Notice2023-05286
Bison Pipeline LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
March 15, 2023
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 88 Issue 50 (Wednesday, March 15, 2023)</title>
</head>
<body><pre>
[Federal Register Volume 88, Number 50 (Wednesday, March 15, 2023)]
[Notices]
[Pages 16000-16001]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2023-05286]
[[Page 16000]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP23-85-000]
Bison Pipeline LLC; Notice of Request Under Blanket Authorization
and Establishing Intervention and Protest Deadline
Take notice that on March 3, 2023, Bison Pipeline LLC (Bison), 700
Louisiana Street, Suite 1300, Houston, Texas 77002, filed in the above
referenced docket, a prior notice pursuant to Sections 157.205,
157.210, and 157.216(b)(2)(iii) of the Federal Energy Regulatory
Commission's regulations under the Natural Gas Act and the blanket
certificate issued by the Commission in Docket No. CP09-161-000,\1\
seeking authorization to modify the operation of its natural gas
pipeline mainline system to reduce the Maximum Allowable Operating
Pressure (MAOP) and to abandon the associated system design capacity
located in Campbell County, Wyoming and Morton County, North Dakota.
---------------------------------------------------------------------------
\1\ Bison Pipeline LLC., 131 FERC ] 61,013 (2010).
---------------------------------------------------------------------------
Specifically, Bison seeks authorization to reduce, from 1,440
pounds per square inch gauge (psig) to 1,296 psig, the MAOP of its
entire natural gas pipeline mainline system from the Buffalo Meter
Station, located in Campbell County, Wyoming, to the Kurtz Meter
Station, located in Morton County, North Dakota, in compliance with
U.S. Department of Transportation's Pipeline and Hazardous Materials
Safety Administration's regulations to ensure continued system
integrity and safe operations. Additionally, Bison requests
authorization to abandon approximately 30.5 million cubic feet per day
of associated system design capacity, all as more fully set forth in
the request which is on file with the Commission and open to public
inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (<a href="http://www.ferc.gov">www.ferc.gov</a>) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at <a href="/cdn-cgi/l/email-protection#6b2d2e392824050702050e381e1b1b04191f2b0d0e1908450c041d"><span class="__cf_email__" data-cfemail="aaeceff8e9e5c4c6c3c4cff9dfdadac5d8deeacccfd8c984cdc5dc">[email protected]</span></a> or call toll-free,
(886) 208-3676 or TTY, (202) 502-8659.
Any questions concerning this application should be directed to
David A. Alonzo, Manager, Project Authorizations, Bison Pipeline LLC,
700 Louisiana Street, Suite 1300, Houston, Texas 77002, by phone at
(832) 320-477; or by email to <a href="/cdn-cgi/l/email-protection#fc989d8a9598a39d9093928693bc889f9992998e9b85d29f9391"><span class="__cf_email__" data-cfemail="d8bcb9aeb1bc87b9b4b7b6a2b798acbbbdb6bdaabfa1f6bbb7b5">[email protected]</span></a>.
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on May 8, 2023. How
to file protests, motions to intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\2\ any person \3\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\2\ 18 CFR 157.205.
\3\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\4\ and must be submitted by
the protest deadline, which is May 8, 2023. A protest may also serve as
a motion to intervene so long as the protestor states it also seeks to
be an intervenor.
---------------------------------------------------------------------------
\4\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \5\ and the regulations under the NGA \6\ by the
intervention deadline for the project, which is May 8, 2023. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at <a href="https://www.ferc.gov/resources/guides/how-to/intervene.asp">https://www.ferc.gov/resources/guides/how-to/intervene.asp</a>.
---------------------------------------------------------------------------
\5\ 18 CFR 385.214.
\6\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before May 8, 2023. The filing of a comment alone will not serve
to make the filer a party to the proceeding. To become a party, you
must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP23-85-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the
[[Page 16001]]
Commission's eFiling feature, which is located on the Commission's
website (<a href="http://www.ferc.gov">www.ferc.gov</a>) under the link to Documents and Filings. New
eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select ``General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing.'' The Commission's eFiling
staff are available to assist you at (202) 502-8258 or
<a href="/cdn-cgi/l/email-protection" class="__cf_email__" data-cfemail="23654651406c4d4f4a4d46705653534c515763454651400d444c55">[email protected]</a>.
(2) You can file a paper copy of your submission. Your submission
must reference the Project docket number CP23-85-000.
To mail via USPS, use the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426.
To mail via any other courier, use the following address: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
Protests and motions to intervene must be served on the applicant
either by mail or email (with a link to the document) at: David A.
Alonzo, Manager, Project Authorizations, Bison Pipeline LLC, 700
Louisiana Street, Suite 1300, Houston, Texas 77002, by phone at (832)
320-477; or by email to <a href="/cdn-cgi/l/email-protection#7115100718152e101d1e1f0b1e310512141f140316085f121e1c"><span class="__cf_email__" data-cfemail="99fdf8eff0fdc6f8f5f6f7e3f6d9edfafcf7fcebfee0b7faf6f4">[email protected]</span></a>. Any subsequent
submissions by an intervenor must be served on the applicant and all
other parties to the proceeding. Contact information for parties can be
downloaded from the service list at the eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at <a href="http://www.ferc.gov">www.ferc.gov</a> using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
<a href="http://www.ferc.gov/docs-filing/esubscription.asp">www.ferc.gov/docs-filing/esubscription.asp</a>.
Dated: March 9, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-05286 Filed 3-14-23; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on March 15, 2023.