Proposed Information Collection Request; Comment Request
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
The U.S. Environmental Protection Agency (EPA) is planning to submit the below listed information collection requests (ICR) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. Before doing so, EPA is soliciting public comments on specific aspects of the proposed information collection as described below. These are proposed extensions of the currently approved ICRs. An Agency may not conduct or sponsor, and a person is not required, to respond to a collection of information unless it displays a currently valid OMB control number.
Full Text
<html>
<head>
<title>Federal Register, Volume 88 Issue 96 (Thursday, May 18, 2023)</title>
</head>
<body><pre>
[Federal Register Volume 88, Number 96 (Thursday, May 18, 2023)]
[Notices]
[Pages 31748-31754]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2023-10566]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[EPA-HQ-OAR-2003-0152, EPA-HQ-OAR-2011-0371, et al; FRL-10817-01-OAR]
Proposed Information Collection Request; Comment Request
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The U.S. Environmental Protection Agency (EPA) is planning to
submit the below listed information collection requests (ICR) to the
Office of Management and Budget (OMB) for review and approval in
accordance with the Paperwork Reduction Act. Before doing so, EPA is
soliciting public comments on specific aspects of the proposed
information collection as described below. These are proposed
extensions of the currently approved ICRs. An Agency may not conduct or
sponsor, and a person is not required, to respond to a collection of
information unless it displays a currently valid OMB control number.
DATES: Comments must be submitted on or before July 17, 2023.
ADDRESSES: Submit your comments, referencing the Docket ID numbers
provided for each item in the text, online using <a href="http://www.regulations.gov">www.regulations.gov</a>
(our preferred method), by email to <a href="/cdn-cgi/l/email-protection#85e4a8e4ebe1a8f7a8e1eae6eee0f1c5e0f5e4abe2eaf3"><span class="__cf_email__" data-cfemail="e081cd818e84cd92cd848f838b8594a0859081ce878f96">[email protected]</span></a>, or by mail
to: EPA Docket Center, Environmental Protection Agency, Mail Code
28221T, 1200 Pennsylvania Ave. NW, Washington, DC 20460.
The EPA's policy is that all comments received will be included in
the public docket without change including any personal information
provided, unless the comment includes profanity, threats, information
claimed to be Confidential Business Information (CBI) or other
information whose disclosure is restricted by statute.
FOR FURTHER INFORMATION CONTACT: Mr. Muntasir Ali, Sector Policies and
Programs Division, (D243-05), Office of Air Quality Planning and
Standards, U.S. Environmental Protection Agency, Research Triangle
Park, North Carolina 27711; telephone number: (919) 541-0833; email
address: <a href="/cdn-cgi/l/email-protection#7c3d101552310912081d0f150e3c190c1d521b130a"><span class="__cf_email__" data-cfemail="a2e3cecb8cefd7ccd6c3d1cbd0e2c7d2c38cc5cdd4">[email protected]</span></a>.
SUPPLEMENTARY INFORMATION: Supporting documents which explain in detail
the information that the EPA will be collecting are available in the
public docket for this ICR. The docket can be viewed online at
<a href="http://www.regulations.gov">www.regulations.gov</a> or in person at the EPA Docket Center, WJC West,
Room 3334, 1301 Constitution Ave. NW, Washington, DC.
[[Page 31749]]
The telephone number for the Docket Center is 202-566-1744. For
additional information about EPA's public docket, visit <a href="http://www.epa.gov/dockets">http://www.epa.gov/dockets</a>.
Pursuant to section 3506(c)(2)(A) of the PRA, EPA is soliciting
comments and information to enable it to: (i) evaluate whether the
proposed collection of information is necessary for the proper
performance of the functions of the Agency, including whether the
information will have practical utility; (ii) evaluate the accuracy of
the Agency's estimate of the burden of the proposed collection of
information, including the validity of the methodology and assumptions
used; (iii) enhance the quality, utility, and clarity of the
information to be collected; and (iv) minimize the burden of the
collection of information on those who are to respond, including
through the use of appropriate automated electronic, mechanical, or
other technological collection techniques or other forms of information
technology, e.g., permitting electronic submission of responses. Burden
is defined at 5 CFR 1320.03(b). EPA will consider the comments received
and amend the ICR as appropriate. The final ICR package will then be
submitted to OMB for review and approval. At that time, EPA will issue
another Federal Register notice to announce the submission of the ICR
to OMB and the opportunity to submit additional comments to OMB.
General Abstract: For all the listed ICRs in this notice, owners
and operators of affected facilities are required to comply with
reporting and record keeping requirements for the general provisions of
40 CFR part 60, subpart A or part 63, subpart A, as well as the
applicable specific standards. This includes submitting initial
notifications, performance tests and periodic reports and results, and
maintaining records of the occurrence and duration of any startup,
shutdown, or malfunction in the operation of an affected facility, or
any period during which the monitoring system is inoperative. These
reports are used by EPA to determine compliance with the standards.
(1) Docket ID Number: EPA-HQ-OAR-2007-0563; National Volatile
Organic Compound Emission Standards for Consumer Products (40 CFR part
59, subpart C) (Renewal); EPA ICR Number 1764.09; OMB Control Number
2060-0348; Expiration date August 31, 2023.
Respondents: Manufacturers, importers, and named distributors of
consumer products.
Respondent's obligation to respond: Mandatory (40 CFR part 59
subpart C).
Estimated number of respondents: 732.
Frequency of response: Initially.
Estimated annual burden: 16,126 hours.
Estimated annual costs: $1,765,427, includes $0 annualized capital
or O&M costs.
Changes in estimates: There is no change in the labor hours or
capital and O&M costs to the respondents in this ICR compared to the
previous ICR because the regulations have not changed over the past
three years and are not anticipated to change over the next three
years.
(2) Docket ID Number: EPA-HQ-OAR-2023-0115; NSPS for Nitric Acid
Plants (40 CFR part 60, subparts G and Ga) (Renewal); EPA ICR Number
1056.14; OMB Control Number 2060-0019; Expiration date January 31,
2024.
Respondents: Nitric acid production units producing weak (30 to 70
percent) nitric acid.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subparts G and Ga).
Estimated number of respondents: 32.
Frequency of response: Initially, semiannually.
Estimated annual burden: 2,534 hours.
Estimated annual cost: $3,040,000, includes $2,750,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(3) Docket ID Number: EPA-HQ-OAR-2003-0152; Compliance Assurance
Monitoring Program (40 CFR part 64) (Renewal); EPA ICR Number 1663.11;
OMB Control Number 2060-0376; Expiration date January 31, 2024.
Respondents: Title V sources with controlled pollutant-specific
emissions units.
Respondent's obligation to respond: Mandatory (40 CFR part 64).
Estimated number of respondents: 21,565.
Frequency of response: Initially, semiannually, annually.
Estimated annual burden: 24,590 hours.
Estimated annual cost: $999,211, includes no annualized capital or
O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(4) Docket ID Number: EPA-HQ-OAR-2023-0137; NSPS for Sewage Sludge
Incineration Units (40 CFR part 60, subpart LLLL) (Renewal); EPA ICR
Number 2639.06; OMB Control Number 2060-0658; Expiration date January
31, 2024.
Respondents: Sewage sludge incineration unit facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart LLLL).
Estimated number of respondents: 8.
Frequency of response: Initially, annually, semiannually.
Estimated annual burden: 1,560 hours.
Estimated annual cost: $1,130,000, includes $1,050,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(5) Docket ID Number: EPA-HQ-OAR-2023-0116; NSPS for Automobile and
Light Duty Truck Surface Coating Operations (40 CFR part 60, subpart
MM) (Renewal); EPA ICR Number 1064.21; OMB Control Number 2060-0034;
Expiration date February 29, 2024.
Respondents: Automobile and light duty truck surface coating
operations.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart MM).
Estimated number of respondents: 72.
Frequency of response: Initially, semiannually, quarterly.
Estimated annual burden: 214,000 hours.
Estimated annual cost: $24,400,000, includes $128,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected decrease in burden due
to a decrease in the number of sources subject to the regulation.
(6) Docket ID Number: EPA-HQ-OAR-2003-0120; National Volatile
Organic Compound Emission Standards for Automobile Refinish Coatings
(Renewal); EPA ICR Number 1765.10; OMB Control Number 2060-0353;
Expiration date February 29, 2024.
Respondents: Manufacturers and importers of automobile refinish
coatings and coating components.
Respondent's obligation to respond: Mandatory (40 CFR part 59,
subpart B).
Estimated number of respondents: 30.
Frequency of response: Initially.
Estimated annual burden: 14 hours.
Estimated annual cost: $980, includes no annualized capital or O&M
costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(7) Docket ID Number: EPA-HQ-OAR-2023-0110; NSPS for Metal Coil
Surface Coating (40 CFR part 60, subpart TT) (Renewal); EPA ICR Number
0660.14; OMB Control Number 2060-0107; Expiration date March 31, 2024.
Respondents: Metal coil surface coating facilities.
[[Page 31750]]
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart TT).
Estimated number of respondents: 158.
Frequency of response: Initially, quarterly, semiannually
Estimated annual burden: 16,200 hours.
Estimated annual cost: $1,950,000, includes $170,000 annualized
capital or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(8) Docket ID Number: EPA-HQ-OAR-2023-0111; NSPS for Asphalt
Processing and Roofing Manufacturing (40 CFR part 60, subpart UU)
(Renewal); EPA ICR Number 0661.14; OMB Control Number 2060-0002;
Expiration date April 30, 2024.
Respondents: Asphalt processing and roofing manufacturing
facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart UU).
Estimated number of respondents: 144.
Frequency of response: Initially, semiannually.
Estimated annual burden: 34,100 hours.
Estimated annual cost: $9,240,000, includes $5,240,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected decrease in burden due
to a decrease in the number of sources subject to the regulation.
(9) Docket ID Number: EPA-HQ-OAR-2023-0118; NSPS for Onshore
Natural Gas Processing Plants (40 CFR part 60, subparts KKK and LLL)
(Renewal); EPA ICR Number 1086.13; OMB Control Number 2060-0120;
Expiration date April 30, 2024.
Respondents: Onshore natural gas processing plants.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subparts KKK and LLL).
Estimated number of respondents: 362.
Frequency of response: Semiannually.
Estimated annual burden: 67,530 hours.
Estimated annual cost: $7,990,000, includes $68,400 annualized
capital or O&M costs.
Changes in estimates: There is a projected decrease in burden due
to a decrease in the number of sources subject to the regulation.
(10) Docket ID Number: EPA-HQ-OAR-2023-0129; The Consolidated Air
Rule (CAR) for the Synthetic Organic Chemical Manufacturing Industry
(SOCMI) (Renewal); EPA ICR Number 1854.14; OMB Control Number 2060-
0443; Expiration date April 30, 2024.
Respondents: Synthetic organic chemical manufacturing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subparts Ka, Kb, VV, VVa, DDD, III, NNN, and RRR; 40 CFR part 61,
subparts V, Y, and BB; and 40 CFR part 63, subparts F, G, H, and I).
Estimated number of respondents: 1,356.
Frequency of response: Initially, quarterly, semiannually,
annually.
Estimated annual burden: 1,100,000 hours.
Estimated annual cost: $128,000,000, includes $64,000,000
annualized capital or O&M costs.
Changes in estimates: There is a projected decrease in burden due
to a decrease in the number of sources subject to the regulation.
(11) Docket ID Number: EPA-HQ-OAR-2023-0130; NESHAP for Cellulose
Products Manufacturing (40 CFR part 63, subpart UUUU) (Renewal); EPA
ICR Number 1974.12; OMB Control Number 2060-0488; Expiration date June
30, 2024.
Respondents: Cellulose products manufacturing plants.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart UUUU).
Estimated number of respondents: 8.
Frequency of response: Initially, semiannually.
Estimated annual burden: 7,256 hours.
Estimated annual cost: $954,624, includes $120,135 annualized
capital or O&M costs.
Changes in estimates: There is a projected decrease in burden due
to anticipated shutdown of existing sources.
(12) Docket ID Number: EPA-HQ-OAR-2023-0109; NESHAP for Beryllium
(40 CFR part 61, subpart C) (Renewal); EPA ICR Number 0193.14; OMB
Control Number 2060-0092; Expiration date November 30, 2024.
Respondents: Facilities processing beryllium and its derivatives.
Respondent's obligation to respond: Mandatory (40 CFR part 61,
subpart C).
Estimated number of respondents: 33.
Frequency of response: Initially, monthly.
Estimated annual burden: 2,670 hours.
Estimated annual cost: $344,000, includes $35,000 annualized
capital or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(13) Docket ID Number: EPA-HQ-OAR-2023-0124; NESHAP for Aerospace
Manufacturing and Rework Facilities (40 CFR part 63, subpart GG)
(Renewal); EPA ICR Number 1687.13; OMB Control Number 2060-0314;
Expiration date November 30, 2024.
Respondents: Aerospace manufacturing and rework facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart GG).
Estimated number of respondents: 144.
Frequency of response: Initially, semiannually, annually.
Estimated annual burden: 154,130 hours.
Estimated annual cost: $15,500,000, includes $144,000 annualized
capital or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(14) Docket ID Number: EPA-HQ-OAR-2023-0134; NESHAP for Gold Mine
Ore Processing (40 CFR part 63, subpart EEEEEEE) (Renewal); EPA ICR
Number 2383.06; OMB Control Number 2060-0659; Expiration date November
30, 2024.
Respondents: Gold mine ore processing and production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart EEEEEEE).
Estimated number of respondents: 21.
Frequency of response: Initially, semiannually, annually.
Estimated annual burden: 2,840 hours.
Estimated annual cost: $556,000, includes $227,000 annualized
capital or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(15) Docket ID Number: EPA-HQ-OAR-2023-0114; NSPS for Electric
Utility Steam Generating Units (40 CFR part 60, subpart Da) (Renewal);
EPA ICR Number 1053.14; OMB Control Number 2060-0023; Expiration date
December 31, 2024.
Respondents: Electric utility steam generating units.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart Da).
Estimated number of respondents: 732.
Frequency of response: Initially, semiannually, quarterly.
Estimated annual burden: 171,000 hours.
Estimated annual cost: $31,000,000, includes $11,000,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected decrease in burden due
to a decrease in the number of sources subject to the regulation.
(16) Docket ID Number: EPA-HQ-OAR-2020-0627; NSPS for Petroleum
[[Page 31751]]
Refineries (40 CFR part 60, subpart J) (Renewal); EPA ICR Number
1054.15; OMB Control Number 2060-0022; Expiration date December 31,
2024.
Respondents: Petroleum refineries.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart J).
Estimated number of respondents: 130.
Frequency of response: Semiannually.
Estimated annual burden: 13,800 hours.
Estimated annual cost: $2,450,000, includes $809,000 annualized
capital or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(17) Docket ID Number: EPA-HQ-OAR-2023-0113; NSPS for Portland
Cement Plants (40 CFR part 60, subpart F) (Renewal); EPA ICR Number
1051.16; OMB Control Number 2060-0025; Expiration date December 31,
2024.
Respondents: Portland cement facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart F).
Estimated number of respondents: 92.
Frequency of response: Initially, semiannually.
Estimated annual burden: 14,100 hours.
Estimated annual cost: $2,390,000, includes $744,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected decrease in burden due
to anticipated shutdown of existing sources.
(18) Docket ID Number: EPA-HQ-OAR-2020-0628; NSPS for Sulfuric Acid
Plants (40 CFR part 60, subpart H) (Renewal); EPA ICR Number 2060-0041;
OMB Control Number 1057.16; Expiration date December 31, 2024.
Respondents: Sulfuric acid manufacturing plants.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart H).
Estimated number of respondents: 53.
Frequency of response: Initially, semiannually.
Estimated annual burden: 13,500 hours.
Estimated annual cost: $1,900,000, includes $309,000 annualized
capital or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(19) Docket ID Number: EPA-HQ-OAR-2023-0120; NSPS for Glass
Manufacturing Plants (40 CFR part, 60 subpart CC) (Renewal); EPA ICR
Number 1131.14; OMB Control Number 2060-0054; Expiration date December
31, 2024.
Respondents: Glass manufacturing plants.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart CC).
Estimated number of respondents: 41.
Frequency of response: Initially, semiannually.
Estimated annual burden: 850 hours.
Estimated annual cost: $338,000, includes $238,000 annualized
capital or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(20) Docket ID Number: EPA-HQ-OAR-2020-0633; NSPS for Polymeric
Coating of Supporting Substrates Facilities (40 CFR part 60, subpart
VVV) (Renewal); EPA ICR Number 1284.13; OMB Control Number 2060-0181;
Expiration date December 31, 2024.
Respondents: Facilities engaged in polymeric coating of supporting
substrates.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart VVV).
Estimated number of respondents: 74.
Frequency of response: Initially, quarterly, semiannually.
Estimated annual burden: 16,400 hours.
Estimated annual cost: $2,770,000, includes $826,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(21) Docket ID Number: EPA-HQ-OAR-2023-0121; NSPS for Small
Industrial-Commercial-Institutional Steam Generating Units (40 CFR part
60, subpart Dc) (Renewal); EPA ICR Number 1564.12; OMB Control Number
2060-0202; Expiration date December 31, 2024.
Respondents: Small industrial-commercial-institutional steam
generating units.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart Dc).
Estimated number of respondents: 323.
Frequency of response: Initially, semiannually.
Estimated annual burden: 219,000 hours.
Estimated annual cost: $38,300,000, includes $12,600,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(22) Docket ID Number: EPA-HQ-OAR-2023-0112; NSPS for Calciners and
Dryers in Mineral Industries (40 CFR part 60, subpart UUU) (Renewal);
EPA ICR Number 0746.12; OMB Control Number 2060-0251; Expiration date
December 31, 2024.
Respondents: Mineral processing plants with calciners and dryers.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart UUU).
Estimated number of respondents: 167.
Frequency of response: Initially, semiannually.
Estimated annual burden: 6,630 hours.
Estimated annual cost: $887,000, includes $109,000 annualized
capital or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(23) Docket ID Number: EPA-HQ-OAR-2011-0371; National Volatile
Organic Compound Emission Standards for Architectural Coatings
(Renewal); EPA ICR Number 1750.10; OMB Control Number 2060-0393;
Expiration date December 31, 2024.
Respondents: Manufacturers and importers of architectural coatings.
Respondent's obligation to respond: Mandatory (40 CFR part 59,
subpart D).
Estimated number of respondents: 500.
Frequency of response: Initially, annually.
Estimated annual burden: 14,661 hours.
Estimated annual cost: $1,484,441, includes no annualized capital
or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(24) Docket ID Number: EPA-HQ-OAR-2023-0135; NESHAP for Brick and
Structural Clay Products Manufacturing (40 CFR part 63, subpart JJJJJ)
(Renewal); EPA ICR Number 2509.03; OMB Control Number 2030-0047;
Expiration date February 28, 2025.
Respondents: Brick and/or structural clay products manufacturing
facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart JJJJJ).
Estimated number of respondents: 69.
Frequency of response: Initially, semiannually.
Estimated annual burden: 20,963 hours.
Estimated annual cost: $1,113,105 includes $682 annualized capital
or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(25) Docket ID Number: EPA-HQ-OAR-2023-0136; NESHAP for Clay
Ceramics Manufacturing (40 CFR part 63, subpart KKKKK) (Renewal); EPA
ICR Number 2510.03; OMB Control Number 2030-0048; Expiration date
February 28, 2025.
[[Page 31752]]
Respondents: Clay ceramics manufacturing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart MM).
Estimated number of respondents: 3.
Frequency of response: Semiannually.
Estimated annual burden: 2,323 hours.
Estimated annual cost: $221,905, includes $99,119 annualized
capital or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(26) Docket ID Number: EPA-HQ-OAR-2020-0629; NSPS for Primary and
Secondary Emissions from Basic Oxygen Furnaces (40 CFR part 60,
subparts N and Na) (Renewal); EPA ICR Number 1069.14; OMB Control
Number 2060-0029; Expiration date February 28, 2025.
Respondents: Iron and steel plants that utilize basic oxygen
furnaces.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subparts N and Na).
Estimated number of respondents: 13.
Frequency of response: Semiannually.
Estimated annual burden: 4,560 hours.
Estimated annual cost: $562,000, includes $21,600 annualized
capital or O&M costs.
Changes in estimates: There is a projected decrease in burden due
to anticipated shutdown of existing sources.
(27) Docket ID Number: EPA-HQ-OAR-2020-0630; NESHAP for Inorganic
Arsenic Emissions from Glass Manufacturing Plants (40 CFR part 61,
subpart N) (Renewal); EPA ICR Number 1081.14; OMB Control Number 2060-
0043; Expiration date February 28, 2025.
Respondents: Glass manufacturing plants.
Respondent's obligation to respond: Mandatory (40 CFR part 61,
subpart N).
Estimated number of respondents: 16.
Frequency of response: Initially, semiannually.
Estimated annual burden: 3,100 hours.
Estimated annual cost: $423,000, includes $56,000 annualized
capital or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(28) Docket ID Number: EPA-HQ-OAR-2020-0632; NSPS for Lime
Manufacturing (40 CFR part 60, subpart HH) (Renewal); EPA ICR Number
1167.14; OMB Control Number 2060-0063; Expiration date February 28,
2025.
Respondents: Lime production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart HH).
Estimated number of respondents: 41.
Frequency of response: Initially, semiannually.
Estimated annual burden: 3,820 hours.
Estimated annual cost: $514,000, includes $61,500 annualized
capital or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(29) Docket ID Number: EPA-HQ-OAR-2020-0625; NESHAP for Vinyl
Chloride (40 CFR part 61, subpart F) (Renewal); EPA ICR Number 0186.17;
OMB Control Number 2060-0071; Expiration date February 28, 2025.
Respondents: Ethylene dichloride, polyvinyl chloride, and vinyl
chloride facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 61,
subpart F).
Estimated number of respondents: 16.
Frequency of response: Initially, quarterly.
Estimated annual burden: 6,540 hours.
Estimated annual cost: $1,490,000, includes $720,000 annualized
capital or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(30) Docket ID Number: EPA-HQ-OAR-2020-0631; NSPS for Hot Mix
Asphalt Facilities (40 CFR part 60, subpart I) (Renewal); EPA ICR
Number 1127.14; OMB Control Number 2060-0083; Expiration date February
28, 2025.
Respondents: Hot mix asphalt facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart I).
Estimated number of respondents: 828.
Frequency of response: Initially.
Estimated annual burden: 4,120 hours.
Estimated annual cost: $488,000, includes no annualized capital or
O&M costs.
Changes in estimates: There is a projected decrease in burden due
to a decrease in the number of sources subject to the regulation.
(31) Docket ID Number: EPA-HQ-OAR-2023-0108; NSPS for Bulk Gasoline
Terminals (40 CFR part 60, subpart XX) (Renewal); EPA ICR Number
0664.14; OMB Control Number 2060-0006; Expiration date February 28,
2025.
Respondents: Bulk gasoline terminals.
Respondent's obligation to respond: Mandatory (40 CFR part 60,
subpart XX).
Estimated number of respondents: 214.
Frequency of response: Initially.
Estimated annual burden: 70,900 hours.
Estimated annual cost: $8,320,000, includes no annualized capital
or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(32) Docket ID Number: EPA-HQ-OAR-2020-0622; NESHAP for Wood
Furniture Manufacturing Operations (40 CFR part 63, subpart JJ)
(Renewal); EPA ICR Number 1716.12; OMB Control Number 2060-0324;
Expiration date February 28, 2025.
Respondents: Wood furniture manufacturing operations.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart JJ).
Estimated number of respondents: 230.
Frequency of response: Initially, quarterly, semiannually.
Estimated annual burden: 15,900 hours.
Estimated annual cost: $1,890,000, includes $12,900 annualized
capital or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(33) Docket ID Number: EPA-HQ-OAR-2023-0126; NESHAP for Primary
Aluminum Reduction Plants (40 CFR part 63, subpart LL) (Renewal); EPA
ICR Number 1767.10; OMB Control Number 2060-0360; Expiration date
February 28, 2025.
Respondents: Primary aluminum reduction facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart LL).
Estimated number of respondents: 8.
Frequency of response: Initially, quarterly, semiannually,
annually.
Estimated annual burden: 52,300 hours.
Estimated annual cost: $6,440,000, includes $310,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected decrease in burden due
to the anticipated shutdown of existing sources.
(34) Docket ID Number: EPA-HQ-OAR-2020-0624; NESHAP for Chemical
Recovery Combustion Sources at Kraft, Soda, Sulfite, and Stand-Alone
Semichemical Pulp Mills (40 CFR part 63, subpart MM) (Renewal); EPA ICR
Number 1805.12; OMB Control Number 2060-0377; Expiration date February
28, 2025.
Respondents: Chemical recovery combustion sources at kraft, soda,
sulfite, and stand-alone semichemical pulp mills.
[[Page 31753]]
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart MM).
Estimated number of respondents: 104.
Frequency of response: Initially, semiannually.
Estimated annual burden: 116,982 hours.
Estimated annual cost: $14,700,000, includes $788,000 annualized
capital or O&M costs.
Changes in estimates: There is a projected decrease in burden due
to a decrease in the number of sources subject to the regulation.
(35) Docket ID Number: EPA-HQ-OAR-2020-0636; NESHAP for Primary
Lead Processing (40 CFR part 63, subpart TTT) (Renewal); EPA ICR Number
1856.13; OMB Control Number 2060-0414; Expiration date February 28,
2025.
Respondents: Facilities engaged in the smelting of lead from ores.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart TTT).
Estimated number of respondents: 1.
Frequency of response: Quarterly, semiannually.
Estimated annual burden: 6,270 hours.
Estimated annual cost: $912,000, includes $169,000 annualized
capital or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(36) Docket ID Number: EPA-HQ-OAR-2020-0623; NESHAP for Natural Gas
Transmission and Storage (40 CFR part 63, subpart HHH) (Renewal); EPA
ICR Number 1789.12; OMB Control Number 2060-0418; Expiration date
February 28, 2025.
Respondents: Natural gas transmission and storage facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart HHH).
Estimated number of respondents: 73.
Frequency of response: Initially, semiannually.
Estimated annual burden: 3,780 hours.
Estimated annual cost: $448,000, includes no annualized capital or
O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(37) Docket ID Number: EPA-HQ-OAR-2020-0638; NESHAP for Leather
Finishing Operations (40 CFR, part 63, subpart TTTT) (Renewal); EPA ICR
Number 1985.11; OMB Control Number 2060-0478; Expiration date February
28, 2025.
Respondents: Leather finishing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 61,
subpart TTTT).
Estimated number of respondents: 4.
Frequency of response: Initially, annually.
Estimated annual burden: 138 hours.
Estimated annual cost: $16,300, includes no annualized capital or
O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(38) Docket ID Number: EPA-HQ-OAR-2023-0122; NESHAP for Marine Tank
Vessel Loading Operations (40 CFR part 63, subpart Y) (Renewal); EPA
ICR Number 1679.12; OMB Control Number 2060-0289; Expiration date
February 28, 2025.
Respondents: Marine tank vessel loading facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart Y).
Estimated number of respondents: 804.
Frequency of response: Initially, semiannually, annually.
Estimated annual burden: 10,700 hours.
Estimated annual cost: $1,260,000, includes no annualized capital
or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(39) Docket ID Number: EPA-HQ-OAR-2023-0123; NESHAP for Epoxy Resin
and Non-Nylon Polyamide Production (40 CFR part 63, subpart W)
(Renewal); EPA ICR Number 1681.11; OMB Control Number 2060-0290;
Expiration date February 28, 2025.
Respondents: Epoxy resin and non-nylon polyamide resin production
facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart W).
Estimated number of respondents: 7.
Frequency of response: Initially, quarterly, semiannually.
Estimated annual burden: 3,940 hours.
Estimated annual cost: $476,000, includes $14,000 annualized
capital or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(40) Docket ID Number: EPA-HQ-OAR-2023-0125; NESHAP for
Shipbuilding and Ship Repair Facilities--Surface Coating (40 CFR part
63, subpart II) (Renewal); EPA ICR Number 1712.12; OMB Control Number
2060-0330; Expiration date February 28, 2025.
Respondents: Shipbuilding and ship repair surface coating
facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart II).
Estimated number of respondents: 56.
Frequency of response: Semiannually.
Estimated annual burden: 25,600 hours.
Estimated annual cost: $3,000,000, includes no annualized capital
or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(41) Docket ID Number: EPA-HQ-OAR-2020-0634; NESHAP for the
Secondary Lead Smelter Industry (40 CFR part 63, subpart X) (Renewal);
EPA ICR Number 1686.13; OMB Control Number 2060-0296; Expiration date
February 28, 2025.
Respondents: Secondary lead smelter facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart X).
Estimated number of respondents: 12.
Frequency of response: Semiannually, annually.
Estimated annual burden: 21,700 hours.
Estimated annual cost: $2,830,000, includes $251,000 annualized
capital or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(42) Docket ID Number: EPA-HQ-OAR-2023-0127; NESHAP for
Pharmaceutical Production (40 CFR part 63, subpart GGG) (Renewal); EPA
ICR Number 1781.10; OMB Control Number 2060-0358; Expiration date
February 28, 2025.
Respondents: Pharmaceutical production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart GGG).
Estimated number of respondents: 27.
Frequency of response: Initially, semiannually.
Estimated annual burden: 44,300 hours.
Estimated annual cost: $5,300,000, includes $112,000 annualized
capital or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(43) Docket ID Number: EPA-HQ-OAR-2023-0119; NESHAP for Beryllium
Rocket Motor Fuel Firing (40 CFR part 61, subpart D) (Renewal); EPA ICR
Number 1125.10; OMB Control Number 2060-0394; Expiration date February
28, 2025.
Respondents: Beryllium rocket motor fuel firing test sites.
Respondent's obligation to respond: Mandatory (40 CFR part 61,
subpart D).
[[Page 31754]]
Estimated number of respondents: 1.
Frequency of response: Initially, monthly.
Estimated annual burden: 9 hours.
Estimated annual cost: $1,110, includes no annualized capital or
O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(44) Docket ID Number: EPA-HQ-OAR-2023-0128; NESHAP for Polyether
Polyols Production (40 CFR part 63, subpart PPP) (Renewal); EPA ICR
Number 1811.12; OMB Control Number 2060-0415; Expiration date February
28, 2025.
Respondents: Polyether polyols production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart PPP).
Estimated number of respondents: 23.
Frequency of response: Semiannually.
Estimated annual burden: 3,710 hours.
Estimated annual cost: $429,000, includes no annualized capital or
O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(45) Docket ID Number: EPA-HQ-OAR-2023-0133; NESHAP for Site
Remediation (40 CFR part 63, subpart GGGGG) (Renewal); EPA ICR Number
2062.10; OMB Control Number 2060-0534; Expiration date February 28,
2025.
Respondents: Facilities that conduct site remediation activities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart GGGGG).
Estimated number of respondents: 30.
Frequency of response: Initially, semiannually.
Estimated annual burden: 19,724 hours.
Estimated annual cost: $1,547,910, includes $287,910 annualized
capital or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(46) Docket ID Number: EPA-HQ-OAR-2020-0635; NESHAP for Primary
Copper Smelters (40 CFR part 63, subpart QQQ) (Renewal); EPA ICR Number
1850.10; OMB Control Number 2060-0476; Expiration date February 28,
2025.
Respondents: Primary copper smelters.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart QQQ).
Estimated number of respondents: 2.
Frequency of response: Initially, semiannually, annually.
Estimated annual burden: 6,380 hours.
Estimated annual cost: $761,000, includes $5,480 annualized capital
or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(47) Docket ID Number: EPA-HQ-OAR-2023-0117; NESHAP for Benzene
Emissions from Benzene Storage Vessels and Coke Oven By-Product
Recovery Plants (40 CFR part 61, subparts L and Y) (Renewal); EPA ICR
Number 1080.17; OMB Control Number 2060-0185; Expiration date February
28, 2025.
Respondents: Benzene storage vessels and coke oven by-product
recovery plants.
Respondent's obligation to respond: Mandatory (40 CFR part 61,
subparts L and Y).
Estimated number of respondents: 13.
Frequency of response: Annually, semiannually.
Estimated annual burden: 1,730 hours.
Estimated annual cost: $201,000, includes no annualized capital or
O&M costs.
Changes in estimates: There is a projected decrease in burden due
to a decrease in the number of sources subject to the regulation.
(48) Docket ID Number: EPA-HQ-OAR-2023-0131; NESHAP for Rubber Tire
Manufacturing (40 CFR part 63, subpart XXXX) (Renewal); EPA ICR Number
1982.05; OMB Control Number 2060-0449; Expiration date February 28,
2025.
Respondents: Rubber tire manufacturing facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart XXXX).
Estimated number of respondents: 21.
Frequency of response: Initially, semiannually, annually.
Estimated annual burden: 5,870 hours.
Estimated annual cost: $819,000, includes no annualized capital or
O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(49) Docket ID Number: EPA-HQ-OAR-2017-0685; NESHAP for Metal Coil
Surface Coating Plants (40 CFR part 63, subpart SSSS) (Renewal); EPA
ICR Number 1957.11; OMB Control Number 2060-0487; Expiration date
February 28, 2025.
Respondents: Metal coil surface coating sources.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart SSSS).
Estimated number of respondents: 48.
Frequency of response: Initially, semiannually.
Estimated annual burden: 16,838 hours.
Estimated annual cost: $2,091,000, includes $243,600 annualized
capital or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
(50) Docket ID Number: EPA-HQ-OAR-2017-0357; NESHAP for Carbon
Black, Ethylene, Cyanide, and Spandex (40 CFR part 63, subpart YY)
(Renewal); EPA ICR Number 1983.11; OMB Control Number 2060-0489;
Expiration date February 25, 2025.
Respondents: Carbon black, ethylene, cyanide, and spandex
production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart YY).
Estimated number of respondents: 61.
Frequency of response: Initially, semiannually.
Estimated annual burden: 50,300 hours.
Estimated annual cost: $ 9,340,000, includes $4,015,500 annualized
capital or O&M costs.
Changes in estimates: There is a projected increase in burden due
to an increase in the number of sources subject to the regulation.
(51) Docket ID Number: EPA-HQ-OAR-2023-0132; NESHAP for
Hydrochloric Acid Production (40 CFR part 63, subpart NNNNN) (Renewal);
EPA ICR Number 2032.12; OMB Control Number 2060-0529; Expiration date
February 28, 2025.
Respondents: Hydrochloric acid production facilities.
Respondent's obligation to respond: Mandatory (40 CFR part 63,
subpart NNNNN).
Estimated number of respondents: 19.
Frequency of response: Initially, semiannually.
Estimated annual burden: 22,000 hours.
Estimated annual cost: $1,562,000, includes $162,000 annualized
capital or O&M costs.
Changes in estimates: There is no projected change in burden from
the previous ICR.
Penny Lassiter,
Director, Sector Policies and Programs Division.
[FR Doc. 2023-10566 Filed 5-17-23; 8:45 am]