Notice2023-11932
Moulton Niguel Water District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
June 6, 2023
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 88 Issue 108 (Tuesday, June 6, 2023)</title>
</head>
<body><pre>
[Federal Register Volume 88, Number 108 (Tuesday, June 6, 2023)]
[Notices]
[Pages 37063-37064]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2023-11932]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD23-8-000]
Moulton Niguel Water District; Notice of Preliminary
Determination of a Qualifying Conduit Hydropower Facility and
Soliciting Comments and Motions To Intervene
On May 23, 2023, Moulton Niguel Water District filed a notice of
intent to
[[Page 37064]]
construct a qualifying conduit hydropower facility, pursuant to section
30 of the Federal Power Act (FPA). The proposed Bridlewood Flow Control
Facility Hydroelectric Energy Recovery Project would have an installed
capacity of 224 kilowatts (kW), and would be located along the
applicant's existing water supply system in Laguna Hills, Orange
County, California.
Applicant Contact: Gregg Semler, InPipe Energy, 920 SW 6th Ave.,
12th Floor, Portland, OR 97204, 503-341-0004, <a href="/cdn-cgi/l/email-protection#f69184939191b69f98869f869393989384918fd895999b"><span class="__cf_email__" data-cfemail="80e7f2e5e7e7c0e9eef0e9f0e5e5eee5f2e7f9aee3efed">[email protected]</span></a>.
FERC Contact: Christopher Chaney, 202-502-6778,
<a href="/cdn-cgi/l/email-protection#55363d273c26213a253d30277b363d343b302c15333027367b323a23"><span class="__cf_email__" data-cfemail="e18289938892958e91898493cf8289808f8498a187849382cf868e97">[email protected]</span></a>.
Qualifying Conduit Hydropower Facility Description: The project
would consist of: (1) two 112-kW Centrifugal pump as turbine generating
units and (2) appurtenant facilities. The proposed project would have
an estimated annual generation of approximately 820 megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Statutory provision Description Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A)................ The conduit the Y
facility uses is a
tunnel, canal,
pipeline, aqueduct,
flume, ditch, or
similar manmade water
conveyance that is
operated for the
distribution of water
for agricultural,
municipal, or
industrial
consumption and not
primarily for the
generation of
electricity.
FPA 30(a)(3)(C)(i)............. The facility is Y
constructed,
operated, or
maintained for the
generation of
electric power and
uses for such
generation only the
hydroelectric
potential of a non-
federally owned
conduit.
FPA 30(a)(3)(C)(ii)............ The facility has an Y
installed capacity
that does not exceed
40 megawatts.
FPA 30(a)(3)(C)(iii)........... On or before August 9, Y
2013, the facility is
not licensed, or
exempted from the
licensing
requirements of Part
I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: The proposed Bridlewood Flow Control
Facility Hydroelectric Energy Recovery Project will not alter the
primary purpose of the conduit, which is for municipal water supply.
Therefore, based upon the above criteria, Commission staff
preliminarily determines that the operation of the project described
above satisfies the requirements for a qualifying conduit hydropower
facility, which is not required to be licensed or exempted from
licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 30
days from the issuance date of this notice. Deadline for filing motions
to intervene is 30 days from the issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2022).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at <a href="http://www.ferc.gov/docs-filing/efiling.asp">http://www.ferc.gov/docs-filing/efiling.asp</a>. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at <a href="http://www.ferc.gov/docs-filing/ecomment.asp">http://www.ferc.gov/docs-filing/ecomment.asp</a>. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at <a href="/cdn-cgi/l/email-protection#692f2c3b2a26070500070c3a1c1919061b1d290f0c1b0a470e061f"><span class="__cf_email__" data-cfemail="276162756468494b4e494274525757485553674142554409404851">[email protected]</span></a>, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, you may send a
paper copy. Submissions sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, MD 20852. A copy of all other filings in reference
to this application must be accompanied by proof of service on all
persons listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 385.2010.
Locations of Notice of Intent: The Commission provides all
interested persons an opportunity to view and/or print the contents of
this document via the internet through the Commission's website at
<a href="http://www.ferc.gov/docs-filing/elibrary.asp">http://www.ferc.gov/docs-filing/elibrary.asp</a>. Enter the docket number
(i.e., CD23-8) in the docket number field to access the document. You
may also register online at <a href="http://www.ferc.gov/docs-filing/esubscription.asp">http://www.ferc.gov/docs-filing/esubscription.asp</a> to be notified via email of new filings and issuances
related to this or other pending projects. Copies of the notice of
intent can be obtained directly from the applicant. For assistance,
call toll-free 1-866-208-3676 or email <a href="/cdn-cgi/l/email-protection#4c0a091e0f0322202522291f393c3c233e380c2a293e2f622b233a"><span class="__cf_email__" data-cfemail="e0a6a5b2a3af8e8c898e85b39590908f9294a086859283ce878f96">[email protected]</span></a>. For
TTY, call (202) 502-8659.
Dated: May 30, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-11932 Filed 6-5-23; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on June 6, 2023.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.