Notice2023-12391
Grand River Dam Authority; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
June 12, 2023
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 88 Issue 112 (Monday, June 12, 2023)</title>
</head>
<body><pre>
[Federal Register Volume 88, Number 112 (Monday, June 12, 2023)]
[Notices]
[Pages 38043-38044]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2023-12391]
[[Page 38043]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1494-461]
Grand River Dam Authority; Notice of Application Tendered for
Filing With the Commission and Establishing Procedural Schedule for
Licensing and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 1494-461.
c. Date Filed: May 30, 2023.
d. Applicant: Grand River Dam Authority (GRDA).
e. Name of Project: Pensacola Hydroelectric Project (Pensacola
Project).
f. Location: The Pensacola Project is located on the Grand (Neosho)
River in Craig, Delaware, Mayes, and Ottawa Counties, Oklahoma. The
project occupies 8.122 acres of federal Trust Land held by the Bureau
of Indian Affairs and 57.69 acres of federal wetland easements.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Darrell Townsend II, Vice President,
Ecosystems and Watershed Management, Grand River Dam Authority, P.O.
Box 70, Langley, OK 74350; (918) 981-8472, or email at
<a href="/cdn-cgi/l/email-protection#8de9ecffffe8e1e1a3f9e2fae3fee8e3e9cdeaffe9eca3eee2e0"><span class="__cf_email__" data-cfemail="197d786b6b7c7575376d766e776a7c777d597e6b7d78377a7674">[email protected]</span></a>.
i. FERC Contact: Adam Peer at (202) 502-8449, or email at
<a href="/cdn-cgi/l/email-protection#6f0e0b0e02411f0a0a1d2f090a1d0c41080019"><span class="__cf_email__" data-cfemail="45242124286b3520203705232037266b222a33">[email protected]</span></a>.
j. This application is not ready for environmental analysis at this
time.
k. The Pensacola Project consists of: (1) a reservoir--known as
Grand Lake O' the Cherokees (Grand Lake)--with a surface area of 46,056
acres and a storage capacity of 1,440,000 acre-feet at a water surface
elevation of 745 feet Pensacola Datum (PD; Pensacola Datum is 1.07 feet
lower than National Geodetic Vertical Datum of 1928 [NGVD29] and 1.4
feet higher than North American Vertical Datum of 1988 [NAVD88]); (2) a
reinforced-concrete dam consisting of: (a) a west abutment connected to
a 28-foot-long, west non-overflow gravity section; (b) a 4,284-foot-
long, multiple arch section; (c) an 860-foot-long main spillway
containing 21 radial gates; (d) an east abutment connected to a 451-
foot-long, east non-overflow gravity section; (e) a 450-foot-long
middle spillway section containing 11 radial gates located 0.9 mile
east of the east abutment; and (f) a 410-foot-long east spillway
section containing 10 radial gates located 700 feet east of the middle
spillway section; (3) a 23-foot-wide by 75-foot-high intake structure
and trash racks with 3.75-inch bar spacing; (4) six 15-foot-diameter
penstocks supplying flow to the main powerhouse; (5) an 87.75-foot-wide
by 279-foot-long by 45-foot-tall, multi-story, reinforced concrete main
powerhouse containing six generating units of 17,466-kilowatt (kW)
capacity each; (6) a 3-foot-diamater penstock that supplies flow to one
turbine-generator of 500-kW capacity located in a powerhouse
immediately downstream from the dam; (7) an approximate 270-foot-wide,
7,500-foot-long tailrace; (8) single spillway channels located
downstream of each of the three spillway sections; (9) six 450 to 650-
foot-long, 13.8-kilovolt generator leads connecting the turbine-
generator units in the powerhouse to the project switching station; and
(10) appurtenant facilities.
Under existing normal operation, when the reservoir surface
elevation is below the flood pool elevation of 745 feet PD, the
Pensacola Project is operated to target reservoir surface elevations
known as the rule curve, which are as follows:
----------------------------------------------------------------------------------------------------------------
Period Reservoir elevation (feet PD)
----------------------------------------------------------------------------------------------------------------
May 1 through May 31........................ Raise elevation from 742 to 744.
June 1 through July 31...................... Maintain elevation at 744.
August 1 through August 15.................. Lower elevation from 744 to 743.
August 16 through September 15.............. Maintain elevation at 743.
September 16 through September 30........... Lower elevation from 743 to 742.
October 1 through April 30.................. Maintain elevation at 742.
----------------------------------------------------------------------------------------------------------------
When reservoir elevations are either above or projected to rise
above the flood pool elevation of 745 feet PD, the U.S. Army Corps of
Engineers (Corps) directs water releases from the project under the
terms of Section 7 of the Flood Control Act of 1944. When directed to
release water, GRDA first discharges as much water as possible through
the project's turbine units. Once the project has reached the project's
maximum hydraulic capacity, the Corps may direct GRDA to open one or
more spillway gates if the reservoir is still rising, but typically not
unless the reservoir elevation exceeds or is projected to exceed 745
feet PD.
GRDA implements a Storm Adaptive Management Plan (SAMP) that is
used in anticipation of and during major precipitation events within
the Grand/Neosho River basin that may result in high water conditions
upstream or downstream of Grand Lake. If available information
indicates a high probability of high water occurring, GRDA consults
with the Corps to determine whether the flood pool elevation is
forecasted to exceed 745 feet PD and determine whether any reservoir
management actions can be taken to avoid, reduce, or minimize high
water levels upstream or downstream of the project.
GRDA currently implements a Drought Adaptive Management Plan (DAMP)
that guides project operations and flow releases in the event of
significant drought conditions. GRDA also implements a Dissolved Oxygen
Mitigation Plan that involves continuously monitoring dissolved oxygen
(DO) downstream of the project dam and initiating turbine releases when
DO drops below 6.5 milligrams per liter (mg/L) from October 16 to June
15 and 5.5 mg/L from June 16 to October 15.
During normal operation, GRDA proposes to no longer use a rule
curve with seasonal target reservoir elevations. Instead, GRDA proposes
to maintain the reservoir elevation between 742 feet and 745 feet PD
year-round for the purposes of responding to grid demands, market
conditions, and public interest.
GRDA proposes to continue implementing the DO Mitigation Plan, but
GRDA proposes to no longer implement the SAMP and DAMP.
l. In addition to publishing the full text of this notice in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this notice, as well
as other documents in the proceeding (e.g., license application)
[[Page 38044]]
via the internet through the Commission's Home Page (<a href="http://www.ferc.gov">http://www.ferc.gov</a>) using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document (P-1494). For assistance, contact FERC at
<a href="/cdn-cgi/l/email-protection#30767562737f5e5c595e55634540405f424470565542531e575f46"><span class="__cf_email__" data-cfemail="0d4b485f4e4263616463685e787d7d627f794d6b687f6e236a627b">[email protected]</span></a>, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). At this time, the Commission has suspended access to the
Commission's Public Reference Room. For assistance, contact FERC at
<a href="/cdn-cgi/l/email-protection#195f5c4b5a56777570777c4a6c6969766b6d597f7c6b7a377e766f"><span class="__cf_email__" data-cfemail="22646770616d4c4e4b4c47715752524d505662444750410c454d54">[email protected]</span></a> or call toll free, (886) 208-3676 or TTY
(202) 502-8659.
m. You may also register online at <a href="http://www.ferc.gov/docs-filing/esubscription.asp">http://www.ferc.gov/docs-filing/esubscription.asp</a> to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202)502-6595 or <a href="/cdn-cgi/l/email-protection#6a253a3a2a0c0f1809440d051c"><span class="__cf_email__" data-cfemail="fbb4ababbb9d9e8998d59c948d">[email protected]</span></a>.
o. Procedural schedule: The application will be processed according
to the following preliminary schedule. Revisions to the schedule will
be made as appropriate.
----------------------------------------------------------------------------------------------------------------
Milestone Target date
----------------------------------------------------------------------------------------------------------------
Issue Deficiency Letter (if necessary)...... June 2023.
Request Additional Information (if July 2023.
necessary).
Notice of Acceptance/Notice of Ready for November 2023.
Environmental Analysis.
Filing of recommendations, preliminary terms January 2024.
and conditions, and preliminary fishway
prescriptions.
----------------------------------------------------------------------------------------------------------------
p. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: June 5, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-12391 Filed 6-9-23; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on June 12, 2023.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.