Notice2023-12946
Florida Gas Transmission Company, LLC; Notice of Application and Establishing Intervention Deadline
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
June 16, 2023
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 88 Issue 116 (Friday, June 16, 2023)</title>
</head>
<body><pre>
[Federal Register Volume 88, Number 116 (Friday, June 16, 2023)]
[Notices]
[Pages 39418-39420]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2023-12946]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-492-000]
Florida Gas Transmission Company, LLC; Notice of Application and
Establishing Intervention Deadline
Take notice that on June 2, 2023, Florida Gas Transmission Company,
LLC, (FGT) 1300 Main St., Houston, Texas 77002, filed an application
under section 7(c) of the Natural Gas Act (NGA), and part 157 and 284
of the Federal Energy Regulatory Commission's (Commission) requesting
the authorization to increase the certificated capacity by increasing
certain compression station from construct, install, modify, operate
and maintain its Louisiana Project located at St. Landry, East Baton
Rouge, and Washington Parishes, Louisiana and Perry County, Mississippi
which will provide an additional 100,000 million cubic feet per day of
firm transportation service back into FGT's Zone 2 and provide gas to
downstream customers from power generation and local distribution
companies.
Specifically, FGT is requesting approval to (1) uprate two existing
natural gas-fired compressor turbine units (Units 7501 and 7502), each
from 6,500 horsepower (HP); to 7,700 HP at its Compressor station (CS)
7.5 in St. Landry Parish, Louisiana; (2) At CS (8), add process cooling
units to support the existing gas compressor units at FGT's existing
Mainline in East Baton Rouge Parish; (3) At CS 9, install one new 7,700
HP natural gas-fired turbine compressor unit on FGT's Mainline in
Washington Parish, Louisiana; (4) At CS 10, install one new 15,900 HP
natural gas-fired turbine compressor unit on FGT's Mainline in Perry
County, Mississippi; (5) The total estimated cost
[[Page 39419]]
of the project is approximately $74.9 million, all as more fully set
forth in the request which is on file with the Commission and open to
public inspection.
In addition to publishing the full text of this document in the
Federal Registerthe Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (<a href="http://www.ferc.gov">www.ferc.gov</a>) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room. For assistance, contact the Federal Energy Regulatory
Commission at <a href="/cdn-cgi/l/email-protection#2b6d4e594864454742454e785e5b5b44595f6b4d4e5948054c445d"><span class="__cf_email__" data-cfemail="fdbb988f9eb29391949398ae888d8d928f89bd9b988f9ed39a928b">[email protected]</span></a> or call toll-free, (886) 208-
3676 or TTY (202) 502-8659.
Any questions concerning this request should be directed to Blair
Lichtenwalter, Senior Director, Certificates, Florida Gas Transmission
Company, LLC., 4700 1300 Main St. P.O. Box 4967, Houston, Texas 77210-
4967, by phone at (713) 989-2605, or by email at
<a href="/cdn-cgi/l/email-protection#81c3ede0e8f3afcde8e2e9f5e4eff6e0edf5e4f3c1e4efe4f3e6f8f5f3e0eff2e7e4f3afe2eeec"><span class="__cf_email__" data-cfemail="95d7f9f4fce7bbd9fcf6fde1f0fbe2f4f9e1f0e7d5f0fbf0e7f2ece1e7f4fbe6f3f0e7bbf6faf8">[email protected]</span></a>.
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on July 3, 2023. How
to file protests, motions to intervene, and comments is explained
below.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or <a href="/cdn-cgi/l/email-protection#ace3fcfceccac9decf82cbc3da"><span class="__cf_email__" data-cfemail="49061919092f2c3b2a672e263f">[email protected]</span></a>.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\1\ any person \2\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\1\ 18 CFR 157.205.
\2\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\3\ and must be submitted by
the protest deadline, which is July 3, 2023. A protest may also serve
as a motion to intervene so long as the protestor states it also seeks
to be an intervenor.
---------------------------------------------------------------------------
\3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is July 3, 2023. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at <a href="https://www.ferc.gov/resources/guides/how-to/intervene.asp">https://www.ferc.gov/resources/guides/how-to/intervene.asp</a>.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before July 3, 2023. The filing of a comment alone will not serve
to make the filer a party to the proceeding. To become a party, you
must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP23-492-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (<a href="http://www.ferc.gov">www.ferc.gov</a>) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select ``General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \6\
---------------------------------------------------------------------------
\6\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at <a href="http://www.ferc.gov">www.ferc.gov</a> under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
(2) You can file a paper copy of your submission by mailing it to
the address below. Your submission must reference the Project docket
number CP23-483-000.
To file via USPS: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
To file via any other method: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland
20852.
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available
[[Page 39420]]
to assist you at (202) 502-8258 or <a href="/cdn-cgi/l/email-protection#bcfad9cedff3d2d0d5d2d9efc9ccccd3cec8fcdad9cedf92dbd3ca"><span class="__cf_email__" data-cfemail="8ccae9feefc3e2e0e5e2e9dff9fcfce3fef8cceae9feefa2ebe3fa">[email protected]</span></a>.
Protests and motions to intervene must be served on the applicant
either by mail or email (with a link to the document) at: Blair
Lichtenwalter, Senior Director, Certificates, Florida Gas Transmission
Company, LLC., 4700 1300 Main St. P.O. Box 4967, Houston, Texas 77210-
4967, or by email at <a href="/cdn-cgi/l/email-protection#f1b39d909883dfbd98929985949f86909d859483b1949f948396888583909f82979483df929e9c"><span class="__cf_email__" data-cfemail="2c6e404d455e0260454f445849425b4d4058495e6c4942495e4b55585e4d425f4a495e024f4341">[email protected]</span></a>. Any
subsequent submissions by an intervenor must be served on the applicant
and all other parties to the proceeding. Contact information for
parties can be downloaded from the service list at the eService link on
FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at <a href="http://www.ferc.gov">www.ferc.gov</a> using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
<a href="http://www.ferc.gov/docs-filing/esubscription.asp">www.ferc.gov/docs-filing/esubscription.asp</a>.
Dated: June 12, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-12946 Filed 6-15-23; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on June 16, 2023.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.