Notice2023-11241

Natural Gas Pipeline Company of America, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
May 26, 2023

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 88 Issue 102 (Friday, May 26, 2023)</title>
</head>
<body><pre>
[Federal Register Volume 88, Number 102 (Friday, May 26, 2023)]
[Notices]
[Pages 34148-34149]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2023-11241]



[[Page 34148]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP23-477-000]


Natural Gas Pipeline Company of America, LLC; Notice of Request 
Under Blanket Authorization and Establishing Intervention and Protest 
Deadline

    Take notice that on May 10, 2023, Natural Gas Pipeline Company of 
America, LLC (NGPL), 3250 Lacey Road, Suite 700, Downers Grove, 
Illinois 60515, filed in the above referenced docket, a prior notice 
request pursuant to sections 157.205 and 157.216(b) of the Federal 
Energy Regulatory Commission's (Commission) regulations under the 
Natural Gas Act (NGA) and NGPL's blanket certificate issued in Docket 
No. CP82-402-000, seeking authorization to abandon in-place its 
Compressor Station 158 (CS 158) located in Dewey County, Oklahoma 
(Compressor Station 158 Abandonment Project).
    Specifically, NGPL states that the project consists of abandoning 
in-place CS 158 facilities including a 2,745 HP compressor unit, fuel 
gas heater, dehydrator, control room, auxiliary building, odorizer, 
positive meter, waste sump tank, waste oil storage tank, water well, 
meter building, and gas reservoir tank. NGPL states that the project 
will allow abandonment of CS 158 facilities that are no longer required 
due to the changes in receipt and delivery points utilized by shippers 
on its system and the current operating conditions of its Mountain View 
to Minneola (M&M) Line, coupled with the steady decline since 2011 of 
gas produced in the Granite Wash producing area in the Anadarko Basin. 
Thus, NGPL asserts that the operation of CS 158 is not needed to meet 
its existing firm contractual commitments, and NGPL does not anticipate 
CS 158 will be needed to meet future service obligations. NGPL 
estimates the total cost of the Project to be $177,000, all as more 
fully set forth in the application which is on file with the Commission 
and open for public inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (<a href="http://www.ferc.gov">www.ferc.gov</a>) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room. For assistance, contact the Federal Energy Regulatory 
Commission at <a href="/cdn-cgi/l/email-protection#abedced9c8e4c5c7c2c5cef8dedbdbc4d9dfebcdced9c885ccc4dd"><span class="__cf_email__" data-cfemail="3b7d5e495874555752555e684e4b4b54494f7b5d5e4958155c544d">[email&#160;protected]</span></a> or call toll-free, (886) 208-
3676 or TTY (202) 502-8659.
    Any questions concerning this request should be directed to 
Francisco Tarin, Director, Regulatory, for Kinder Morgan Inc., as 
Operator of Natural Gas Pipeline Company of America LLC, 2 North Nevada 
Avenue, Colorado Springs, Colorado 80903, at (719) 667-7515, or 
<a href="/cdn-cgi/l/email-protection#a5c3d7c4cbc6ccd6c6cafad1c4d7cccbe5cecccbc1c0d7c8cad7c2c4cb8bc6cac8"><span class="__cf_email__" data-cfemail="93f5e1f2fdf0fae0f0fccce7f2e1fafdd3f8fafdf7f6e1fefce1f4f2fdbdf0fcfe">[email&#160;protected]</span></a>.

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: you can file a protest to the project, you can file a 
motion to intervene in the proceeding, and you can file comments on the 
project. There is no fee or cost for filing protests, motions to 
intervene, or comments. The deadline for filing protests, motions to 
intervene, and comments is 5:00 p.m. Eastern Time on July 18, 2023. How 
to file protests, motions to intervene, and comments is explained 
below.

Protests

    Pursuant to section 157.205 of the Commission's regulations under 
the NGA,\1\ any person \2\ or the Commission's staff may file a protest 
to the request. If no protest is filed within the time allowed or if a 
protest is filed and then withdrawn within 30 days after the allowed 
time for filing a protest, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request for authorization 
will be considered by the Commission.
---------------------------------------------------------------------------

    \1\ 18 CFR 157.205.
    \2\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------

    Protests must comply with the requirements specified in section 
157.205(e) of the Commission's regulations,\3\ and must be submitted by 
the protest deadline, which is July 18, 2023. A protest may also serve 
as a motion to intervene so long as the protestor states it also seeks 
to be an intervenor.
---------------------------------------------------------------------------

    \3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------

Interventions

    Any person has the option to file a motion to intervene in this 
proceeding. Only intervenors have the right to request rehearing of 
Commission orders issued in this proceeding and to subsequently 
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \4\ and the regulations under the NGA \5\ by the 
intervention deadline for the project, which is July 18, 2023. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the FERC website at <a href="https://www.ferc.gov/resources/guides/how-to/intervene.asp">https://www.ferc.gov/resources/guides/how-to/intervene.asp</a>.
---------------------------------------------------------------------------

    \4\ 18 CFR 385.214.
    \5\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the intervention deadline are untimely and may be denied. 
Any late-filed motion to intervene must show good cause for being late 
and must explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.

Comments

    Any person wishing to comment on the project may do so. The 
Commission considers all comments received about the project in 
determining the appropriate action to be taken. To ensure that your 
comments are timely and properly recorded, please submit your comments 
on or before July 18, 2023. The filing of a comment alone will not 
serve to make the filer a party to the proceeding. To become a party, 
you must intervene in the proceeding.

How To File Protests, Interventions, and Comments

    There are two ways to submit protests, motions to intervene, and 
comments. In both instances, please reference the Project docket number 
CP23-477-000 in your submission.
    (1) You may file your protest, motion to intervene, and comments by 
using the

[[Page 34149]]

Commission's eFiling feature, which is located on the Commission's 
website (<a href="http://www.ferc.gov">www.ferc.gov</a>) under the link to Documents and Filings. New 
eFiling users must first create an account by clicking on 
``eRegister.'' You will be asked to select the type of filing you are 
making; first select General'' and then select ``Protest'', 
``Intervention'', or ``Comment on a Filing''; or \6\
---------------------------------------------------------------------------

    \6\ Additionally, you may file your comments electronically by 
using the eComment feature, which is located on the Commission's 
website at <a href="http://www.ferc.gov">www.ferc.gov</a> under the link to Documents and Filings. 
Using eComment is an easy method for interested persons to submit 
brief, text-only comments on a project.
---------------------------------------------------------------------------

    (2) You can file a paper copy of your submission by mailing it to 
the address below. Your submission must reference the Project docket 
number CP23-477-000.

To file via USPS: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Washington, DC 20426
To file via any other method: Kimberly D. Bose, Secretary, Federal 
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 
20852

    The Commission encourages electronic filing of submissions (option 
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or <a href="/cdn-cgi/l/email-protection#42042730210d2c2e2b2c27113732322d303602242730216c252d34"><span class="__cf_email__" data-cfemail="6b2d0e190824050702050e381e1b1b04191f2b0d0e1908450c041d">[email&#160;protected]</span></a>.
    Protests and motions to intervene must be served on the applicant 
either by mail or email (with a link to the document) at: Francisco 
Tarin, Director, Regulatory, for Kinder Morgan Inc., as Operator of 
Natural Gas Pipeline Company of America LLC, 2 North Nevada Avenue, 
Colorado Springs, Colorado 80903, or <a href="/cdn-cgi/l/email-protection#244256454a474d57474b7b5045564d4a644f4d4a404156494b5643454a0a474b49"><span class="__cf_email__" data-cfemail="c1a7b3a0afa2a8b2a2ae9eb5a0b3a8af81aaa8afa5a4b3acaeb3a6a0afefa2aeac">[email&#160;protected]</span></a>. 
Any subsequent submissions by an intervenor must be served on the 
applicant and all other parties to the proceeding. Contact information 
for parties can be downloaded from the service list at the eService 
link on FERC Online.

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at <a href="http://www.ferc.gov">www.ferc.gov</a> using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
<a href="http://www.ferc.gov/docs-filing/esubscription.asp">www.ferc.gov/docs-filing/esubscription.asp</a>.

    Dated: May 19, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-11241 Filed 5-25-23; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on May 26, 2023.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.