June 6, 2023

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 88 Issue 108 (Tuesday, June 6, 2023)</title>
</head>
<body><pre>
[Federal Register Volume 88, Number 108 (Tuesday, June 6, 2023)]
[Notices]
[Pages 37063-37064]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2023-11932]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD23-8-000]


Moulton Niguel Water District; Notice of Preliminary 
Determination of a Qualifying Conduit Hydropower Facility and 
Soliciting Comments and Motions To Intervene

    On May 23, 2023, Moulton Niguel Water District filed a notice of 
intent to

[[Page 37064]]

construct a qualifying conduit hydropower facility, pursuant to section 
30 of the Federal Power Act (FPA). The proposed Bridlewood Flow Control 
Facility Hydroelectric Energy Recovery Project would have an installed 
capacity of 224 kilowatts (kW), and would be located along the 
applicant's existing water supply system in Laguna Hills, Orange 
County, California.
    Applicant Contact: Gregg Semler, InPipe Energy, 920 SW 6th Ave., 
12th Floor, Portland, OR 97204, 503-341-0004, <a href="/cdn-cgi/l/email-protection#f69184939191b69f98869f869393989384918fd895999b"><span class="__cf_email__" data-cfemail="80e7f2e5e7e7c0e9eef0e9f0e5e5eee5f2e7f9aee3efed">[email&#160;protected]</span></a>.
    FERC Contact: Christopher Chaney, 202-502-6778, 
<a href="/cdn-cgi/l/email-protection#55363d273c26213a253d30277b363d343b302c15333027367b323a23"><span class="__cf_email__" data-cfemail="e18289938892958e91898493cf8289808f8498a187849382cf868e97">[email&#160;protected]</span></a>.
    Qualifying Conduit Hydropower Facility Description: The project 
would consist of: (1) two 112-kW Centrifugal pump as turbine generating 
units and (2) appurtenant facilities. The proposed project would have 
an estimated annual generation of approximately 820 megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all the criteria shown in the table below.

      Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
      Statutory provision              Description       Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A)................  The conduit the                      Y
                                  facility uses is a
                                  tunnel, canal,
                                  pipeline, aqueduct,
                                  flume, ditch, or
                                  similar manmade water
                                  conveyance that is
                                  operated for the
                                  distribution of water
                                  for agricultural,
                                  municipal, or
                                  industrial
                                  consumption and not
                                  primarily for the
                                  generation of
                                  electricity.
FPA 30(a)(3)(C)(i).............  The facility is                      Y
                                  constructed,
                                  operated, or
                                  maintained for the
                                  generation of
                                  electric power and
                                  uses for such
                                  generation only the
                                  hydroelectric
                                  potential of a non-
                                  federally owned
                                  conduit.
FPA 30(a)(3)(C)(ii)............  The facility has an                  Y
                                  installed capacity
                                  that does not exceed
                                  40 megawatts.
FPA 30(a)(3)(C)(iii)...........  On or before August 9,               Y
                                  2013, the facility is
                                  not licensed, or
                                  exempted from the
                                  licensing
                                  requirements of Part
                                  I of the FPA.
------------------------------------------------------------------------

    Preliminary Determination: The proposed Bridlewood Flow Control 
Facility Hydroelectric Energy Recovery Project will not alter the 
primary purpose of the conduit, which is for municipal water supply. 
Therefore, based upon the above criteria, Commission staff 
preliminarily determines that the operation of the project described 
above satisfies the requirements for a qualifying conduit hydropower 
facility, which is not required to be licensed or exempted from 
licensing.
    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 30 
days from the issuance date of this notice. Deadline for filing motions 
to intervene is 30 days from the issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2022).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at <a href="http://www.ferc.gov/docs-filing/efiling.asp">http://www.ferc.gov/docs-filing/efiling.asp</a>. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at <a href="http://www.ferc.gov/docs-filing/ecomment.asp">http://www.ferc.gov/docs-filing/ecomment.asp</a>. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at <a href="/cdn-cgi/l/email-protection#692f2c3b2a26070500070c3a1c1919061b1d290f0c1b0a470e061f"><span class="__cf_email__" data-cfemail="276162756468494b4e494274525757485553674142554409404851">[email&#160;protected]</span></a>, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, you may send a 
paper copy. Submissions sent via the U.S. Postal Service must be 
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, MD 20852. A copy of all other filings in reference 
to this application must be accompanied by proof of service on all 
persons listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 385.2010.
    Locations of Notice of Intent: The Commission provides all 
interested persons an opportunity to view and/or print the contents of 
this document via the internet through the Commission's website at 
<a href="http://www.ferc.gov/docs-filing/elibrary.asp">http://www.ferc.gov/docs-filing/elibrary.asp</a>. Enter the docket number 
(i.e., CD23-8) in the docket number field to access the document. You 
may also register online at <a href="http://www.ferc.gov/docs-filing/esubscription.asp">http://www.ferc.gov/docs-filing/esubscription.asp</a> to be notified via email of new filings and issuances 
related to this or other pending projects. Copies of the notice of 
intent can be obtained directly from the applicant. For assistance, 
call toll-free 1-866-208-3676 or email <a href="/cdn-cgi/l/email-protection#4c0a091e0f0322202522291f393c3c233e380c2a293e2f622b233a"><span class="__cf_email__" data-cfemail="e0a6a5b2a3af8e8c898e85b39590908f9294a086859283ce878f96">[email&#160;protected]</span></a>. For 
TTY, call (202) 502-8659.

    Dated: May 30, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-11932 Filed 6-5-23; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on June 6, 2023.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.