Notice2022-27124
Dominion Energy South Carolina, Inc.; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
December 14, 2022
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 87 Issue 239 (Wednesday, December 14, 2022)</title>
</head>
<body><pre>
[Federal Register Volume 87, Number 239 (Wednesday, December 14, 2022)]
[Notices]
[Page 76471]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2022-27124]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 516-513]
Dominion Energy South Carolina, Inc.; Notice of Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Non-project use of project lands and water.
b. Project No: 516-513.
c. Date Filed: September 9, 2022.
d. Applicant: Dominion Energy South Carolina, Inc. (licensee).
e. Name of Project: Saluda Hydroelectric Project.
f. Location: The project is located on the Saluda River in
Lexington, Newberry, Richland, and Saluda counties, near the City of
Columbia, South Carolina.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Dominion Energy South Carolina, Inc., Raymond
R. Ammarell, P.E., Manager, Dam Safety and Civil Engineering, 220
Operation Way, Mail Code B223, Cayce, SC 29033-3701, Phone (803) 217-
7322.
i. FERC Contact: Robert Ballantine at (202) 502-6289 or
<a href="/cdn-cgi/l/email-protection#72001d101700065c10131e1e131c061b1c1732141700115c151d04"><span class="__cf_email__" data-cfemail="671508050215134905060b0b0609130e0902270102150449000811">[email protected]</span></a>.
j. Deadline for filing comments, motions to intervene, and
protests: January 9, 2023.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at <a href="http://www.ferc.gov/docs-filing/efiling.asp">http://www.ferc.gov/docs-filing/efiling.asp</a>.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at <a href="http://www.ferc.gov/docs-filing/ecomment.asp">http://www.ferc.gov/docs-filing/ecomment.asp</a>. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at <a href="/cdn-cgi/l/email-protection#f9bfbcabbab6979590979caa8c8989968b8db99f9c8b9ad79e968f"><span class="__cf_email__" data-cfemail="ca8c8f988985a4a6a3a4af99bfbabaa5b8be8aacafb8a9e4ada5bc">[email protected]</span></a>, (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426. The first page of any filing
should include docket number P-516-513. Comments emailed to Commission
staff are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: The licensee requests Commission
approval of a non-project use of project lands and water for the City
of West Columbia to upgrade and increase the authorized maximum
withdrawal of water by the Lake Murray Water Treatment Plant for public
drinking water supply. The Plant is located on Lake Murray in Lexington
County, SC. The upgrade would include the installation of new pumps and
a larger diameter raw water intake main to accommodate larger flows.
Permitted water withdrawal would increase from the current maximum of
48 million gallons per day (MGD) to a maximum of 72 MGD.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE, Room 2A, Washington, DC
20426, or by calling (202) 502-8371. This filing may also be viewed on
the Commission's website at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at <a href="http://www.ferc.gov/docs-filing/esubscription.asp">http://www.ferc.gov/docs-filing/esubscription.asp</a> to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call (866) 208-3676 or email
<a href="/cdn-cgi/l/email-protection#a7e1e2f5e4e8c9cbcec9c2f4d2d7d7c8d5d3e7c1c2d5c489c0c8d1"><span class="__cf_email__" data-cfemail="e7a1a2b5a4a8898b8e8982b4929797889593a781829584c9808891">[email protected]</span></a>, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above. Agencies may obtain copies of the application directly from
the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS''; ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests, must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: December 8, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-27124 Filed 12-13-22; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on December 14, 2022.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.