Rule2023-08483
Energy Conservation Program: Test Procedure for Commercial and Industrial Pumps; Correction
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
April 21, 2023
Effective
April 24, 2023
Issuing agencies
Energy Department
Abstract
The U.S. Department of Energy ("DOE") is correcting a final rule that appeared in the Federal Register on March 24, 2023. That document amended test procedures for commercial and industrial pumps. This document corrects a numbering and amendatory error in that final rule.
Full Text
<html>
<head>
<title>Federal Register, Volume 88 Issue 77 (Friday, April 21, 2023)</title>
</head>
<body><pre>
[Federal Register Volume 88, Number 77 (Friday, April 21, 2023)]
[Rules and Regulations]
[Page 24471]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2023-08483]
========================================================================
Rules and Regulations
Federal Register
________________________________________________________________________
This section of the FEDERAL REGISTER contains regulatory documents
having general applicability and legal effect, most of which are keyed
to and codified in the Code of Federal Regulations, which is published
under 50 titles pursuant to 44 U.S.C. 1510.
The Code of Federal Regulations is sold by the Superintendent of Documents.
========================================================================
Federal Register / Vol. 88, No. 77 / Friday, April 21, 2023 / Rules
and Regulations
[[Page 24471]]
DEPARTMENT OF ENERGY
10 CFR Parts 429 and 431
[EERE-2020-BT-TP-0032]
RIN 1904-AE53
Energy Conservation Program: Test Procedure for Commercial and
Industrial Pumps; Correction
AGENCY: Office of Energy Efficiency and Renewable Energy, Department of
Energy.
ACTION: Final rule; correction.
-----------------------------------------------------------------------
SUMMARY: The U.S. Department of Energy (``DOE'') is correcting a final
rule that appeared in the Federal Register on March 24, 2023. That
document amended test procedures for commercial and industrial pumps.
This document corrects a numbering and amendatory error in that final
rule.
DATES: Effective April 24, 2023.
FOR FURTHER INFORMATION CONTACT:
Mr. Jeremy Dommu, U.S. Department of Energy, Office of Energy
Efficiency and Renewable Energy, Building Technologies Office, EE-2J,
1000 Independence Avenue SW, Washington, DC 20585-0121. Telephone:
(202) 586-9870. Email: <a href="/cdn-cgi/l/email-protection#3b7a4b4b57525a55585e684f5a555f5a495f486a4e5e484f525455487b5e5e155f545e155c544d"><span class="__cf_email__" data-cfemail="69281919050008070a0c3a1d08070d081b0d1a381c0c1a1d0006071a290c0c470d060c470e061f">[email protected]</span></a>.
Mr. Nolan Brickwood, U.S. Department of Energy, Office of the
General Counsel, GC-33, 1000 Independence Avenue SW, Washington, DC
20585-0121. Telephone: (202) 586-9870. Email:
<a href="/cdn-cgi/l/email-protection#96d8f9faf7f8b8d4e4fff5fde1f9f9f2d6fee7b8f2f9f3b8f1f9e0"><span class="__cf_email__" data-cfemail="6a2405060b044428180309011d05050e2a021b440e050f440d051c">[email protected]</span></a>.
SUPPLEMENTARY INFORMATION:
I. Background
DOE published a final rule in the Federal Register on March 24,
2023 (March 2023 final rule), amending the test procedure for
commercial and industrial pumps. 88 FR 17934. This correction addresses
numbering errors in that final rule.
The amendatory instructions in the March 2023 final rule amended
Sec. 431.463 by revising the materials incorporated by reference. The
final rule erroneously used duplicative numbering in this section by
adding two paragraphs numbered as (g)(3). Further, the amendatory
instructions for appendix A to subpart Y of part 431 omitted adding new
paragraph E.1.2.1.2.3 to Section III and the amendatory instructions
for Sec. 429.59 omitted adding paragraph (a)(2)(iv).
II. Need for Correction
As published, the regulatory text in the March 2023 final rule may
result in confusion due to incorrect section references and missing
amendatory instructions. Because this final rule would simply correct
errors in the text without making substantive changes in the March 2023
final rule, the changes addressed in this document are technical in
nature.
III. Procedural Issues and Regulatory Review
DOE has concluded that the determinations made pursuant to the
various procedural requirements applicable to the March 2023 final rule
remain unchanged for this final rule technical correction. These
determinations are set forth in the March 2023 final rule. 88 FR 17968-
17972.
Pursuant to the Administrative Procedure Act, 5 U.S.C. 553(b), DOE
determines that notice and prior opportunity for comment on this rule
are unnecessary and contrary to the public interest. Neither the errors
nor the corrections in this document affect the substance of the March
2023 final rule or any of the conclusions reached in support of the
final rule. For these reasons, DOE also determines that there is good
cause to waive the 30-day delay in effective date in 5 U.S.C. 553(d).
Signing Authority
This document of the Department of Energy was signed on April 18,
2023, by Francisco Alejandro Moreno, Acting Assistant Secretary for
Energy Efficiency and Renewable Energy, pursuant to delegated authority
from the Secretary of Energy. That document with the original signature
and date is maintained by DOE. For administrative purposes only, and in
compliance with requirements of the Office of the Federal Register, the
undersigned DOE Federal Register Liaison Officer has been authorized to
sign and submit the document in electronic format for publication, as
an official document of the Department of Energy. This administrative
process in no way alters the legal effect of this document upon
publication in the Federal Register.
Correction
In FR Doc. 2023-05635, appearing on page 17934 in the Federal
Register of Wednesday, March 24, 2023, the following corrections are
made:
Sec. 429.59 [Corrected]
0
1. On page 17973, in the first column, revise amendatory instruction
2.c to read ``Adding new paragraphs (a)(2)(iv) and (a)(3).;''
Sec. 431.463 [Corrected]
0
2. On page 17978, in the first column, redesignate the second instance
of paragraph (g)(3) as (g)(4).
Sec. 431.464 [Corrected]
0
3. On page 17978, in the third column, revise amendatory instruction
8.d to read ``In section III, revising paragraphs A through D,
E.1.2.1.2, E.1.2.1.2.1., E.1.2.1.2.2, and E.1.2.1.2.3.;''
Signed in Washington, DC, on April 18, 2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S. Department of Energy.
[FR Doc. 2023-08483 Filed 4-20-23; 8:45 am]
BILLING CODE 6450-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on April 21, 2023.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.