Notice2023-10382
Tivis Branch Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
May 16, 2023
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 88 Issue 94 (Tuesday, May 16, 2023)</title>
</head>
<body><pre>
[Federal Register Volume 88, Number 94 (Tuesday, May 16, 2023)]
[Notices]
[Pages 31262-31263]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2023-10382]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15296-000]
Tivis Branch Hydro, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On January 3, 2023, Tivis Branch Hydro, LLC, filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act (FPA), proposing to study the feasibility of the Flannagan
Hydroelectric Project to be located at the U.S. Army Corps of
Engineers' (Corps) Huntington District John W. Flannagan Dam on the
Pound River in Dickenson County, Virginia. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed project would consist of the following: (1) new four
0.36-megawatt (MW) turbine-generator units to be placed inside the
Corps' intake tower with a total installed capacity of 1.44 MW; (2) a
new 40-foot-long, 40-foot-wide operating space inside the Corps' intake
tower; (3) a new 300-foot-long conduit attached to the access bridge
(which provides access to the Corps' intake tower); (4) a new 15-foot-
long, 15-foot-wide substation pad including a 4.16/12.47-kilovolt (kV)
step-up transformer; (5) a new 300-foot-long, 4.16-kV generator lead to
the
[[Page 31263]]
substation pad; (6) a 30-foot-long, 12.47-kV transmission line
connecting the substation pad to the existing 12.47-kV Appalachian
Power Company's distribution line; and (7) appurtenant facilities. The
proposed project would have an annual generation of 8,000 megawatt-
hours.
Applicant Contact: Ryan A. Cook, Tivis Branch Hydro, LLC, 5 Dover
Street, Suite 102, New Bedford, MA 02740; phone: (508) 436-4100.
FERC Contact: Woohee Choi; email: <a href="/cdn-cgi/l/email-protection#e1968e8e898484cf82898e88a187849382cf868e97"><span class="__cf_email__" data-cfemail="7a0d1515121f1f54191215133a1c1f0819541d150c">[email protected]</span></a>; phone:
(202) 502-6336.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/eFiling.aspx">https://ferconline.ferc.gov/eFiling.aspx</a>. Commenters can submit brief comments
up to 6,000 characters, without prior registration, using the eComment
system at <a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. You must
include your name and contact information at the end of your comments.
For assistance, please contact FERC Online Support. In lieu of
electronic filing, you may submit a paper copy. Submissions sent via
the U.S. Postal Service must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Room 1A, Washington, DC 20426. Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852.
The first page of any filing should include docket number P-15296-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's website at <a href="http://www.ferc.gov/docs-filing/elibrary.asp">http://www.ferc.gov/docs-filing/elibrary.asp</a>.
Enter the docket number (P-15296) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: May 10, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-10382 Filed 5-15-23; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on May 16, 2023.