On March 22, 2023, the Department of Energy's Grid Deployment Office published a notice announcing the availability of guidance and open application period for the Hydroelectric Production Incentives in the Federal Register. This document makes a correction to that notice.
Full Text
<html>
<head>
<title>Federal Register, Volume 88 Issue 68 (Monday, April 10, 2023)</title>
</head>
<body><pre>
[Federal Register Volume 88, Number 68 (Monday, April 10, 2023)]
[Notices]
[Page 21187]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2023-07455]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Notice of Availability of Guidance and Application for
Hydroelectric Production Incentives; Correction
AGENCY: Hydroelectric Incentives Program, Grid Deployment Office,
Department of Energy.
ACTION: Notice of availability of guidance and open application period;
correction.
-----------------------------------------------------------------------
SUMMARY: On March 22, 2023, the Department of Energy's Grid Deployment
Office published a notice announcing the availability of guidance and
open application period for the Hydroelectric Production Incentives in
the Federal Register. This document makes a correction to that notice.
FOR FURTHER INFORMATION CONTACT: Questions may be addressed to Madden
Sciubba, U.S. Department of Energy, 1000 Independence Ave. SW,
Washington, DC 20585, (240) 798-1195 or by email at
<a href="/cdn-cgi/l/email-protection#f49c8d90869b9198919780869d979d9a97919a809d829187b49c85da909b91da939b82"><span class="__cf_email__" data-cfemail="86eeffe2f4e9e3eae3e5f2f4efe5efe8e5e3e8f2eff0e3f5c6eef7a8e2e9e3a8e1e9f0">[email protected]</span></a>. Additional information can be found
in the guidance posted at <a href="http://www.energy.gov/gdo/section-242-hydroelectric-production-incentive-program">www.energy.gov/gdo/section-242-hydroelectric-production-incentive-program</a>. Electronic communications are recommended
for correspondence.
SUPPLEMENTARY INFORMATION:
Correction
On March 22, 2023, the Department of Energy's Grid Deployment
Office (GDO) published a notice announcing the availability of guidance
and open application period for the Section 242 Hydroelectric
Production Incentives in the Federal Register. 88 FR 17202. It has come
to GDO's attention that there is a typo included under the
SUPPLEMENTARY INFORMATION section in the first sentence on page 17203,
second column, first paragraph, relating to the date referenced as part
of the discussion of an existing dam or conduit included in the second
column.
The sentence is corrected to read as follows:
``Additionally, Congress defined an existing dam or conduit to
mean any dam or conduit constructed and completed before November
15, 2021 and does not require any construction or enlargement of
impoundment or diversion structures, other than repair or
reconstruction, in connection with the installation of a turbine or
other generating device.'' (Emphasis added).
This typo does not alter the information provided in the guidance
document nor does it alter the solicitation period as announced in the
original notice. Please consult the guidance for all application
requirements and properly submit all application materials to the Clean
Energy Infrastructure Funding Opportunity Exchange, <a href="https://infrastructure-exchange.energy.gov">https://infrastructure-exchange.energy.gov</a>, by no later than 5 p.m. ET, May 8,
2023.
Reason for Correction: The change corrects the date referenced in
the discussion of the definition of an existing dam or conduit.\1\
---------------------------------------------------------------------------
\1\ See 42 U.S.C. 15881(b)(2).
---------------------------------------------------------------------------
Signing Authority
This document of the Department of Energy was signed on April 4,
2023, by Maria Duaime Robinson, Director, Grid Deployment Office,
pursuant to delegated authority from the Secretary of Energy. That
document with the original signature and date is maintained by DOE. For
administrative purposes only, and in compliance with requirements of
the Office of the Federal Register, the undersigned DOE Federal
Register Liaison Officer has been authorized to sign and submit the
document in electronic format for publication, as an official document
of the Department of Energy. This administrative process in no way
alters the legal effect of this document upon publication in the
Federal Register.
Signed in Washington, DC, on April 5, 2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S. Department of Energy.
[FR Doc. 2023-07455 Filed 4-7-23; 8:45 am]
BILLING CODE 6450-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on April 10, 2023.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.