Notice2022-22770

Eugene Water & Electric Board; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
October 20, 2022

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 87 Issue 202 (Thursday, October 20, 2022)</title>
</head>
<body><pre>
[Federal Register Volume 87, Number 202 (Thursday, October 20, 2022)]
[Notices]
[Pages 63767-63768]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2022-22770]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2496-286]


Eugene Water & Electric Board; Notice of Application Accepted for 
Filing and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Non-capacity Amendment of License.
    b. Project No: 2496-286.
    c. Date Filed: October 6, 2022 \1\
---------------------------------------------------------------------------

    \1\ The October 6, 2022 filing supersedes a September 1, 2022 
filing.
---------------------------------------------------------------------------

    d. Applicant: Eugene Water & Electric Board (licensee).
    e. Name of Project: Leaburg-Walterville Hydroelectric Project.
    f. Location: The project is located on the McKenzie River in Lane 
County, Oregon.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Mr. Frank Lawson, Eugene Water & Electric 
Board, 4200 Roosevelt Blvd., Eugene, Oregon 97402, (541) 685-7000, 
<a href="/cdn-cgi/l/email-protection#482e3a2926236624293f3b2726082d3f2d2a66273a2f"><span class="__cf_email__" data-cfemail="e98f9b888782c785889e9a8687a98c9e8c8bc7869b8e">[email&#160;protected]</span></a>.
    i. FERC Contact: Jeremy Jessup, (202) 502-6779, 
<a href="/cdn-cgi/l/email-protection#4c06293e2921356206293f3f393c0c2a293e2f622b233a"><span class="__cf_email__" data-cfemail="511b3423343c287f1b342222242111373423327f363e27">[email&#160;protected]</span></a>.
    j. Deadline for filing comments, motions to intervene, and 
protests: November 14, 2022.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at <a href="http://www.ferc.gov/docs-filing/efiling.asp">http://www.ferc.gov/docs-filing/efiling.asp</a>. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at <a href="http://www.ferc.gov/docs-filing/ecomment.asp">http://www.ferc.gov/docs-filing/ecomment.asp</a>. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at <a href="/cdn-cgi/l/email-protection#0e484b5c4d41606267606b5d7b7e7e617c7a4e686b7c6d20696178"><span class="__cf_email__" data-cfemail="d0969582939fbebcb9beb583a5a0a0bfa2a490b6b5a2b3feb7bfa6">[email&#160;protected]</span></a>, (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may 
submit a paper copy. Submissions sent via the U.S. Postal Service must 
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852. The first page of any filing should 
include the docket number P-2496-286. Comments emailed to Commission 
staff are not considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: The licensee proposes to remove from the 
project boundary two 7.6-mile-long, 69-kilovolt (kV) transmission lines 
which no longer qualify as primary transmission lines. These lines, 
referred to as the A-2 and B-2, formerly connected the Leaburg 
Substation with the Walterville Substation and then to load centers and 
the interconnected transmission system at the Hayden Bridge Substation. 
The A-2 and B-2 transmission lines have been taken out of service and 
the licensee is removing them. The licensee installed a new 11.5-kV 
generation feed line between the Leaburg power plant and the new Holden 
Creek Substation in the easternmost 0.43 mile of the right-of-way 
previously occupied by the two 69-kV transmission lines. The Leaburg 
plant's power generation is now delivered to the interconnected 
transmission system at the Holden Creek Substation, which is connected 
to

[[Page 63768]]

the Bonneville Power Administration. The proposed amendment would 
reduce the project transmission line right-of-way by 117.08 acres; from 
180.86 to 63.78 acres.
    l. Locations of the Application: This filing may be viewed on the 
Commission's website at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at <a href="http://www.ferc.gov/docs-filing/esubscription.asp">http://www.ferc.gov/docs-filing/esubscription.asp</a> to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
<a href="/cdn-cgi/l/email-protection#3a7c7f687975545653545f694f4a4a55484e7a5c5f4859145d554c"><span class="__cf_email__" data-cfemail="6b2d2e392824050702050e381e1b1b04191f2b0d0e1908450c041d">[email&#160;protected]</span></a>, for TTY, call (202) 502-8659. Agencies may 
obtain copies of the application directly from the applicant.
    m. Location of the Orders Issuing New License: This order may be 
viewed on the Commission's website at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. You may also 
register online at <a href="http://www.ferc.gov/docs-filing/esubscription.asp">http://www.ferc.gov/docs-filing/esubscription.asp</a> to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
<a href="/cdn-cgi/l/email-protection#7f393a2d3c30111316111a2c0a0f0f100d0b3f191a0d1c51181009"><span class="__cf_email__" data-cfemail="9cdad9cedfd3f2f0f5f2f9cfe9ececf3eee8dcfaf9eeffb2fbf3ea">[email&#160;protected]</span></a>, for TTY, call (202) 502-8659. Agencies may 
obtain copies of the application directly from the applicant.
    n. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    o. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    p. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: October 13, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-22770 Filed 10-19-22; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on October 20, 2022.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.