Notice2022-24275

Eagle Creek Racine Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
November 8, 2022

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 87 Issue 215 (Tuesday, November 8, 2022)</title>
</head>
<body><pre>
[Federal Register Volume 87, Number 215 (Tuesday, November 8, 2022)]
[Notices]
[Pages 67473-67474]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2022-24275]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2570-034]


Eagle Creek Racine Hydro, LLC; Notice of Application Accepted for 
Filing, Soliciting Motions To Intervene and Protests, Ready for 
Environmental Analysis, and Soliciting Comments, Recommendations, 
Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2570-034.
    c. Date filed: November 30, 2021.
    d. Applicant: Eagle Creek Racine Hydro, LLC (Eagle Creek).
    e. Name of Project: Racine Hydroelectric Project (Racine Project).
    f. Location: The Racine Project is located at the U.S. Army Corps 
of Engineers' (Corps) Racine Locks and Dam on the Ohio River near the 
Town of Racine in Meigs County, Ohio. The project occupies 27.99 acres 
of federal land administered by the Corps.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Joyce Foster, Director, Licensing and 
Compliance; <a href="/cdn-cgi/l/email-protection#3c5653455f59125a534f48594e7c595d5b50595f4e5959574e59125f5351"><span class="__cf_email__" data-cfemail="3a505543595f145c55494e5f487a5f5b5d565f59485f5f51485f14595557">[email&#160;protected]</span></a> or (804) 338-5110.
    i. FERC Contact: Jay Summers at <a href="/cdn-cgi/l/email-protection#b1dbd0c89fc2c4dcdcd4c3c2f1d7d4c3d29fd6dec7"><span class="__cf_email__" data-cfemail="8ce6edf5a2fff9e1e1e9feffcceae9feefa2ebe3fa">[email&#160;protected]</span></a> or (202) 502-
8764.
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions: 60 days from the issuance date of this 
notice; reply comments are due 105 days from the issuance date of this 
notice.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, recommendations, preliminary 
terms and conditions, and preliminary fishway prescriptions using the 
Commission's eFiling system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
<a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
<a href="/cdn-cgi/l/email-protection#b3f5f6e1f0fcdddfdaddd6e0c6c3c3dcc1c7f3d5d6c1d09dd4dcc5"><span class="__cf_email__" data-cfemail="b1f7f4e3f2fedfddd8dfd4e2c4c1c1dec3c5f1d7d4c3d29fd6dec7">[email&#160;protected]</span></a>, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper 
request. Submissions sent via the U.S. Postal Service must be addressed 
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent 
via any other carrier must be addressed to: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, 
Rockville, Maryland 20852. The first page of any filing should include 
docket number P-2570-034.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    The Council on Environmental Quality (CEQ) issued a final rule on 
April 20, 2022, revising the regulations under 40 CFR parts 1502, 1507, 
and 1508 that federal agencies use to implement the National 
Environmental Policy Act (NEPA) (see National Environmental Policy Act 
Implementing Regulations Revisions, 87 FR 23,453-70). The final rule 
became effective on May 20, 2022. Commission staff intends to conduct 
its NEPA review in accordance with CEQ's new regulations.
    l. The Racine Project would use the Corps' existing Racine Locks 
and Dam and consist of the following existing facilities: (1) four 
21.75-foot-wide by 60-foot-high intake openings equipped with steel 
trashracks having a clear bar spacing of 5.5 inches; (2) a reinforced 
concrete powerhouse located on the east end of the dam containing two 
horizontal bulb generating units with a combined capacity of 47.5 
megawatts; (3) a 155-foot-long, non-overflow section of sheet pile 
cells located between the powerhouse and the right abutment; (4) a 
stand-alone functional replacement dam located upstream of the sheet 
pile cells that consists of a drilled shaft supported concrete dam with 
a drilled secant pile seepage control; (5) a 834-foot-long, 69-kilovolt 
transmission line; and (6) appurtenant facilities.
    The Racine Project is currently operated in a run-of-release mode 
using surplus water from the Corps' Racine Locks and Dam, as directed 
by the Corps, and has an estimated average annual energy production of 
90,364 megawatt-hours. Eagle Creek does not propose any new 
construction and proposes to continue operating the project in a run-
of-release mode.
    m. A copy of the application can be viewed on the Commission's 
website at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. At this time, the Commission has 
suspended access to the Commission's Public Reference Room, due to the 
proclamation declaring a National Emergency concerning the Novel 
Coronavirus Disease (COVID-19), issued by the President on March 13, 
2020. For assistance, contact FERC at FERCOnllineSupport@ferc or call 
toll-free, (886) 208-3676 or TTY, (202) 502-8659.
    You may also register online at <a href="http://www.ferc.gov/docs-filing/esubscription.asp">http://www.ferc.gov/docs-filing/esubscription.asp</a> to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, .211, and .214. In determining the appropriate action 
to take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received

[[Page 67474]]

on or before the specified comment date for the particular application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,'' 
``RECOMMENDATIONS,'' ``PRELIMINARY TERMS AND CONDITIONS,'' or 
``PRELIMINARY FISHWAY PRESCRIPTIONS;'' (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, recommendations, terms and conditions or prescriptions must 
set forth their evidentiary basis and otherwise comply with the 
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the 
application directly from the applicant. A copy of any protest or 
motion to intervene must be served upon each representative of the 
applicant specified in the particular application. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.
    o. The license applicant must file no later than 60 days following 
the date of issuance of this notice: (1) a copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification. Please note 
that the certification request must comply with 40 CFR 121.5(b), 
including documentation that a pre-filing meeting request was submitted 
to the certifying authority at least 30 days prior to submitting the 
certification request. Please note that the certification request must 
be sent to the certifying authority and to the Commission concurrently.
    p. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of this notice.
    q. Procedural schedule: The application will be processed according 
to the following schedule. Revisions to the schedule will be made as 
appropriate.

------------------------------------------------------------------------
                  Milestone                           Target date
------------------------------------------------------------------------
Deadline for Filing Protest, Motion to        December 2022.
 Intervene, Comments, Recommendations,
 Preliminary Terms and Conditions, and
 Preliminary Fishway Prescriptions.
Deadline for Filing Reply Comments..........  February 2023.
------------------------------------------------------------------------


    Dated: November 1, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-24275 Filed 11-7-22; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on November 8, 2022.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.