Notice2022-26093

Tres Palacios Gas Storage LLC; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Tres Palacios Cavern 4 Expansion Project

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
November 30, 2022

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 87 Issue 229 (Wednesday, November 30, 2022)</title>
</head>
<body><pre>
[Federal Register Volume 87, Number 229 (Wednesday, November 30, 2022)]
[Notices]
[Pages 73547-73549]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2022-26093]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP23-3-000]


Tres Palacios Gas Storage LLC; Notice of Scoping Period 
Requesting Comments on Environmental Issues for the Proposed Tres 
Palacios Cavern 4 Expansion Project

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental document that will discuss 
the environmental impacts of the Tres Palacios Cavern 4 Expansion 
Project (Expansion Project) involving construction and operation of 
facilities by Tres Palacios Gas Storage LLC (Tres Palacios) in 
Matagorda County, Texas. The Commission will use this environmental 
document in its decision-making process to determine whether the 
project is in the public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies regarding the Expansion Project. As part of the National 
Environmental Policy Act (NEPA) review process, the Commission takes 
into account concerns the public may have about proposals and the 
environmental impacts that could result from its action whenever it 
considers the issuance of a Certificate of Public Convenience and 
Necessity. This gathering of public input is referred to

[[Page 73548]]

as ``scoping.'' The main goal of the scoping process is to focus the 
analysis in the environmental document on the important environmental 
issues. Additional information about the Commission's NEPA process is 
described below in the NEPA Process and Environmental Document section 
of this notice.
    By this notice, the Commission requests public comments on the 
scope of issues to address in the environmental document. To ensure 
that your comments are timely and properly recorded, please submit your 
comments so that the Commission receives them in Washington, DC on or 
before 5 p.m. Eastern Time on December 23, 2022. Details on how to 
submit comments are provided in the Public Participation section of 
this notice.
    Your comments should focus on the potential environmental effects, 
reasonable alternatives, and measures to avoid or lessen environmental 
impacts. Your input will help the Commission staff determine what 
issues they need to evaluate in the environmental document. Commission 
staff will consider all written comments during the preparation of the 
environmental document.
    If you submitted comments on this project to the Commission before 
the opening of this docket on October 26, 2022, you will need to file 
those comments in Docket No. CP23-3-000 to ensure they are considered 
as part of this proceeding.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives should notify their constituents of this proposed 
project and encourage them to comment on their areas of concern.
    Tres Palacios provided landowners with a fact sheet prepared by the 
FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do 
I Need To Know?'' which addresses typically asked questions, including 
how to participate in the Commission's proceedings. This fact sheet 
along with other landowner topics of interest are available for viewing 
on the FERC website (<a href="http://www.ferc.gov">www.ferc.gov</a>) under the Natural Gas, Landowner 
Topics link.

Public Participation

    There are three methods you can use to submit your comments to the 
Commission. Please carefully follow these instructions so that your 
comments are properly recorded. The Commission encourages electronic 
filing of comments and has staff available to assist you at (866) 208-
3676 or <a href="/cdn-cgi/l/email-protection#f6b0938495b9989a9f9893a5838686998482b690938495d8919980"><span class="__cf_email__" data-cfemail="6b2d0e190824050702050e381e1b1b04191f2b0d0e1908450c041d">[email&#160;protected]</span></a>.
    (1) You can file your comments electronically using the eComment 
feature, which is located on the Commission's website (<a href="http://www.ferc.gov">www.ferc.gov</a>) 
under the link to FERC Online. Using eComment is an easy method for 
submitting brief, text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature, which is located on the Commission's website (<a href="http://www.ferc.gov">www.ferc.gov</a>) 
under the link to FERC Online. With eFiling, you can provide comments 
in a variety of formats by attaching them as a file with your 
submission. New eFiling users must first create an account by clicking 
on ``eRegister.'' You will be asked to select the type of filing you 
are making; a comment on a particular project is considered a ``Comment 
on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the Commission. Be sure to reference the project docket number (CP23-3-
000) on your letter. Submissions sent via the U.S. Postal Service must 
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, MD 20852.
    Additionally, the Commission offers a free service called 
eSubscription which makes it easy to stay informed of all issuances and 
submittals regarding the dockets/projects to which you subscribe. These 
instant email notifications are the fastest way to receive notification 
and provide a link to the document files which can reduce the amount of 
time you spend researching proceedings. Go to <a href="https://www.ferc.gov/ferc-online/overview">https://www.ferc.gov/ferc-online/overview</a> to register for eSubscription.

Summary of the Proposed Project

    Tres Palacios proposes to expand its certificated natural gas 
storage capacity \1\ at its existing natural gas storage facility (the 
Storage Facility) in Matagorda County, Texas. The Expansion Project 
would add approximately 6.5 billion cubic feet (Bcf) of new working gas 
capacity and 3.5 Bcf of base gas at the Storage Facility. According to 
Tres Palacios, its project would help satisfy market demand for 
incremental natural gas storage in the previously developed area 
located near the Storage Facility. Tres Palacios also states the 
Expansion Project is needed to provide critical natural gas grid 
reliability, and to help reduce price volatility and physical supply 
and demand imbalances in the Gulf Coast natural gas market.
---------------------------------------------------------------------------

    \1\ September 20, 2007 Order Issuing Certificates in Docket No. 
CP07-90-000, et al., as amended on December 14, 2010, in Docket No. 
CP10-499-000, on August 10, 2011, in Docket No. CP11-507-000, and on 
September 21, 2017, in Docket CP16-145-000.
---------------------------------------------------------------------------

    The Expansion Project would consist of the following facilities and 
activities:
    <bullet> Conversion of an existing third-party brine production 
well (Trull 11) into a natural gas storage cavern (Cavern 4);
    <bullet> Development of the Trull 11 well pad site for Cavern 4 
(Cavern 4 Well Pad);
    <bullet> Construction of a 0.6-mile-long, 16-inch-diameter pipeline 
(New Cavern 4 Pipeline) connecting Cavern 4 to the existing 
certificated facilities at the Storage Facility;
    <bullet> Abandonment in place of a 15,300 horsepower electric-motor 
driven centrifugal compressor unit;
    <bullet> Installation of a new 5,500 horsepower electric-motor 
driven reciprocating compressor unit;
    <bullet> Addition of a new 2.5 million British thermal units per 
hour dehydration unit;
    <bullet> Construction of various related facilities, including a 
new permanent access road for the Cavern 4 Well Pad; and
    <bullet> Non-jurisdictional facilities consisting of a new electric 
service line to the Cavern 4 Well Pad and a new fiber optic line from 
the Cavern 4 Well Pad to the Storage Facility.
    The general location of the Expansion Project facilities is shown 
in appendix 1.\2\
---------------------------------------------------------------------------

    \2\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of the appendices were sent to all 
those receiving this notice in the mail and are available at 
<a href="http://www.ferc.gov">www.ferc.gov</a> using the link called ``eLibrary.'' For instructions on 
connecting to eLibrary, refer to the last page of this notice. At 
this time, the Commission has suspended access to the Commission's 
Public Reference Room due to the proclamation declaring a National 
Emergency concerning the Novel Coronavirus Disease (COVID-19), 
issued by the President on March 13, 2020. For assistance, contact 
FERC at <a href="/cdn-cgi/l/email-protection" class="__cf_email__" data-cfemail="c68083948589a8aaafa8a395b3b6b6a9b4b286a0a3b4a5e8a1a9b0">[email&#160;protected]</a> or call toll free, (886) 208-3676 
or TTY (202) 502-8659.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities would disturb about 22.3 
acres of land. Following construction, Tres Palacios would maintain 
about 3.0 acres for permanent operation of the project's facilities; 
the remaining acreage would be restored and revert to former uses. 
About 31 percent of the proposed pipeline route parallels existing 
pipeline, utility, or road rights-of-way. Tres Palacios states that it 
has acquired all easements and other land rights needed for the 
Expansion Project.

[[Page 73549]]

NEPA Process and the Environmental Document

    Any environmental document issued by the Commission will discuss 
impacts that could occur as a result of the construction and operation 
of the proposed project under the relevant general resource areas:
    <bullet> Geology and soils;
    <bullet> Water resources and wetlands;
    <bullet> Vegetation and wildlife;
    <bullet> Threatened and endangered species;
    <bullet> Cultural resources;
    <bullet> Land use;
    <bullet> Environmental justice
    <bullet> Air quality and noise; and
    <bullet> Reliability and safety.
    Commission staff will also evaluate reasonable alternatives to the 
proposed project or portions of the project and make recommendations on 
how to lessen or avoid impacts on the various resource areas. Your 
comments will help Commission staff identify and focus on the issues 
that might have an effect on the human environment and potentially 
eliminate others from further study and discussion in the environmental 
document.
    Following this scoping period, Commission staff will determine 
whether to prepare an Environmental Assessment (EA) or an Environmental 
Impact Statement (EIS). The EA or the EIS will present Commission 
staff's independent analysis of the issues. If Commission staff 
prepares an EA, a Notice of Schedule for the Preparation of an 
Environmental Assessment will be issued. The EA may be issued for an 
allotted public comment period. The Commission would consider timely 
comments on the EA before making its decision regarding the proposed 
project. If Commission staff prepares an EIS, a Notice of Intent to 
Prepare an EIS/Notice of Schedule will be issued, which will open up an 
additional comment period. Staff will then prepare a draft EIS which 
will be issued for public comment. Commission staff will consider all 
timely comments received during the comment period on the draft EIS and 
revise the document, as necessary, before issuing a final EIS. Any EA 
or draft and final EIS will be available in electronic format in the 
public record through eLibrary \3\ and the Commission's natural gas 
environmental documents web page (<a href="https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents">https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents</a>). If eSubscribed, you 
will receive instant email notification when the environmental document 
is issued.
---------------------------------------------------------------------------

    \3\ For instructions on connecting to eLibrary, refer to the 
last page of this notice.
---------------------------------------------------------------------------

    With this notice, the Commission is asking agencies with 
jurisdiction by law and/or special expertise with respect to the 
environmental issues of this project to formally cooperate in the 
preparation of the environmental document.\4\ Agencies that would like 
to request cooperating agency status should follow the instructions for 
filing comments provided under the Public Participation section of this 
notice.
---------------------------------------------------------------------------

    \4\ The Council on Environmental Quality regulations addressing 
cooperating agency responsibilities are at title 40, Code of Federal 
Regulations, section 1501.8.
---------------------------------------------------------------------------

Consultation Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, the Commission is using this notice to initiate 
consultation with the applicable State Historic Preservation Office(s), 
and to solicit their views and those of other government agencies, 
interested Indian tribes, and the public on the project's potential 
effects on historic properties.\5\ The environmental document for this 
project will document findings on the impacts on historic properties 
and summarize the status of consultations under section 106.
---------------------------------------------------------------------------

    \5\ The Advisory Council on Historic Preservation's regulations 
are at title 36, Code of Federal Regulations, part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Environmental Mailing List

    The environmental mailing list includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project and includes a mailing address with their 
comments. Commission staff will update the environmental mailing list 
as the analysis proceeds to ensure that Commission notices related to 
this environmental review are sent to all individuals, organizations, 
and government entities interested in and/or potentially affected by 
the proposed project.
    If you need to make changes to your name/address, or if you would 
like to remove your name from the mailing list, please complete one of 
the following steps:
    (1) Send an email to <a href="/cdn-cgi/l/email-protection#ecab8d9fbc9e8386898f98ad88889e899f9faf848d828b89ac8a899e8fc28b839a"><span class="__cf_email__" data-cfemail="4502243615372a2f20263104212137203636062d242b222005232037266b222a33">[email&#160;protected]</span></a> stating your 
request. You must include the docket number CP23-3-000 in your request. 
If you are requesting a change to your address, please be sure to 
include your name and the correct address. If you are requesting to 
delete your address from the mailing list, please include your name and 
address as it appeared on this notice. This email address is unable to 
accept comments. OR
    (2) Return the attached ``Mailing List Update Form'' (appendix 2).

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website at <a href="http://www.ferc.gov">www.ferc.gov</a> using the eLibrary link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number 
in the ``Docket Number'' field. Be sure you have selected an 
appropriate date range. For assistance, please contact FERC Online 
Support at <a href="/cdn-cgi/l/email-protection#65230017062a0b090c0b00361015150a171125030017064b020a13"><span class="__cf_email__" data-cfemail="9ed8fbecfdd1f0f2f7f0fbcdebeeeef1eceadef8fbecfdb0f9f1e8">[email&#160;protected]</span></a> or (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of all formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    Public sessions or site visits will be posted on the Commission's 
calendar located at <a href="https://www.ferc.gov/news-events/events">https://www.ferc.gov/news-events/events</a> along with 
other related information.

    Dated: November 23, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-26093 Filed 11-29-22; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on November 30, 2022.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.