Notice2022-26681
Cameron LNG, LLC; Notice of Availability of the Environmental Assessment for the Proposed Cameron LNG Amended Expansion Project
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
December 8, 2022
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 87 Issue 235 (Thursday, December 8, 2022)</title>
</head>
<body><pre>
[Federal Register Volume 87, Number 235 (Thursday, December 8, 2022)]
[Notices]
[Pages 75246-75247]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2022-26681]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP22-41-000]
Cameron LNG, LLC; Notice of Availability of the Environmental
Assessment for the Proposed Cameron LNG Amended Expansion Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared an environmental assessment (EA) for the
Cameron LNG Amended Expansion Project, proposed by Cameron LNG, LLC
(Cameron LNG) in the above-referenced docket. Cameron LNG requests
several design modifications and enhancements to the approved Cameron
Expansion Project at its existing liquified natural gas (LNG) terminal
located in Cameron and Calcasieu Parishes, Louisiana.
The EA assesses the potential environmental effects of the
construction and operation of the Cameron LNG Amended Expansion Project
in accordance with the requirements of the National Environmental
Policy Act (NEPA). The FERC staff concludes that approval of the
proposed project amendment, with appropriate mitigating measures, would
not constitute a major federal action significantly affecting the
quality of the human environment.
The U.S. Department of Energy, U.S. Department of Transportation's
Pipeline and Hazardous Materials Safety Administration, and U.S. Coast
Guard participated as cooperating agencies in the preparation of the
EA. Cooperating agencies have jurisdiction by law or special expertise
with respect to resources potentially affected by the proposal and
participate in the NEPA analysis.
Cameron LNG proposes to amend its authorization under section 3 of
the Natural Gas Act for the Cameron Expansion Project that was issued
by the Commission on May 5, 2016 (Docket No. CP15-560-000).
Specifically, Cameron LNG proposes to modify the approved Train 4 and
perform associated design enhancements; and to no longer construct
Train 5 or Tank 5. In addition, Cameron LNG proposes an additional
design enhancement to allow for the capability to simultaneously load
two LNG vessels at a rate of 12,000 cubic meters/hour at both the North
and South Jetties. The proposed amendment is intended to increase the
overall reliability and capacity of Train 4 and eliminate impacts from
construction and operation of Train 5. The overall maximum production
capacity of the Amended Expansion Project would be reduced from 9.97 to
6.75 million tonnes per annum.
The Commission mailed a copy of the Notice of Availability of the
EA to federal, state, and local government representatives and
agencies; elected officials; environmental and public interest groups;
Native American Tribes; potentially affected landowners and other
interested individuals and groups; and newspapers and libraries in the
project area. The EA is only available in
[[Page 75247]]
electronic format. It may be viewed and downloaded from the FERC's
website (<a href="http://www.ferc.gov">www.ferc.gov</a>), on the natural gas environmental documents page
(<a href="https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents">https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents</a>). In addition, the EA may be accessed by using
the eLibrary link on the FERC's website. Click on the eLibrary link
(<a href="https://elibrary.ferc.gov/eLibrary/search">https://elibrary.ferc.gov/eLibrary/search</a>), select ``General Search''
and enter the docket number in the ``Docket Number'' field (i.e., CP22-
41-000). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
<a href="/cdn-cgi/l/email-protection#5f193a2d3c10313336313a0c2a2f2f302d2b1f393a2d3c71383029"><span class="__cf_email__" data-cfemail="d492b1a6b79bbab8bdbab187a1a4a4bba6a094b2b1a6b7fab3bba2">[email protected]</span></a> or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659.
The EA is not a decision document. It presents Commission staff's
independent analysis of the environmental issues for the Commission to
consider when addressing the merits of all issues in this proceeding.
Any person wishing to comment on the EA may do so. Your comments should
focus on the EA's disclosure and discussion of potential environmental
effects, reasonable alternatives, and measures to avoid or lessen
environmental impacts. The more specific your comments, the more useful
they will be. To ensure that the Commission has the opportunity to
consider your comments prior to making its decision on this project, it
is important that we receive your comments in Washington, DC on or
before 5:00 p.m. Eastern Time on January 3, 2023.
For your convenience, there are three methods you can use to file
your comments to the Commission. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or <a href="/cdn-cgi/l/email-protection#c98facbbaa86a7a5a0a7ac9abcb9b9a6bbbd89afacbbaae7aea6bf"><span class="__cf_email__" data-cfemail="b2f4d7c0d1fddcdedbdcd7e1c7c2c2ddc0c6f2d4d7c0d19cd5ddc4">[email protected]</span></a>. Please carefully follow these
instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature on the Commission's website (<a href="http://www.ferc.gov">www.ferc.gov</a>) under the link to
FERC Online. This is an easy method for submitting brief, text-only
comments on a project;
(2) You can also file your comments electronically using the
eFiling feature on the Commission's website (<a href="http://www.ferc.gov">www.ferc.gov</a>) under the
link to FERC Online. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the Commission. Be sure to reference the project docket number (CP22-
41-000) on your letter. Submissions sent via the U.S. Postal Service
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
20426. Submissions sent via any other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, Maryland 20852.
Filing environmental comments will not give you intervenor status,
but you do not need intervenor status to have your comments considered.
Only intervenors have the right to seek rehearing or judicial review of
the Commission's decision. At this point in this proceeding, the
timeframe for filing timely intervention requests has expired. Any
person seeking to become a party to the proceeding must file a motion
to intervene out-of-time pursuant to Rule 214(b)(3) and (d) of the
Commission's Rules of Practice and Procedures (18 CFR 385.214(b)(3) and
(d)) and show good cause why the time limitation should be waived.
Motions to intervene are more fully described at <a href="https://www.ferc.gov/how-intervene">https://www.ferc.gov/how-intervene</a>.
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website (<a href="http://www.ferc.gov">www.ferc.gov</a>) using the eLibrary link. The eLibrary link
also provides access to the texts of all formal documents issued by the
Commission, such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to <a href="https://www.ferc.gov/ferc-online/overview">https://www.ferc.gov/ferc-online/overview</a> to
register for eSubscription.
Dated: December 2, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-26681 Filed 12-7-22; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on December 8, 2022.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.