Air Plan Approval; Alabama; Update to Materials Incorporated by Reference
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
The Environmental Protection Agency (EPA) is updating the materials that are incorporated by reference (IBR) into the Alabama State Implementation Plan (SIP). The regulations affected by this update have been previously submitted by Alabama and approved by EPA. EPA is also notifying the public of corrections to the Code of Federal Regulations (CFR) tables that identify material incorporated by reference into the Alabama SIP. This update affects the materials that are available for public inspection at the National Archives and Records Administration (NARA) and the EPA Regional Office.
Full Text
<html>
<head>
<title>Federal Register, Volume 88 Issue 53 (Monday, March 20, 2023)</title>
</head>
<body><pre>
[Federal Register Volume 88, Number 53 (Monday, March 20, 2023)]
[Rules and Regulations]
[Pages 16556-16564]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2023-05239]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-R04-OAR-2021-0075; FRL-9361-01-R4]
Air Plan Approval; Alabama; Update to Materials Incorporated by
Reference
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule; notice of administrative change.
-----------------------------------------------------------------------
SUMMARY: The Environmental Protection Agency (EPA) is updating the
materials that are incorporated by reference (IBR) into the Alabama
State Implementation Plan (SIP). The regulations affected by this
update have been previously submitted by Alabama and approved by EPA.
EPA is also notifying the public of corrections to the Code of Federal
Regulations (CFR) tables that identify material incorporated by
reference into the Alabama SIP. This update affects the materials that
are available for public inspection at the National Archives and
Records Administration (NARA) and the EPA Regional Office.
DATES: This action is effective March 20, 2023.
[[Page 16557]]
ADDRESSES: The SIP materials whose incorporation by reference into 40
CFR part 52 is finalized through this action are available for
inspection at the following locations: Environmental Protection Agency,
Region 4, 61 Forsyth Street SW, Atlanta, GA 30303; and
<a href="http://www.regulations.gov">www.regulations.gov</a>. To view the materials at the Region 4 Office, EPA
requests that you email the contact listed in the FOR FURTHER
INFORMATION CONTACT section to schedule your inspection. The Regional
Office's official hours of business are Monday through Friday 8:30 a.m.
to 4:30 p.m., excluding Federal holidays.
FOR FURTHER INFORMATION CONTACT: Sarah LaRocca, Air Regulatory
Management Section, Air Planning and Implementation Branch, Air and
Radiation Division, Region 4, U.S. Environmental Protection Agency, 61
Forsyth Street SW, Atlanta, Georgia 30303-8960. Ms. LaRocca can be
reached via telephone at (404) 562-8994 and via electronic mail at
<a href="/cdn-cgi/l/email-protection#462a27342925252768352734272e0623362768212930"><span class="__cf_email__" data-cfemail="315d50435e5252501f4250435059715441501f565e47">[email protected]</span></a>.
SUPPLEMENTARY INFORMATION:
I. Background
Each state has a SIP containing the control measures and strategies
used to attain and maintain the national ambient air quality standards
(NAAQS). The SIP is extensive, containing such elements as air
pollution control regulations, emission inventories, monitoring
networks, attainment demonstrations, and enforcement mechanisms.
Each state must formally adopt the control measures and strategies
in the SIP after the public has had an opportunity to comment on them
and then submit the proposed SIP revisions to EPA. Once these control
measures and strategies are approved by EPA, and after notice and
comment, they are incorporated into the federally-approved SIP and are
identified in part 52--``Approval and Promulgation of Implementation
Plans,'' Title 40 of the Code of Federal Regulations (40 CFR part 52).
The full text of the state regulation approved by EPA is not reproduced
in its entirety in 40 CFR part 52 but is ``incorporated by reference.''
This means that EPA has approved a given state regulation or specified
changes to a given regulation with a specific effective date. The
public is referred to the location of the full text version should they
want to know which measures are contained in a given SIP. The
information provided allows EPA and the public to monitor the extent to
which a state implements a SIP to attain and maintain the NAAQS and to
take enforcement action for violations of the SIP.
The SIP is a living document which the state can revise as
necessary to address the unique air pollution problems in the state.
Therefore, EPA from time to time must take action on proposed revisions
containing new and/or revised regulations. A submission from a state
can revise one or more rules in their entirety or portions of rules.
The state indicates the changes in the submission (such as by using
redline/strikethrough text) and EPA then takes action on the requested
changes. EPA establishes a docket for its actions using a unique Docket
Identification Number, which is listed in each action. These dockets
and the complete submission are available for viewing on
<a href="http://www.regulations.gov">www.regulations.gov</a>.
On May 22, 1997 (62 FR 27968), EPA revised the procedures for
incorporating by reference, into the Code of Federal Regulations,
materials approved by EPA into each state SIP. These changes revised
the format for the identification of the SIP in 40 CFR part 52,
streamlined the mechanisms for announcing EPA approval of revisions to
a SIP, and streamlined the mechanisms for EPA's updating of the IBR
information contained for each SIP in 40 CFR part 52. The revised
procedures also called for EPA to maintain ``SIP Compilations'' that
contain the federally approved regulations and source-specific permits
submitted by each state agency. EPA generally updates these SIP
Compilations on an annual basis. Under the revised procedures, EPA must
periodically publish an informational document in the rules section of
the Federal Register notifying the public that updates have been made
to a SIP Compilation for a particular state. EPA began applying the
1997 revised procedures to Alabama on December 22, 1998, and is
providing this notice in accordance with such procedures. See 63 FR
70669.
II. EPA Action
In this action, EPA is providing notice of an update to the
materials incorporated by reference into the Alabama SIP as of August
31, 2022 and identified in 40 CFR 52.50(c) and (d). This update
includes SIP materials approved by EPA since the last IBR update. See
83 FR 13658 (March 30, 2018). In addition, EPA is providing notice of
the following corrections to 40 CFR 52.50(c) and (d):
Changes Applicable to Paragraph (c), EPA-Approved Alabama Regulations
A. Correcting the header of paragraph (c) from ``(c) EPA Approved
Alabama Regulations'' to ``(c) EPA-Approved Alabama Regulations''
B. Correcting Federal Register citations throughout to reflect the
beginning page of the preamble as opposed to that of the regulatory
text
C. Correcting a typographical error under Section 335-3-5-.01, by
changing the title, ``Fuel Combustions'' to ``Fuel Combustion''
D. Correcting a typographical error under Section 335-3-5-.10, by
changing the title, ``TR SO<INF>2</INF> Trading Program--computation of
time'' to ``TR SO<INF>2</INF> Trading Program--Computation of Time''
E. Correcting Section 335-3-6-.17, by changing the title, ``Manufacture
of Pneumatic Tires'' to read ``Manufacture of Pneumatic Rubber Tires''
F. Correcting Section 335-3-6-.34, by changing the title, ``Cutback
Asphalt'' to ``Cutback and Emulsified Asphalt''
G. Revising Section 335-3-6-.38, by changing the title, ``Manufacture
of Pneumatic Tires'' to ``Reserved,'' the state effective date from
``6/22/1989'' to ``7/31/1991'', and by changing the EPA approval date
from ``3/19/1990, 55 FR 10062'' to ``9/27/1993, 58 FR 50262''
H. Revising Section 335-3-6-.42, by changing the title, ``Leaks from
Petroleum Refinery Equipment'' to ``Reserved,'' the state effective
date from ``10/15/1996,'' to ``7/31/1991'', and by changing the EPA
approval date from ``6/6/1997, 62 FR 30991'' to ``9/27/1993, 58 FR
50262''
I. Revising Section 335-3-6-.46, by changing the title, ``Aerospace
Assembly and Component and Component Coatings Operation'' to
``Reserved,'' the state effective date from ``6/22/1989'' to ``7/31/
1991'', and by changing the EPA approval date from ``6/6/1997, 62 FR
30991'' to ``9/27/1993, 58 FR 50262''
J. Correcting a typographical error under Section 335-3-6-.47, by
changing the title from ``Leaks from Coke by-Product Recovery Plant
Equipment'' to ``Leaks From Coke By-product Recovery Plant Equipment''
K. Correcting a typographical error under Section 335-3-6-.48, by
changing the title from ``Emissions from Coke by-Product Recovery Plant
Coke Oven Gas Bleeder'' to ``Emissions From Coke By-product Recovery
Plant Coke Oven Gas Bleeder''
L. Correcting a typographical error under Section 335-3-7-.01, by
[[Page 16558]]
changing title from ``Metals Productions'' to ``Metals Production''
M. Correcting a typographical error under Section 335-3-9-.01, by
changing the title from ``Visible Emission Restriction for Motor
Vehicles'' to ``Visible Emission Restrictions for Motor Vehicles''
N. Amending Section 335-3-13-.01 as follows:
1. Changing the title from ``General'' to ``Definitions''
2. Changing the state effective date from ``10/15/1996'' to ``2/28/
1978''
3. Changing the EPA approval date from ``6/6/1997, 62 FR 30991'' to
``2/22/1982, 47 FR 7666''
O. Correcting Section 335-3-13-.04, by changing the title from
``Superphosphoric Acid Plants'' to ``Triple Superphosphate Plants''
P. Correcting Section 335-3-14-.04, by changing the title from ``Air
Permits Authorizing Construction in in Clean Air Areas [Prevention of
Significant Deterioration Permitting (PSD)] to ``Air Permits
Authorizing Construction in Clean Air Areas [Prevention of Significant
Deterioration Permitting (PSD)]''
Changes Applicable to Paragraph (d), EPA-Approved Alabama Source-
Specific Requirements
A. Correcting the header of paragraph (d) from ``(d) EPA approved
Alabama source specific requirements'' to ``(d) EPA-Approved Alabama
Source-Specific Requirements''
B. Correcting Table (d)'s title from ``EPA Approved Alabama Source
Specific Requirements'' to ``EPA-Approved Alabama Source Specific
Requirements''
III. Good Cause Exemption
EPA has determined that this action falls under the ``good cause''
exemption in section 553(b)(3)(B) of the Administrative Procedure Act
(APA) which, upon finding ``good cause,'' authorizes agencies to
dispense with public participation and section 553(d)(3) which allows
an agency to make an action effective immediately (thereby avoiding the
30-day delayed effective date otherwise provided for in the APA). This
administrative action simply codifies provisions which are already in
effect as a matter of law in Federal and approved state programs, makes
typographical/ministerial revisions to the tables in the CFR, and makes
ministerial changes to the prefatory heading to the tables in the CFR.
Under section 553(b)(3)(B) of the APA, an agency may find good cause
where procedures are ``impracticable, unnecessary, or contrary to the
public interest.'' Public comment for this administrative action is
``unnecessary'' and ``contrary to the public interest'' since the
codification (and corrections) only reflect existing law. Immediate
notice of this action in the Federal Register benefits the public by
providing the public notice of the updated Alabama SIP Compilation and
notice of corrections to the Alabama ``Identification of Plan'' portion
of the CFR. Further, pursuant to section 553(d)(3), making this action
immediately effective benefits the public by immediately updating both
the SIP Compilation and the CFR ``Identification of plan'' section
(which includes table entry corrections).
IV. Incorporation by Reference
In this rule, EPA is finalizing regulatory text that includes
incorporation by reference. In accordance with requirements of 1 CFR
51.5, EPA is finalizing the incorporation by reference of previously
EPA-approved regulations promulgated by Alabama and federally effective
prior to August 31, 2022. EPA has made, and will continue to make,
these materials generally available through <a href="http://www.regulations.gov">www.regulations.gov</a> and at
the EPA Region 4 Office (please contact the person identified in the
FOR FURTHER INFORMATION CONTACT section of this preamble for more
information).
V. Statutory and Executive Order Reviews
Under the CAA, the Administrator is required to approve a SIP
submission that complies with the provisions of the Act and applicable
Federal regulations. See 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in
reviewing SIP submissions, EPA's role is to approve state choices,
provided they meet the criteria of the CAA. Accordingly, this final
rule and notification of administrative change does not impose
additional requirements beyond those imposed by state law. For that
reason, this action:
<bullet> Is not a significant regulatory action subject to review
by the Office of Management and Budget under Executive Orders 12866 (58
FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011);
<bullet> Does not impose an information collection burden under the
provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
<bullet> Is certified as not having a significant economic impact
on a substantial number of small entities under the Regulatory
Flexibility Act (5 U.S.C. 601 et seq.);
<bullet> Does not contain any unfunded mandate or significantly or
uniquely affect small governments, as described in the Unfunded
Mandates Reform Act of 1995 (Pub. L. 104-4);
<bullet> Does not have Federalism implications as specified in
Executive Order 13132 (64 FR 43255, August 10, 1999);
<bullet> Is not an economically significant regulatory action based
on health or safety risks subject to Executive Order 13045 (62 FR
19885, April 23, 1997);
<bullet> Is not a significant regulatory action subject to
Executive Order 13211 (66 FR 28355, May 22, 2001);
<bullet> Is not subject to requirements of Section 12(d) of the
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272
note) because application of those requirements would be inconsistent
with the CAA; and
<bullet> Does not provide EPA with the discretionary authority to
address, as appropriate, disproportionate human health or environmental
effects, using practicable and legally permissible methods, under
Executive Order 12898 (59 FR 7629, February 16, 1994).
The SIP is not approved to apply on any Indian reservation land or
in any other area where EPA or an Indian tribe has demonstrated that a
tribe has jurisdiction. In those areas of Indian country, the rule does
not have tribal implications as specified by Executive Order 13175 (65
FR 67249, November 9, 2000), nor will it impose substantial direct
costs on tribal governments or preempt tribal law.
The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the
Small Business Regulatory Enforcement Fairness Act of 1996, generally
provides that before a rule may take effect, the agency promulgating
the rule must submit a rule report, which includes a copy of the rule,
to each House of the Congress and to the Comptroller General of the
United States. EPA will submit a report containing this action and
other required information to the U.S. Senate, the U.S. House of
Representatives, and the Comptroller General of the United States prior
to publication of the rule in the Federal Register. A major rule cannot
take effect until 60 days after it is published in the Federal
Register. This action is not a ``major rule'' as defined by 5 U.S.C.
804(2).
EPA also believes that the provisions of section 307(b)(1) of the
CAA pertaining to petitions for judicial review are not applicable to
this action. This is because prior EPA rulemaking actions for each
individual component of the Alabama SIP Compilation previously afforded
interested parties the opportunity to file a petition for judicial
review in the United States Court of Appeals for the appropriate
[[Page 16559]]
circuit within 60 days of such rulemaking action. Thus, EPA believes
judicial review of this action under section 307(b)(1) of the CAA is
not available.
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Carbon monoxide,
Incorporation by reference, Intergovernmental relations, Lead, Nitrogen
dioxide, Ozone, Particulate matter, Reporting and recordkeeping
requirements, Sulfur oxides, Volatile organic compounds.
Dated: March 9, 2023.
Daniel Blackman,
Regional Administrator, Region 4.
40 CFR part 52, is amended as follows:
PART 52--APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS
0
1. The authority for citation for part 52 continues to read as follows:
Authority: 42 U.S.C. 7401 et seq. Subpart B--Alabama
0
2. Sec. 52.50, paragraphs (b), (c), and (d), are revised to read as
follows:
Sec. 52.50 Identification of plan.
* * * * *
(b) Incorporation by reference. (1) Material listed in paragraphs
(c) and (d) of this section with an EPA approval date prior to August
31, 2022, for Alabama was approved for incorporation by reference by
the Director of the Federal Register in accordance with 5 U.S.C. 552(a)
and 1 CFR part 51. Materials are incorporated as it exists on the date
of the approval and notice of any change in the material will be
published in the Federal Register. Entries in paragraphs (c) and (d) of
this section with EPA approval dates after August 31, 2022, for Alabama
will be incorporated by reference in the next update to the SIP
compilation.
(2) EPA Region 4 certifies that the rules/regulations provided by
EPA in the SIP compilation at the addresses in paragraph (b)(3) of this
section are an exact duplicate of the officially promulgated State
rules/regulations which have been approved as part of the State
Implementation Plan as of the dates referenced in paragraph (b)(1) of
this section.
(3) Copies of the materials incorporated by reference may be
inspected at the Region 4 EPA Office at 61 Forsyth Street SW, Atlanta,
GA 30303. To obtain the material, please call (404) 562-9022. You may
also inspect the material with an EPA approval date prior to August 31,
2021, for Alabama, at the National Archives and Records Administration
(NARA). For information on the availability of this material at NARA,
please email <a href="/cdn-cgi/l/email-protection#6c0a09081e090b4200090b0d002c020d1e0d420b031a"><span class="__cf_email__" data-cfemail="26404342544341084a4341474a664847544708414950">[email protected]</span></a> or go to: <a href="http://www.archives.gov/federal-register/cfr/ibr-locations.html">http://www.archives.gov/federal-register/cfr/ibr-locations.html</a>.
(c) EPA-Approved Alabama Regulations.
Table 1 to Paragraph (c)--EPA-Approved Alabama Regulations
----------------------------------------------------------------------------------------------------------------
State
State citation Title/subject effective EPA approval date Explanation
date
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-1-1 Organization
----------------------------------------------------------------------------------------------------------------
Section 335-1-1-.03 Organization and 12/8/2017 7/6/2018, 83 FR 31454
Duties of the
Commission.
Section 335-1-1-.04 Organization of the 12/8/2017 7/6/2018, 83 FR 31454
Department.
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-3-1 General Provision
----------------------------------------------------------------------------------------------------------------
Section 335-3-1-.01 Purpose............... 6/22/1989 3/19/1990, 55 FR
10062.
Section 335-3-1-.02 Definitions........... 4/13/2020 9/21/2020, 85 FR
59192.
Section 335-3-1-.03 Ambient Air Quality 10/13/1998 3/1/1999, 64 FR 9918.
Standards.
Section 335-3-1-.04 Monitoring, Records, 10/15/1996 6/6/1997, 62 FR 30991
and Reporting.
Section 335-3-1-.05 Sampling and Testing 6/22/1989 3/19/1990, 55 FR
Methods. 10062.
Section 335-3-1-.06 Compliance Schedule... 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-1-.07 Maintenance and 10/15/1989 3/19/1990, 55 FR
Malfunctioning of 10062.
Equipment; Reporting.
Section 335-3-1-.08 Prohibition of Air 8/10/2000 12/8/2000, 65 FR
Pollution. 76938.
Section 335-3-1-.09 Variances............. 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-1-.10 Circumvention......... 6/22/1989 3/19/1990, 55 FR
10062.
Section 335-3-1-.11 Severability.......... 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-1-.12 Bubble Provision...... 6/22/1989 3/19/1990, 55 FR
10062.
Section 335-3-1-.13 Credible Evidence..... 4/13/1999 11/3/1999, 64 FR
59633.
Section 335-3-1-.15 Emissions Inventory 4/3/2003 4/24/2003, 68 FR
Reporting 20077.
Requirements.
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-3-2 Air Pollution Emergency
----------------------------------------------------------------------------------------------------------------
Section 335-3-2-.01 Air Pollution 6/22/1989 3/19/1990, 55 FR
Emergency. 10062.
Section 335-3-2-.02 Episode Criteria...... 8/10/2000 12/8/2000, 65 FR
76938.
Section 335-3-2-.03 Special Episode 6/22/1989 3/19/1990, 55 FR
Criteria. 10062.
Section 335-3-2-.04 Emission Reduction 6/22/1989 3/19/1990, 55 FR
Plans. 10062.
Section 335-3-2-.05 Two Contaminant 6/22/1989 3/19/1990, 55 FR
Episode. 10062.
Section 335-3-2-.06 General Episodes...... 6/22/1989 3/19/1990, 55 FR
10062.
Section 335-3-2-.07 Local Episodes........ 6/22/1989 3/19/1990, 55 FR
10062.
Section 335-3-2-.08 Other Sources......... 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-2-.09 Other Authority Not 6/22/1989 3/19/1990, 55 FR
Affected. 10062.
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-3-3 Control of Open Burning and Incineration
----------------------------------------------------------------------------------------------------------------
Section 335-3-3-.01 Open Burning.......... 1/22/2008 9/15/2008, 73 FR
53134.
Section 335-3-3-.02 Incinerators.......... 6/22/1989 3/19/1990, 55 FR
10062.
Section 335-3-3-.03 Incineration of Wood, 8/10/2000 12/8/2000, 65 FR
Peanut, and Cotton 76938.
Ginning Waste.
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-3-4 Control of Particulate Emissions
----------------------------------------------------------------------------------------------------------------
Section 335-3-4-.01 Visible Emissions..... 9/30/2008 10/15/2008, 73 FR
60957.
Section 335-3-4-.02 Fugitive Dust and 10/15/1996 6/6/1997, 62 FR 30991
Fugitive Emissions.
[[Page 16560]]
Section 335-3-4-.03 Fuel Burning Equipment 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-4-.04 Process Industries-- 10/15/1996 6/6/1997, 62 FR 30991
General.
Section 335-3-4-.05 Small Foundry Cupola.. 6/22/1989 3/19/1990, 55 FR
10062.
Section 335-3-4-.06 Cotton Gins........... 6/22/1989 3/19/1990, 55 FR
10062.
Section 335-3-4-.07 Kraft Pulp Mills...... 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-4-.08 Wood Waste Boilers.... 6/9/2017 10/13/2017, 82 FR
47631.
Section 335-3-4-.09 Coke Ovens............ 8/10/2000 12/8/2000, 65 FR
76938.
Section 335-3-4-.10 Primary Aluminum 6/22/1989 3/19/1990, 55 FR
Plants. 10062.
Section 335-3-4-.11 Cement Plants......... 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-4-.12 Xylene Oxidation 6/22/1989 3/19/1990, 55 FR
Process. 10062.
Section 335-3-4-.13 Sintering Plants...... 6/22/1989 3/19/1990, 55 FR
10062.
Section 335-3-4-.14 Grain Elevators....... 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-4-.15 Secondary Lead 10/15/1996 6/6/1997, 62 FR 30991
Smelters.
Section 335-3-4-.17 Steel Mills Located in 10/15/1996 6/6/1997, 62 FR 30991
Etowah County.
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-3-5 Control of Sulfur Compound Emissions
----------------------------------------------------------------------------------------------------------------
Section 335-3-5-.01 Fuel Combustion....... 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-5-.02 Sulfuric Acid Plants.. 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-5-.03 Petroleum Production.. 8/10/2000 12/8/2000, 65 FR
76938.
Section 335-3-5-.04 Kraft Pulp Mills...... 8/10/2000 12/8/2000, 65 FR
76938.
Section 335-3-5-.05 Process Industries-- 6/22/1989 3/19/1990, 55 FR
General. 10062.
Section 335-3-5-.06 TR SO2 Trading 11/24/2015 8/31/2016, 81 FR
Program--Purpose and 59869.
Definitions.
Section 335-3-5-.07 TR SO2 Trading 11/24/2015 8/31/2016, 81 FR
Program--Applicabilit 59869.
y.
Section 335-3-5-.08 TR SO2 Trading 11/24/2015 8/31/2016, 81 FR
Program--Retired Unit 59869.
Exemption.
Section 335-3-5-.09 TR SO2 Trading 11/24/2015 8/31/2016, 81 FR
Program--Standard 59869.
Requirements.
Section 335-3-5-.10 TR SO2 Trading 11/24/2015 8/31/2016, 81 FR
Program--Computation 59869.
of Time.
Section 335-3-5-.11 Administrative Appeal 11/24/2015 8/31/2016, 81 FR
Procedures. 59869.
Section 335-3-5-.12 SO2 Trading Budgets 11/24/2015 8/31/2016, 81 FR
and Variability 59869.
Limits.
Section 335-3-5-.13 TR SO2 Allowance 12/7/2018 3/12/2020, 85 FR
Allocations. 14418.
Section 335-3-5-.14 Authorization of 11/24/2015 8/31/2016, 81 FR
Designated 59869.
Representative and
Alternate Designated
Representative.
Section 335-3-5-.15 Responsibilities of 11/24/2015 8/31/2016, 81 FR
Designated 59869.
Representative and
Alternate Designated
Representative.
Section 335-3-5-.16 Changing Designated 11/24/2015 8/31/2016, 81 FR
Representative and 59869.
Alternate Designated
Representative;
Changes in Owners and
Operators; Changes in
Units at the Source.
Section 335-3-5-.17 Certificate of 11/24/2015 8/31/2016, 81 FR
Representation. 59869.
Section 335-3-5-.18 Objections Concerning 11/24/2015 8/31/2016, 81 FR
Designated 59869.
Representative and
Alternate Designated
Representative.
Section 335-3-5-.19 Delegation by 11/24/2015 8/31/2016, 81 FR
Designated 59869.
Representative and
Alternate Designated
Representative.
Section 335-3-5-.21 Establishment of 11/24/2015 8/31/2016, 81 FR
Compliance Accounts, 59869.
Assurance Accounts,
and General Accounts.
Section 335-3-5-.22 Recordation of TR SO2 11/24/2015 8/31/2016, 81 FR
Allowance Allocations 59869.
and Auction Results.
Section 335-3-5-.23 Submission of TR SO2 11/24/2015 8/31/2016, 81 FR
Allowance Transfers. 59869.
Section 335-3-5-.24 Recordation of TR SO2 11/24/2015 8/31/2016, 81 FR
Allowance Transfers. 59869.
Section 335-3-5-.25 Compliance with TR SO2 11/24/2015 8/31/2016, 81 FR
Emissions Limitation. 59869.
Section 335-3-5-.26 Compliance with TR SO2 11/24/2015 8/31/2016, 81 FR
Assurance Provisions. 59869.
Section 335-3-5-.27 Banking............... 11/24/2015 8/31/2016, 81 FR
59869.
Section 335-3-5-.28 Account Error......... 11/24/2015 8/31/2016, 81 FR
59869.
Section 335-3-5-.29 Administrator's Action 11/24/2015 8/31/2016, 81 FR
on Submissions. 59869.
Section 335-3-5-.31 General Monitoring, 11/24/2015 8/31/2016, 81 FR
Recordkeeping, and 59869.
Reporting
Requirements.
Section 335-3-5-.32 Initial Monitoring 11/24/2015 8/31/2016, 81 FR
System Certification 59869.
and Recertification
Procedures.
Section 335-3-5-.33 Monitoring System Out- 11/24/2015 8/31/2016, 81 FR
of-Control Periods. 59869.
Section 335-3-5-.34 Notifications 11/24/2015 8/31/2016, 81 FR
Concerning Monitoring. 59869.
Section 335-3-5-.35 Recordkeeping and 11/24/2015 8/31/2016, 81 FR
Reporting. 59869.
Section 335-3-5-.36 Petitions for 11/24/2015 8/31/2016, 81 FR
Alternatives to 59869.
Monitoring,
Recordkeeping, or
Reporting
Requirements.
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-3-6 Control of Organic Emissions
----------------------------------------------------------------------------------------------------------------
Section 335-3-6-.01 Applicability......... 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-6-.02 VOC Water Separation.. 4/15/1987 9/27/1993, 58 FR
50262.
Section 335-3-6-.03 Loading and Storage of 4/15/1987 9/27/1993, 58 FR
VOC. 50262.
Section 335-3-6-.04 Fixed-Roof Petroleum 10/15/1996 6/6/1997, 62 FR 30991
Liquid Storage
Vessels.
Section 335-3-6-.05 Bulk Gasoline Plants.. 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-6-.06 Bulk Gasoline 8/10/2000 12/8/2000, 65 FR
Terminals. 76938.
Section 335-3-6-.07 Gasoline Dispensing 10/15/1996 6/6/1997, 62 FR 30991
Facilities--Stage I.
Section 335-3-6-.08 Petroleum Refinery 6/22/1989 3/19/1990, 55 FR
Sources. 10062.
[[Page 16561]]
Section 335-3-6-.09 Pumps and Compressors. 6/22/1989 3/19/1990, 55 FR
10062.
Section 335-3-6-.10 Ethylene Producing 6/22/1989 3/19/1990, 55 FR
Plants. 10062.
Section 335-3-6-.11 Surface Coating....... 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-6-.12 Solvent Metal Cleaning 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-6-.13 Cutback Asphalt....... 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-6-.14 Petition for 6/22/1989 3/19/1990, 55 FR
Alternative Controls. 10062.
Section 335-3-6-.15 Compliance Schedules.. 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-6-.16 Test Methods and 8/10/2000 12/8/2000, 65 FR
Procedures. 76938.
Section 335-3-6-.17 Manufacture of 10/15/1996 6/6/1997, 62 FR 30991
Pneumatic Rubber
Tires.
Section 335-3-6-.18 Manufacture of 10/15/1996 6/6/1997, 62 FR 30991
Synthesized
Pharmaceutical
Products.
Section 335-3-6-.20 Leaks from Gasoline 10/15/1996 6/6/1997, 62 FR 30991
Tank Trucks and Vapor
Collection Systems.
Section 335-3-6-.21 Leaks from Petroleum 10/15/1996 6/6/1997, 62 FR 30991
Refinery Equipment.
Section 335-3-6-.22 Graphic Arts.......... 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-6-.23 Petroleum Liquid 10/15/1996 6/6/1997, 62 FR 30991
Storage in External
Floating Roof Tanks.
Section 335-3-6-.24 Applicability......... 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-6-.25 VOC Water Separation.. 6/22/1989 3/19/1990, 55 FR
10062.
Section 335-3-6-.26 Loading and Storage of 4/15/1987 9/27/1993, 58 FR
VOC. 50262.
Section 335-3-6-.27 Fixed-Roof Petroleum 10/15/1996 6/6/1997, 62 FR 30991
Liquid Storage
Vessels.
Section 335-3-6-.28 Bulk Gasoline Plants.. 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-6-.29 Gasoline Terminals.... 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-6-.30 Gasoline Dispensing 10/15/1996 6/6/1997, 62 FR 30991
Facilities Stage 1.
Section 335-3-6-.31 Petroleum Refinery 4/15/1987 9/27/1993, 58 FR
Sources. 50262.
Section 335-3-6-.32 Surface Coating....... 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-6-.33 Solvent Metal Cleaning 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-6-.34 Cutback and Emulsified 10/15/1996 6/6/1997, 62 FR 30991
Asphalt.
Section 335-3-6-.35 Petition for 4/15/1987 9/27/1993, 58 FR
Alternative Controls. 50262.
Section 335-3-6-.36 Compliances Schedules. 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-6-.37 Test Methods and 10/15/1996 6/6/1997, 62 FR 30991
Procedures.
Section 335-3-6-.38 Reserved.............. 7/31/1991 9/27/1993, 58 FR
50262.
Section 335-3-6-39 Manufacture of 10/15/1996 6/6/1997, 62 FR 30991
Synthesized
Pharmaceutical
Products.
Section 335-3-6-41 Leaks from Gasoline 10/15/1996 6/6/1997, 62 FR 30991
Tank Trucks and Vapor
Collection Systems.
Section 335-3-6-42 Reserved.............. 7/31/1991 9/27/1993, 58 FR
50262.
Section 335-3-6-43 Graphic Arts.......... 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-6-44 Petroleum Liquid 10/15/1996 6/6/1997, 62 FR 30991
Storage in External
Floating Roof Tanks.
Section 335-3-6-45 Large Petroleum Dry 10/15/1996 6/6/1997, 62 FR 30991
Cleaners.
Section 335-3-6-46 Reserved.............. 7/31/1991 9/27/1993, 58 FR
50262.
Section 335-3-6-47 Leaks From Coke By- 10/15/1996 6/6/1997, 62 FR 30991
product Recovery
Plant Equipment.
Section 335-3-6-48 Emissions From Coke By- 10/15/1996 6/6/1997, 62 FR 30991
product Recovery
Plant Coke Oven Gas
Bleeder.
Section 335-3-6-49 Manufacture of 10/15/1996 6/6/1997, 62 FR 30991
Laminated Countertops.
Section 335-3-6-50 Paint Manufacture..... 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-6-53 List of EPA Approved 10/15/1996 6/6/1997, 62 FR 30991
and Equivalent Test
Methods and
Procedures for the
Purpose of
Determining VOC
Emissions.
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-3-7 Carbon Monoxide Emissions
----------------------------------------------------------------------------------------------------------------
Section 335-3-7-01 Metals Production..... 6/22/1989 3/19/1990, 55 FR
10062.
Section 335-3-7-02 Petroleum Processes... 6/22/1989 3/19/1990, 55 FR
10062.
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-3-8 Control of Nitrogen Oxide Emissions
----------------------------------------------------------------------------------------------------------------
Section 335-3-8-01 Standards for Portland 4/6/2001 7/17/2001, 66 FR
Cement Kilns. 36919.
Section 335-3-8-02 Nitric Acid 10/15/1996 6/6/1997, 62 FR 30991
Manufacturing.
Section 335-3-8-03 NOX Emissions from 10/24/2000 11/7/2001, 66 FR
Electric Utility 56223.
Generating Units.
Section 335-3-8-04 Standards for 3/22/2005 12/28/2005, 70 FR
Stationary 76694.
Reciprocating
Internal Combustion
Engines.
Section 335-3-8-05 New Combustion Sources 1/16/2012 7/7/2021, 86 FR 35610
Section 335-3-8-07 TR NOX Annual Trading 11/24/2015 8/31/2016, 81 FR
Program--Purpose and 59869.
Definitions.
Section 335-3-8-08 TR NOX Annual Trading 11/24/2015 8/31/2016, 81 FR
Program--Applicabilit 59869.
y.
Section 335-3-8-09 TR NOX Annual Trading 11/24/2015 8/31/2016, 81 FR
Program--Retired Unit 59869.
Exemption.
Section 335-3-8-10 TR NOX Annual Trading 11/24/2015 8/31/2016, 81 FR
Program--Standard 59869.
Requirements.
Section 335-3-8-11 TR NOX Annual Trading 11/24/2015 8/31/2016, 81 FR
Program--Computation 59869.
of Time.
Section 335-3-8-12 Administrative Appeal 11/24/2015 8/31/2016, 81 FR
Procedures. 59869.
Section 335-3-8-13 NOX Annual Trading 11/24/2015 8/31/2016, 81 FR
Budgets and 59869.
Variability Limits.
Section 335-3-8-14 TR NOX Annual 12/7/2018 3/12/2020, 85 FR
Allowance Allocations. 14418.
[[Page 16562]]
Section 335-3-8-16 Authorization of 11/24/2015 8/31/2016, 81 FR
Designated 59869.
Representative and
Alternate Designated
Representative.
Section 335-3-8-17 Responsibilities of 11/24/2015 8/31/2016, 81 FR
Designated 59869.
Representative and
Alternate Designated
Representative.
Section 335-3-8-18 Changing Designated 11/24/2015 8/31/2016, 81 FR
Representative and 59869.
Alternate Designated
Representative;
Changes in Owners and
Operators; Changes in
Units at the Source.
Section 335-3-8-19 Certificate of 11/24/2015 8/31/2016, 81 FR
Representation. 59869.
Section 335-3-8-20 Objections Concerning 11/24/2015 8/31/2016, 81 FR
Designated 59869.
Representative and
Alternate Designated
Representative.
Section 335-3-8-21 Delegation by 11/24/2015 8/31/2016, 81 FR
Designated 59869.
Representative and
Alternate Designated
Representative.
Section 335-3-8-23 Establishment of 11/24/2015 8/31/2016, 81 FR
Compliance Accounts, 59869.
Assurance Accounts,
and General Accounts.
Section 335-3-8-24 Recordation of TR NOX 11/24/2015 8/31/2016, 81 FR
Annual Allowance 59869.
Allocations and
Auction Results.
Section 335-3-8-25 Submission of TR NOX 11/24/2015 8/31/2016, 81 FR
Annual Allowance 59869.
Transfers.
Section 335-3-8-26 Recordation of TR NOX 11/24/2015 8/31/2016, 81 FR
Annual Allowance 59869.
Transfers.
Section 335-3-8-27 Compliance with TR NOX 11/24/2015 8/31/2016, 81 FR
Annual Emissions 59869.
Limitation.
Section 335-3-8-28 Compliance with TR NOX 11/24/2015 8/31/2016, 81 FR
Annual Assurance 59869.
Provisions.
Section 335-3-8-29 Banking............... 11/24/2015 8/31/2016, 81 FR
59869.
Section 335-3-8-30 Account Error......... 11/24/2015 8/31/2016, 81 FR
59869.
Section 335-3-8-31 Administrator's Action 11/24/2015 8/31/2016, 81 FR
on Submissions. 59869.
Section 335-3-8-33 General Monitoring, 11/24/2015 8/31/2016, 81 FR
Recordkeeping, and 59869.
Reporting
Requirements.
Section 335-3-8-34 Initial Monitoring 11/24/2015 8/31/2016, 81 FR
System Certification 59869.
and Recertification
Procedures.
Section 335-3-8-35 Monitoring System Out- 11/24/2015 8/31/2016, 81 FR
of-Control Periods. 59869.
Section 335-3-8-36 Notifications 11/24/2015 8/31/2016, 81 FR
Concerning Monitoring. 59869.
Section 335-3-8-37 Recordkeeping and 11/24/2015 8/31/2016, 81 FR
Reporting. 59869.
Section 335-3-8-38 Petitions for 11/24/2015 8/31/2016, 81 FR
Alternatives to 59869.
Monitoring,
Recordkeeping, or
Reporting
Requirements.
Section 335-3-8-39 TR NOX Ozone Season 6/9/2017 10/6/2017, 82 FR
Group 2 Trading 46674.
Program--Purpose and
Definitions.
Section 335-3-8-40 TR NOX Ozone Season 10/5/2018 3/12/2020, 85 FR
Group 2 Trading 14418.
Program--Applicabilit
y.
Section 335-3-8-41 TR NOX Ozone Season 6/9/2017 10/6/2017, 82 FR
Group 2 Trading 46674.
Program--Retired Unit
Exemption.
Section 335-3-8-42 TR NOX Ozone Season 6/9/2017 10/6/2017, 82 FR
Group 2 Trading 46674.
Program--Standard
Requirements.
Section 335-3-8-43 TR NOX Ozone Season 6/9/2017 10/6/2017, 82 FR
Group 2 Trading 46674.
Program--Computation
of Time.
Section 335-3-8-44 Administrative Appeal 11/24/2015 10/6/2017, 82 FR
Procedures. 46674.
Section 335-3-8-45 NOX Ozone Season Group 6/9/2017 10/6/2017, 82 FR
2 Trading Budgets and 46674.
Variability Limits.
Section 335-3-8-46 TR NOX Ozone Season 12/7/2018 3/12/2020, 85 FR
Group 2 Allowance 14418.
Allocations.
Section 335-3-8-48 Authorization of 6/9/2017 10/6/2017, 82 FR
Designated 46674.
Representative and
Alternate Designated
Representative.
Section 335-3-8-49 Responsibilities of 6/9/2017 10/6/2017, 82 FR
Designated 46674.
Representative and
Alternate Designated
Representative.
Section 335-3-8-50 Changing Designated 6/9/2017 10/6/2017, 82 FR
Representative and 46674.
Alternate Designated
Representative;
Changes in Owners and
Operators; Changes in
Units at the Source.
Section 335-3-8-51 Certificate of 6/9/2017 10/6/2017, 82 FR
Representation. 46674.
Section 335-3-8-52 Objections Concerning 6/9/2017 10/6/2017, 82 FR
Designated 46674.
Representative and
Alternate Designated
Representative.
Section 335-3-8-53 Delegation by 6/9/2017 10/6/2017, 82 FR
Designated 46674.
Representative and
Alternate Designated
Representative.
Section 335-3-8-55 Establishment of 6/9/2017 10/6/2017, 82 FR
Compliance Accounts, 46674.
Assurance Accounts,
and General Accounts.
Section 335-3-8-56 Recordation of TR NOX 6/9/2017 10/6/2017, 82 FR
Ozone Season Group 2 46674.
Allowance Allocations
and Auction Results.
Section 335-3-8-57 Submission of TR NOX 6/9/2017 10/6/2017, 82 FR
Ozone Season Group 2 46674.
Allowance Transfers.
Section 335-3-8-58 Recordation of TR NOX 6/9/2017 10/6/2017, 82 FR
Ozone Season Group 2 46674.
Allowance Transfers.
Section 335-3-8-59 Compliance with TR NOX 6/9/2017 10/6/2017, 82 FR
Ozone Season Group 2 46674.
Emissions Limitation.
Section 335-3-8-60 Compliance with TR NOX 6/9/2017 10/6/2017, 82 FR
Ozone Season Group 2 46674.
Assurance Provisions.
[[Page 16563]]
Section 335-3-8-61 Banking............... 6/9/2017 10/6/2017, 82 FR
46674.
Section 335-3-8-62 TR NOX Ozone Season 6/9/2017 10/6/2017, 82 FR
Group 2 Trading 46674.
Program--Account
Error.
Section 335-3-8-63 TR NOX Ozone Season 6/9/2017 10/6/2017, 82 FR
Group 2 Trading 46674.
Program--Administrato
r's Action on
Submissions.
Section 335-3-8-65 General Monitoring, 6/9/2017 10/6/2017, 82 FR
Recordkeeping, and 46674.
Reporting
Requirements.
Section 335-3-8-66 Initial Monitoring 6/9/2017 10/6/2017, 82 FR
System Certification 46674.
and Recertification
Procedures.
Section 335-3-8-67 Monitoring System Out- 6/9/2017 10/6/2017, 82 FR
of-Control Periods. 46674.
Section 335-3-8-68 Notifications 6/9/2017 10/6/2017, 82 FR
Concerning Monitoring. 46674.
Section 335-3-8-69 Recordkeeping and 6/9/2017 10/6/2017, 82 FR
Reporting. 46674.
Section 335-3-8-70 Petitions for 6/9/2017 10/6/2017, 82 FR
Alternatives to 46674.
Monitoring,
Recordkeeping, or
Reporting
Requirements.
Section 335-3-8-71 NOX Budget Program.... 4/13/2020 7/7/2021, 86 FR 35610
Section 335-3-8-72 NOX Budget Program 12/13/2021 7/11/2022, 87 FR
Monitoring and 41061.
Reporting.
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-3-9 Control of Emissions from Motor Vehicles
----------------------------------------------------------------------------------------------------------------
Section 335-3-9-01 Visible Emission 10/15/1996 6/6/1997, 62 FR 30991
Restrictions for
Motor Vehicles.
Section 335-3-9-02 Ignition System and 8/10/2000 12/8/2000, 65 FR
Engine Speed. 76938.
Section 335-3-9-03 Crankcase Ventilation 8/10/2000 12/8/2000, 65 FR
Systems. 76938.
Section 335-3-9-04 Exhaust Emission 6/22/1989 3/19/1990, 55 FR
Control Systems. 10062.
Section 335-3-9-05 Evaporative Loss 6/22/1989 3/19/1990, 55 FR
Control Systems. 10062.
Section 335-3-9-06 Other Prohibited Acts. 8/10/2000 12/8/2000, 65 FR
76938.
Section 335-3-9-07 Effective Date........ 10/15/1996 6/6/1997, 62 FR 30991
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-3-12 Continuous Monitoring Requirements for Existing Sources
----------------------------------------------------------------------------------------------------------------
Section 335-3-12-01 General............... 6/22/1989 3/19/1990, 55 FR
10062.
Section 335-3-12-02 Emission Monitoring 2/17/1998 9/14/1998, 63 FR
and Reporting 49005.
Requirements.
Section 335-3-12-03 Monitoring System 6/22/1989 3/19/1990, 55 FR
Malfunction. 10062.
Section 335-3-12-04 Alternate Monitoring 6/22/1989 3/19/1990, 55 FR
and Reporting 10062.
Requirements.
Section 335-3-12-05 Exemptions and 6/22/1989 3/19/1990, 55 FR
Extensions. 10062.
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-3-13 Control of Fluoride Emissions
----------------------------------------------------------------------------------------------------------------
Section 335-3-13-01 Definitions........... 2/28/1978 2/22/1982, 47 FR 7666
Section 335-3-13-02 Superphosphoric Acid 10/15/1996 6/6/1997, 62 FR 30991
Plants.
Section 335-3-13-03 Diammonium Phosphate 10/15/1996 6/6/1997, 62 FR 30991
Plants.
Section 335-3-13-04 Triple Superphosphate 10/15/1996 6/6/1997, 62 FR 30991
Plants.
Section 335-3-13-05 Granular Triple 10/15/1996 6/6/1997, 62 FR 30991
Superphosphoric
Storage Facilities.
Section 335-3-13-06 Wet Process Phosphoric 10/15/1996 6/6/1997, 62 FR 30991
Acid Plants.
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-3-14 Air Permits
----------------------------------------------------------------------------------------------------------------
Section 335-3-14-01 General Provisions.... 6/9/2017 12/14/2018, 83 FR
64285.
Section 335-3-14-02 Permit Procedures..... 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-14-03 Standards for Granting 5/23/2011 9/26/2012, 77 FR
Permits. 59100.
Section 335-3-14-04 Air Permits 10/5/2018 7/3/2019, 84 FR 31741 Except for changes to
Authorizing 335-3-14-04(2)(w)1.,
Construction in Clean state effective July
Air Areas [Prevention 11, 2006, which
of Significant lists a 100 ton per
Deterioration year significant net
Permitting (PSD)]. emissions increase
for regulated NSR
pollutants not
otherwise specified
at 335-3-14-
04(2)(w). Except for
the significant
impact levels at 335-
3-14-04(10)(b) which
were withdrawn from
EPA consideration on
October 9, 2014.
Except for the
second sentence of
paragraph 335-3-14-
04(2)(bbb)2., as
well as the second
and fourth sentences
of paragraph 335-3-
14-04(2)(bbb)3.,
which include
changes from the
vacated federal ERP
rule and were
withdrawn from EPA
consideration by the
State on May 5,
2017.
[[Page 16564]]
Section 335-3-14-05 Air Permits 6/9/2017 12/14/2018, 83 FR With the exception
Authorizing 64285. of: The portion of
Construction in or 335-3-14-05(1)(k)
Near Nonattainment stating ``excluding
Areas. ethanol production
facilities that
produce ethanol by
natural
fermentation''; and
335-3-14-05(2)(c)3
(addressing fugitive
emission increases
and decreases). Also
with the exception
of the state-
withdrawn elements:
335-3-14-05(1)(h)
(the actual-to-
potential test for
projects that only
involve existing
emissions units);
the last sentence at
335-3-14-05(3)(g),
stating
``Interpollutant
offsets shall be
determined based
upon the following
ratios''; and the
NNSR interpollutant
ratios at 335-3-14-
05(3)(g)1-4.
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-3-15 Synthetic Minor Operating Permits
----------------------------------------------------------------------------------------------------------------
Section 335-3-15-01 Definitions........... 10/15/1996 6/6/1997, 62 FR 30991
Section 335-3-15-02 General Provisions.... 8/10/2000 12/8/2000, 65 FR
76938.
Section 335-3-15-03 Applicability......... 11/23/1993 10/20/1994, 59 FR
52916.
Section 335-3-15-04 Synthetic Minor 10/15/1996 6/6/1997, 62 FR 30991
Operating Permit
Requirements.
Section 335-3-15-05 Public Participation.. 6/9/2017 12/14/2018, 83 FR
64285.
----------------------------------------------------------------------------------------------------------------
Chapter No. 335-3-17 Conformity of Federal Actions to State Implementation Plans
----------------------------------------------------------------------------------------------------------------
Section 335-3-17-01 Transportation 5/28/2013 10/12/2017, 82 FR
Conformity. 47383.
Section 335-3-17-02 General Conformity.... 5/23/2011 9/26/2012, 77 FR
59100.
----------------------------------------------------------------------------------------------------------------
(d) EPA-Approved Alabama Source-Specific Requirements.
Table 2 to Paragraph (d)--EPA-Approved Alabama Source-Specific Requirements
----------------------------------------------------------------------------------------------------------------
State
Name of source Permit No. effective EPA approval date Explanation
date
----------------------------------------------------------------------------------------------------------------
Lafarge Cement Kiln............. AB70004_1_01............ 2/6/2008 7/30/2009, 74 FR Certain provisions
37945. of the permit.
Lehigh Cement Kiln.............. 4-07-0290-03............ 2/6/2008 7/30/2009, 74 FR Certain provisions
37945. of the permit.
----------------------------------------------------------------------------------------------------------------
* * * * *
[FR Doc. 2023-05239 Filed 3-17-23; 8:45 am]
BILLING CODE 6560-50-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.