Notice2023-14990
Spencer Mountain Hydropower, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
July 14, 2023
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 88 Issue 134 (Friday, July 14, 2023)</title>
</head>
<body><pre>
[Federal Register Volume 88, Number 134 (Friday, July 14, 2023)]
[Notices]
[Pages 45197-45198]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2023-14990]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2607-016]
Spencer Mountain Hydropower, LLC; Notice of Application Tendered
for Filing With the Commission and Soliciting Additional Study Requests
and Establishing Procedural Schedule for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent License.
b. Project No.: 2607-016.
c. Date filed: June 26, 2023.
d. Applicant: Spencer Mountain Hydropower, LLC.
e. Name of Project: Spencer Mountain Hydroelectric Project (Spencer
Mountain Project).
f. Location: On the South Fork Catawba River, near the town of
Gastonia, in Gaston County, North Carolina.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Kevin Edwards and Mrs. Amy Edwards,
Spencer Mountain Hydropower, LLC, 916 Comer Rd., Stoneville, NC 27048;
Phone at (336) 589-6138, or <a href="/cdn-cgi/l/email-protection#77041a1f0e13051837071f03465914181a"><span class="__cf_email__" data-cfemail="02716f6a7b66706d42726a76332c616d6f">[email protected]</span></a>.
i. FERC Contact: Michael Spencer at (202) 502-6093, or
<a href="/cdn-cgi/l/email-protection#6b060208030a0e0745181b0e05080e192b0d0e1908450c041d"><span class="__cf_email__" data-cfemail="83eeeae0ebe2e6efadf0f3e6ede0e6f1c3e5e6f1e0ade4ecf5">[email protected]</span></a>.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: September 8, 2023.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at <a href="http://www.ferc.gov/docs-filing/efiling.asp">http://www.ferc.gov/docs-filing/efiling.asp</a>. For assistance, please contact FERC Online Support
at <a href="/cdn-cgi/l/email-protection#30767562737f5e5c595e55634540405f424470565542531e575f46"><span class="__cf_email__" data-cfemail="f3b5b6a1b0bc9d9f9a9d96a08683839c8187b395968190dd949c85">[email protected]</span></a>, (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, you may submit a paper
copy. Submissions sent via the U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent
via any other carrier must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. All filings must clearly identify the
project name and docket number on the first page: Spencer Mountain
Project (P-2607-016).
m. The application is not ready for environmental analysis at this
time.
n. The Spencer Mountain Project consists of the following existing
facilities: (1) a 12-foot-high, 636-foot-long masonry and rubble dam
with a crest elevation of 634.7 feet mean sea level (msl); (2) a 68-
acre reservoir with a storage capacity of 166 acre-feet; (3) a 58.9-
foot-long canal headwork, consisting of four 6-foot-wide gates; (4) a
53.8-foot-long canal spillway
[[Page 45198]]
connected to the downstream side of the canal headwork; (5) a 30-foot-
wide, 10-foot-deep, 3,644-foot-long open earthen canal; (6) a 32-foot-
wide trashrack at the powerhouse forebay; (7) a 36-inch-diameter bypass
pipe; (8) a 22.5-foot-high, 49.5-foot-long, 48.75-foot-wide powerhouse
containing two Francis-type generating units with a total capacity of
0.64 megawatts; (9) a concrete lined tailrace discharging flows back
into the South Fork Catawba River; (10) a substation containing a 2.3/
44-kilovolt (kV) transformer and interconnection to Duke Energy's 44kV
transmission line; and (11) appurtenant facilities.
The project operates in a run-of-river mode with a minimum bypass
flow of 76 cubic feet per second. Spencer Mountain Hydropower, LLC
proposes no changes to the project facilities or operations. The
project has an average annual generation of 4,064 megawatt-hours.
o. Copies of the application may be viewed on the Commission's
website at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document (P-2607). For assistance, contact FERC
Online Support at <a href="/cdn-cgi/l/email-protection#7d3b382f3e3213111413182e080d0d120f093d1b180f1e531a120b"><span class="__cf_email__" data-cfemail="ffb9baadbcb0919396919aac8a8f8f908d8bbf999a8d9cd1989089">[email protected]</span></a> or call toll-free, (866)
208-3676 or (202) 502-8659 (TTY).
You may also register online at <a href="http://www.ferc.gov/docs-filing/esubscription.asp">http://www.ferc.gov/docs-filing/esubscription.asp</a> to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#58170808183e3d2a3b763f372e"><span class="__cf_email__" data-cfemail="024d525242646770612c656d74">[email protected]</span></a>.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary schedule. Revisions
to the schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)--August 2023
Request Additional Information (if necessary)--September 2023
Issue Acceptance Letter--November 2023
Issue Scoping Document 1 for comments--November 2023
Issue Scoping Document 2 (if necessary)--January 2024
Issue Notice of Ready for Environmental Analysis--February 2024
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: July 10, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-14990 Filed 7-13-23; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on July 14, 2023.