Rule2023-06753
Energy Conservation Program: Test Procedure for Television Sets; Correction
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
April 4, 2023
Effective
April 14, 2023
Issuing agencies
Energy Department
Abstract
The U.S. Department of Energy ("DOE") is correcting a final rule that appeared in the Federal Register on March 15, 2023. That document amended test procedures for television sets. This document corrects an amendatory error in that final rule.
Full Text
<html>
<head>
<title>Federal Register, Volume 88 Issue 64 (Tuesday, April 4, 2023)</title>
</head>
<body><pre>
[Federal Register Volume 88, Number 64 (Tuesday, April 4, 2023)]
[Rules and Regulations]
[Page 19801]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2023-06753]
========================================================================
Rules and Regulations
Federal Register
________________________________________________________________________
This section of the FEDERAL REGISTER contains regulatory documents
having general applicability and legal effect, most of which are keyed
to and codified in the Code of Federal Regulations, which is published
under 50 titles pursuant to 44 U.S.C. 1510.
The Code of Federal Regulations is sold by the Superintendent of Documents.
========================================================================
Federal Register / Vol. 88, No. 64 / Tuesday, April 4, 2023 / Rules
and Regulations
[[Page 19801]]
DEPARTMENT OF ENERGY
10 CFR Part 430
[EERE-2016-BT-TP-0023]
RIN 1904-AD70
Energy Conservation Program: Test Procedure for Television Sets;
Correction
AGENCY: Office of Energy Efficiency and Renewable Energy, Department of
Energy.
ACTION: Final rule; correction.
-----------------------------------------------------------------------
SUMMARY: The U.S. Department of Energy (``DOE'') is correcting a final
rule that appeared in the Federal Register on March 15, 2023. That
document amended test procedures for television sets. This document
corrects an amendatory error in that final rule.
DATES: Effective April 14, 2023.
FOR FURTHER INFORMATION CONTACT:
Mr. Jeremy Dommu, U.S. Department of Energy, Office of Energy
Efficiency and Renewable Energy, Building Technologies Office, EE-2J,
1000 Independence Avenue SW, Washington, DC 20585-0121. Telephone:
(202) 586-9870. Email: <a href="/cdn-cgi/l/email-protection#a7e6d7d7cbcec6c9c4c2f4d3c6c9c3c6d5c3d4f6d2c2d4d3cec8c9d4e7c2c289c3c8c289c0c8d1"><span class="__cf_email__" data-cfemail="024372726e6b636c61675176636c666370667153776771766b6d6c714267672c666d672c656d74">[email protected]</span></a>.
Ms. Celia Sher, U.S. Department of Energy, Office of the General
Counsel, GC-33, 1000 Independence Avenue SW, Washington, DC 20585-0121.
Telephone: (202) 287-6122. Email: <a href="/cdn-cgi/l/email-protection#1d7e7871747c336e75786f5d756c33797278337a726b"><span class="__cf_email__" data-cfemail="b8dbddd4d1d996cbd0ddcaf8d0c996dcd7dd96dfd7ce">[email protected]</span></a>.
SUPPLEMENTARY INFORMATION:
I. Background
DOE published a final rule in the Federal Register on March 15,
2023 (March 2023 Final Rule), amending the test procedure for
television sets. 88 FR 16082. This correction addresses numbering
errors in the amendatory language in that final rule.
The amendatory instructions in the March 2023 Final Rule amend
Sec. 430.3 by redesignating paragraphs (n) through (w) as paragraphs
(o) through (x), respectively. 88 FR 16082, 16109. However, paragraph
(p), which is being redesignated as (q) currently contains ``Note 1 to
paragraph (p)'' and refers to ``paragraphs (p)(1) through (9).'' The
amendatory instructions failed to revise this note to correctly refer
to paragraph (q). Further, there is already another Note 1 within Sec.
430.3 (see Sec. 430.3(e)), so the numbering of these notes in Sec.
430.3 was not properly sequenced, and the note in newly redesignated
Sec. 430.3(q) should have been numbered as Note 2.
II. Need for Correction
As published, the regulatory text in the March 2023 Final Rule may
result in confusion due to incorrect section references. Because this
final rule would simply correct errors in the text without making
substantive changes in the March 2023 Final Rule, the changes addressed
in this document are technical in nature.
III. Procedural Issues and Regulatory Review
DOE has concluded that the determinations made pursuant to the
various procedural requirements applicable to the March 2023 Final Rule
remain unchanged for this final rule technical correction. These
determinations are set forth in the March 2023 Final Rule. 88 FR 16082,
16106-16109.
Pursuant to the Administrative Procedure Act, 5 U.S.C. 553(b), DOE
determines that notice and prior opportunity for comment on this rule
are unnecessary and contrary to the public interest. Neither the errors
nor the corrections in this document affect the substance of the March
2023 Final Rule or any of the conclusions reached in support of the
final rule. For these reasons, DOE also determines that there is good
cause to waive the 30-day delay in effective date in 5 U.S.C. 553(d).
Correction
In FR Doc. 2023-03986, appearing on page 16109 in the Federal
Register of Wednesday, March 15, 2023, the following corrections are
made:
0
On page 16109, in the third column, correct amendatory instruction 4 by
adding instruction 4.e. and correcting the regulatory text to read as
follows:
4.e. In newly redesignated paragraph (q), removing Note 1 and
adding Note 2.
Sec. 430.3 [Corrected]
* * * * *
(q) * * *
Note 2 to paragraph (q). The standards referenced in paragraphs
(q)(1) through (9) are also available from ANSI. See paragraph (e) of
this section.
* * * * *
Signing Authority
This document of the Department of Energy was signed on March 28,
2023, by Francisco Alejandro Moreno, Acting Assistant Secretary for
Energy Efficiency and Renewable Energy, pursuant to delegated authority
from the Secretary of Energy. That document with the original signature
and date is maintained by DOE. For administrative purposes only, and in
compliance with requirements of the Office of the Federal Register, the
undersigned DOE Federal Register Liaison Officer has been authorized to
sign and submit the document in electronic format for publication, as
an official document of the Department of Energy. This administrative
process in no way alters the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC, on March 28, 2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S. Department of Energy.
[FR Doc. 2023-06753 Filed 4-3-23; 8:45 am]
BILLING CODE 6450-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on April 4, 2023.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.