Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the Installation of a Terminal Groin Structure Along the Inlet Shoulder of the New River Inlet and the Placement of the Dredge Material for the Fillet Along Approximately 2,000 Linear Feet of Ocean Shoreline of North Topsail Beach in Onslow County, NC
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
The U.S. Army Corps of Engineers (USACE), Wilmington District, Wilmington Regulatory Field Office has received a request for Department of the Army (DA) authorization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbor Act, from the Town of North Topsail Beach to construct a terminal groin and its associated oceanfront fillet placement along approximately 2,000 linear feet of oceanfront shoreline. Additionally, the installation of the terminal groin will be conjunction with the existing May 27, 2011, DA authorization that permitted the Town to relocate the New River Inlet ebb tide channel, conduct maintenance events within the channel, and perform a phased beach nourishment along approximately 11 miles of oceanfront shoreline. The DA authorization for the maintenance operation expires on December 31, 2041. The main purpose of adding the terminal groin is to provide additional shoreline protection of the Town's infrastructure, specifically along the northeastern end of island.
Full Text
<html>
<head>
<title>Federal Register, Volume 88 Issue 38 (Monday, February 27, 2023)</title>
</head>
<body><pre>
[Federal Register Volume 88, Number 38 (Monday, February 27, 2023)]
[Notices]
[Pages 12352-12353]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2023-03914]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army, Corps of Engineers
Intent To Prepare a Draft Environmental Impact Statement (DEIS)
for the Installation of a Terminal Groin Structure Along the Inlet
Shoulder of the New River Inlet and the Placement of the Dredge
Material for the Fillet Along Approximately 2,000 Linear Feet of Ocean
Shoreline of North Topsail Beach in Onslow County, NC
AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD.
ACTION: Notice of intent.
-----------------------------------------------------------------------
SUMMARY: The U.S. Army Corps of Engineers (USACE), Wilmington District,
Wilmington Regulatory Field Office has received a request for
Department of the Army (DA) authorization, pursuant to Section 404 of
the Clean Water Act and Section 10 of the Rivers and Harbor Act, from
the Town of North Topsail Beach to construct a terminal groin and its
associated oceanfront fillet placement along approximately 2,000 linear
feet of oceanfront shoreline. Additionally, the installation of the
terminal groin will be conjunction with the existing May 27, 2011, DA
authorization that permitted the Town to relocate the New River Inlet
ebb tide channel, conduct maintenance events within the channel, and
perform a phased beach nourishment along approximately 11 miles of
oceanfront shoreline. The DA authorization for the maintenance
operation expires on December 31, 2041. The main purpose of adding the
terminal groin is to provide additional shoreline protection of the
Town's infrastructure, specifically along the northeastern end of
island.
DATES: No comments are requested, so there are no dates applicable to
this Notice of Intent.
ADDRESSES: Questions regarding this notice may be submitted to: U.S.
Army Corps of Engineers, Wilmington District, Regulatory Division.
ATTN: File Number: SAW-2016-02091, 69 Darlington Avenue, Wilmington, NC
28403 or <a href="/cdn-cgi/l/email-protection#0865616b636d71267c267b7d6f6f487d7b696b6d26697a657126656164"><span class="__cf_email__" data-cfemail="b2dfdbd1d9d7cb9cc69cc1c7d5d5f2c7c1d3d1d79cd3c0dfcb9cdfdbde">[email protected]</span></a>.
FOR FURTHER INFORMATION CONTACT: Questions about the proposed action
and Draft EIS can be directed to Mr. Mickey Sugg, Chief, Wilmington
Regulatory Field Office, at telephone (910) 251-4811; email
<a href="/cdn-cgi/l/email-protection#80ede9e3ebe5f9aef4aef3f5e7e7c0f5f3e1e3e5aee1f2edf9aeede9ec"><span class="__cf_email__" data-cfemail="c8a5a1aba3adb1e6bce6bbbdafaf88bdbba9abade6a9baa5b1e6a5a1a4">[email protected]</span></a>; or regular mail at (see ADDRESSES).
SUPPLEMENTARY INFORMATION:
1. Proposed Action. On May 27, 2011, the USACE granted DA
authorization to the Town of North Topsail Beach to implement a
shoreline protection project, which encompassed the relocation of the
New River Inlet ebb tide channel and nourishment of approximately 11
miles of the Town's oceanfront shoreline. This authorization also
allowed the Town to conduct channel maintenance dredging to maintain
the ebb tide channel within a pre-determined location to improve
shoreline protection along the eastern end of the island. The initial
construction of the channel relocation was completed in January 2013,
but no subsequent maintenance dredging has taken place. Upon the
completion of the channel relocation, the Town re-evaluated the post-
construction conditions and the project's performance and is currently
seeking to supplement the existing inlet management project with the
installation of a terminal groin to enhance the oceanfront protection
along the most western end of the island.
The proposed plans for a terminal groin consist of constructing the
structure along the eastern shoulder of the New River Inlet and
building the groin's fillet (or oceanfront shoreline) with material
dredged during an inlet channel maintenance event. The terminal groin
would consist of a 2,021-ft-long sheet pile and rubble-mound structure
with several distinct components, including a 345-ft-long sheet pile
anchor section extending landward of the primary dune, an 894-ft-long
sheet pile upland section extending seaward from the primary dune
across the inlet/oceanfront dry beach, and a 782-ft-long rubble mound
in-water section extending seaward of the MHW line. The anchor and
upland sheet pile groin sections would have maximum crest elevations of
+5 feet NAVD that are slightly lower than the natural beach berm
elevation of +6 ft NAVD. The in-water rubble-mound section, consisting
of 4- to 6-ft-diameter granite armor stone, would have a crest
elevation of +5 feet NAVD, a crest width of 5 feet, and a base width of
~40 feet. Conventional land-based heavy equipment would be used to
construct both the onshore and in-water groin sections. Construction of
the onshore (anchor and upland) sections would involve excavating the
groin footprint, installing sheet pile and armor stone scour aprons to
design specifications, covering the completed structure with the
original excavated material, and grading the work area to reestablish
pre-construction beach profiles. Depending on the position of the
shoreline, construction of the in-water groin
[[Page 12353]]
section may require work from a temporary trestle, or an embankment,
built out from the shoreline using existing beach material. It is
anticipated that all of the stone for groin construction would be
hauled in by trucks from the quarry site. Once the structure is in
place, beach fill material would be placed southward of the terminal
groin to construct the north end beach fill and groin fillet. The groin
fillet would consist of a tapered fill section extending 2,000 feet
southwest from the groin along the seaward margin of the +6-ft berm.
Initial construction of the fillet and a projected four-year
maintenance nourishment event would require ~310,000 cy of beach fill.
Based on a four-year nourishment cycle, an estimated volume of ~2.35
million cubic yards of beach fill would be required over a total 30-
year period.
2. Scoping Process. A local Public Notice was issued on March 15,
2021, announcing an initial scoping meeting (a Facebook Live event) and
included a 30-day commenting period that ended on April 14, 2021. The
scoping meeting was held on March 25, 2021, and all received comments
were evaluated and considered in the preparation of the Draft EIS.
Additionally, the USACE will reinitiate consultation with the U.S.
Fish and Wildlife Service under the Endangered Species Act and the Fish
and Wildlife Coordination Act; with the National Marine Fisheries
Service under the Magnuson-Stevens Fishery Conservation and Management
Act and the Endangered Species Act; and with the North Carolina State
Historic Preservation Office under the National Historic Preservation
Act. Additionally, the USACE will coordinate the proposed project with
the North Carolina Division of Water Quality (NCDWQ) to assess the
potential water quality impacts pursuant to Section 401 of the Clean
Water Act, and with the North Carolina Division of Coastal Management
(NCDCM) to determine the projects consistency with the Coastal Zone
Management Act. The USACE will closely work with NCDCM and NCDWQ in the
development of the EIS to ensure the process complies with all State
Environmental Policy Act (SEPA) requirements. It is the intention of
both the USACE and the State of North Carolina to consolidate the NEPA
and any required SEPA processes thereby eliminating duplication.
3. Alternatives. Several alternatives, including various borrow
areas, are being considered for the proposed project. The following
alternatives have determined to be reasonable options for the Town's
proposal and each will be evaluated in the EIS: (1) No Action
(Continuation of existing USACE-authorized Beach and Inlet Management),
(2) Abandon and Retreat (No use of existing USACE-authorized Beach and
Inlet Management and/or other USACE permitting actions), (3) Beach
Nourishment Only, (4) Beach Nourishment and Terminal Groin (No use of
existing USACE-authorized Beach and Inlet Management), and (5) Beach
Nourishment, Terminal Groin, and Use of existing USACE-authorized Inlet
Management.
4. Availability of the Draft EIS. The Draft EIS is expected to be
published and circulated the summer of 2023; and a public hearing will
be held after the publication of the Draft EIS.
Daniel H. Hibner,
Brigadier General, U.S. Army, Commanding.
[FR Doc. 2023-03914 Filed 2-24-23; 8:45 am]