Green Mountain Power Corporation; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
November 10, 2022
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 87 Issue 217 (Thursday, November 10, 2022)</title>
</head>
<body><pre>
[Federal Register Volume 87, Number 217 (Thursday, November 10, 2022)]
[Notices]
[Pages 67888-67889]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2022-24531]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2489-049]
Green Mountain Power Corporation; Notice of Application Tendered
for Filing With the Commission and Soliciting Additional Study Requests
and Establishing Procedural Schedule for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: P-2489-049.
c. Date filed: October 31, 2022.
d. Applicant: Green Mountain Power Corporation.
e. Name of Project: Cavendish Hydroelectric Project.
f. Location: On the Black River, in the town of Cavendish, in
Windsor County, Vermont. The project does not occupy any federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: John Greenan, Green Mountain Power
Corporation, 2152 Post Road, Rutland, VT 05701; Phone at (802) 770-
2195, or email at <a href="/cdn-cgi/l/email-protection#bff5d0d7d191f8cddadad1ded1ffd8cddadad1d2d0cad1cbded6d1cfd0c8dacd91dcd0d2"><span class="__cf_email__" data-cfemail="63290c0b0d4d241106060d020d23041106060d0e0c160d17020a0d130c1406114d000c0e">[email protected]</span></a>.
i. FERC Contact: Adam Peer at (202) 502-8449 or email at
<a href="/cdn-cgi/l/email-protection#afcecbcec281dfcacaddefc9caddcc81c8c0d9"><span class="__cf_email__" data-cfemail="dabbbebbb7f4aabfbfa89abcbfa8b9f4bdb5ac">[email protected]</span></a>.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
[[Page 67889]]
l. Deadline for filing additional study requests and requests for
cooperating agency status: December 30, 2022.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. For assistance, please contact FERC Online Support at
<a href="/cdn-cgi/l/email-protection#5a1c1f081915343633343f092f2a2a35282e1a3c3f2839743d352c"><span class="__cf_email__" data-cfemail="7e383b2c3d31101217101b2d0b0e0e110c0a3e181b0c1d50191108">[email protected]</span></a>, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. All filings must clearly identify the project name and
docket number on the first page: Cavendish Hydroelectric Project (P-
2489-049).
m. The application is not ready for environmental analysis at this
time.
n. The existing Cavendish Project consists of: (1) a 3,000 foot-
long, 10-acre impoundment with a gross storage capacity of 18.4-acre-
feet at a normal water surface elevation of 884.13 feet National
Geodetic Vertical Datum of 1929 (NGVD 29); (2) a 111-foot-long concrete
gravity dam that consists of: (a) a 90-foot-long by 25-foot-high north
spillway section topped with a 6-foot-high inflatable flashboard
system; and (b) a 21-foot-long by 6-foot-high south spillway section
topped with 2.5-foot-high steel flashboards; (3) an 18-inch wide
downstream fish passage chute located on the north side of the
spillway; (4) a concrete intake structure equipped with a mechanically
operated headgate, and a trash rack with 2-inch clear bar spacing; (5)
a 178-foot-long concrete and rock tunnel that carries flows from the
intake to a penstock; (6) a 6-foot-diameter, 1,090-foot-long steel
penstock; (7) a 64-foot-long by 34-foot-wide powerhouse containing
three turbine-generator units with a combined capacity of 1.44
megawatts; (8) a 100-foot-long transmission line that runs from the
powerhouse to a substation within the project boundary; and (9)
appurtenant facilities. The project creates a 1,570-foot-long bypassed
reach of the Black River.
The current license requires Green Mountain Power Corporation to:
(1) operate the project in run-of-river mode; (2) maintain the
impoundment water level no lower than 6 inches below the crest of the
flashboards; (3) release a continuous minimum flow of 10 cubic feet per
second (cfs) to the bypassed reach; and (4) release downstream flows of
at least 42 cfs from June 1 to September 30, at least 83 cfs from
October 1 to March 31, and at least 332 cfs from April 1 to May 31 when
refilling the impoundment after project maintenance or flashboard
installation. If inflows are insufficient to meet the downstream flows
during impoundment refill, Green Mountain Power Corporation is required
to release 90 percent of instantaneous inflow through the turbines. The
project generates about 4,864 megawatt-hours annually.
Green Mountain Power Corporation proposes to: (1) continue
operating the project in run-of-river mode; (2) maintain a stable
impoundment water level at the top of the flashboard crest; (3)
continue releasing a continuous minimum flow of 10 cfs to the bypassed
reach; and (4) release 90 percent of instantaneous inflow through the
turbines at all times when refilling the impoundment. Green Mountain
Power Corporation also proposes to modify the penstock geometry and
replace the three existing turbines.
o. In addition to publishing the full text of this notice in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this notice, as well
as other documents in the proceeding (e.g., license application) via
the internet through the Commission's Home Page (<a href="http://www.ferc.gov">http://www.ferc.gov</a>)
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document (P-
2489). For assistance, contact FERC at <a href="/cdn-cgi/l/email-protection#7d3b382f3e3213111413182e080d0d120f093d1b180f1e531a120b"><span class="__cf_email__" data-cfemail="aaeceff8e9e5c4c6c3c4cff9dfdadac5d8deeacccfd8c984cdc5dc">[email protected]</span></a> or
call toll-free, (866) 208-3676 or (202) 502-8659 (TTY).
You may also register online at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a> to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary schedule. Revisions
to the schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)--January 2022
Request Additional Information--January 2022
Issue Acceptance Letter--May 2022
Issue Scoping Document 1 for comments--May 2023
Issue Scoping Document 2 (if necessary)--July 2023
Issue Notice of Ready for Environmental Analysis--July 2023
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: November 4, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-24531 Filed 11-9-22; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on November 10, 2022.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.