merely approves state law as meeting Federal requirements and
does not impose additional requirements beyond those imposed by state
law. For that reason, this action:
<bullet> Is not a significant regulatory action subject to review
by the Office of Management and Budget under Executive Orders 12866 (58
FR 51735, October 4, 1993), 13563 (76 FR 3821, January 21, 2011), and
14094 (88 FR 21879, April 11, 2023);
<bullet> Does not impose an information collection burden under the
provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
<bullet> Is certified as not having a significant economic impact
on a substantial number of small entities under the Regulatory
Flexibility Act (5 U.S.C. 601 et seq.);
<bullet> Does not contain any unfunded mandate or significantly or
uniquely affect small governments, as described in the Unfunded
Mandates Reform Act of 1995 (Pub. L. 104-4);
<bullet> Does not have Federalism implications as specified in
Executive Order 13132 (64 FR 43255, August 10, 1999);
<bullet> Is not subject to Executive Order 13045 (62 FR 19885,
April 23, 1997) because it approves a state program;
<bullet> Is not a significant regulatory action subject to
Executive Order 13211 (66 FR 28355, May 22, 2001);
<bullet> Is not subject to requirements of Section 12(d) of the
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272
note) because application of those requirements would be inconsistent
with the CAA; and
<bullet> Does not provide EPA with the discretionary authority to
address, as appropriate, disproportionate human health or environmental
effects, using practicable and legally permissible methods, under
Executive Order 12898 (59 FR 7629, February 16, 1994).
[[Page 47379]]
In addition, the SIP is not approved to apply on any Indian
reservation land or in any other area where EPA or an Indian tribe has
demonstrated that a tribe has jurisdiction. In those areas of Indian
country, the rule does not have tribal implications and will not impose
substantial direct costs on tribal governments or preempt tribal law as
specified by Executive Order 13175 (65 FR 67249, November 9, 2000).
Executive Order 12898 (Federal Actions To Address Environmental
Justice in Minority Populations and Low-Income Populations, 59 FR 7629,
February 16, 1994) directs Federal agencies to identify and address
``disproportionately high and adverse human health or environmental
effects'' of their actions on minority populations and low-income
populations to the greatest extent practicable and permitted by law.
EPA defines environmental justice (EJ) as ``the fair treatment and
meaningful involvement of all people regardless of race, color,
national origin, or income with respect to the development,
implementation, and enforcement of environmental laws, regulations, and
policies.'' EPA further defines the term fair treatment to mean that
``no group of people should bear a disproportionate burden of
environmental harms and risks, including those resulting from the
negative environmental consequences of industrial, governmental, and
commercial operations or programs and policies.''
EGLE did not evaluate environmental justice considerations as part
of its SIP submittal; the CAA and applicable implementing regulations
neither prohibit nor require such an evaluation. EPA did not perform an
EJ analysis and did not consider EJ in this action. Due to the nature
of the action being taken here, this action is expected to have a
neutral to positive impact on the air quality of the affected area.
Consideration of EJ is not required as part of this action, and there
is no information in the record inconsistent with the stated goal of
E.O. 12898 of achieving environmental justice for people of color, low-
income populations, and Indigenous peoples.
This action is subject to the Congressional Review Act, and EPA
will submit a rule report to each House of the Congress and to the
Comptroller General of the United States. This action is not a ``major
rule'' as defined by 5 U.S.C. 804(2).
Under section 307(b)(1) of the CAA, petitions for judicial review
of this action must be filed in the United States Court of Appeals for
the appropriate circuit by September 22, 2023. Filing a petition for
reconsideration by the Administrator of this final rule does not affect
the finality of this action for the purposes of judicial review nor
does it extend the time within which a petition for judicial review may
be filed, and shall not postpone the effectiveness of such rule or
action. Parties with objections to this direct final rule are
encouraged to file a comment in response to the parallel notice of
proposed rulemaking for this action published in the proposed rules
section of this Federal Register, rather than file an immediate
petition for judicial review of this direct final rule, so that EPA can
withdraw this direct final rule and address the comment in the proposed
rulemaking. This action may not be challenged later in proceedings to
enforce its requirements. (See section 307(b)(2).)
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Incorporation by
reference, Intergovernmental relations, Particulate matter, Reporting
and recordkeeping requirements.
Dated: July 13, 2023.
Debra Shore,
Regional Administrator, Region 5.
For the reasons stated in the preamble, 40 CFR part 52 is amended
as follows:
PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS
0
1. The authority citation for part 52 continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
0
2. In Sec. 52.1170, the table in paragraph (d) is amended by revising
the entry for ``Detroit Edison Company, River Rouge Power Plant, Wayne
County'' to read as follows:
Sec. 52.1170 Identification of plan.
* * * * *
(d) * * *
EPA--Approved Michigan Source-Specific Provisions
----------------------------------------------------------------------------------------------------------------
State
Name of source Order No. effective date EPA approval date Comments
----------------------------------------------------------------------------------------------------------------
* * * * * * *
Detroit Edison Company, River 9-1993 10/12/1994 7/24/2023, [INSERT Includes revised
Rouge Power Plant, Wayne County. FEDERAL REGISTER Fugitive Dust
CITATION]. Control Plan.
* * * * * * *
----------------------------------------------------------------------------------------------------------------
* * * * *
[FR Doc. 2023-15404 Filed 7-21-23; 8:45 am]
BILLING CODE 6560-50-P