Airworthiness Directives; BAE Systems (Operations) Limited Airplanes
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
The FAA proposes to supersede Airworthiness Directives (ADs) 2005-15-11, 2016-07-09, and 2018-19-24, which apply to all BAE Systems (Operations) Limited Model 4101 airplanes. AD 2005-15-11 requires repetitive detailed and specialized inspections to detect fatigue damage in the fuselage, replacement of certain bolt assemblies, and corrective actions if necessary. AD 2016-07-09 requires a revision of the maintenance or inspection program, as applicable. AD 2018-19-24 requires a one-time detailed inspection of a certain fuselage frame and repair, if necessary, and a revision of the maintenance or inspection program, as applicable, to incorporate new or revised maintenance instructions and airworthiness limitations. Since the FAA issued those ADs, the FAA has determined that new or more restrictive airworthiness limitations are necessary. This proposed AD would continue to require the actions in AD 2016-07-09 and 2018-19-24 and require revising the existing maintenance or inspection program, as applicable, to incorporate new or more restrictive airworthiness limitations. The FAA is proposing this AD to address the unsafe condition on these products.
Full Text
<html>
<head>
<title>Federal Register, Volume 87 Issue 203 (Friday, October 21, 2022)</title>
</head>
<body><pre>
[Federal Register Volume 87, Number 203 (Friday, October 21, 2022)]
[Proposed Rules]
[Pages 63973-63978]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2022-22202]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2022-1298; Project Identifier MCAI-2022-00437-T]
RIN 2120-AA64
Airworthiness Directives; BAE Systems (Operations) Limited
Airplanes
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Notice of proposed rulemaking (NPRM).
-----------------------------------------------------------------------
SUMMARY: The FAA proposes to supersede Airworthiness Directives (ADs)
2005-15-11, 2016-07-09, and 2018-19-24, which apply to all BAE Systems
(Operations) Limited Model 4101 airplanes. AD 2005-15-11 requires
repetitive detailed and specialized inspections to detect fatigue
damage in the fuselage, replacement of certain bolt assemblies, and
corrective actions if necessary. AD 2016-07-09 requires a
[[Page 63974]]
revision of the maintenance or inspection program, as applicable. AD
2018-19-24 requires a one-time detailed inspection of a certain
fuselage frame and repair, if necessary, and a revision of the
maintenance or inspection program, as applicable, to incorporate new or
revised maintenance instructions and airworthiness limitations. Since
the FAA issued those ADs, the FAA has determined that new or more
restrictive airworthiness limitations are necessary. This proposed AD
would continue to require the actions in AD 2016-07-09 and 2018-19-24
and require revising the existing maintenance or inspection program, as
applicable, to incorporate new or more restrictive airworthiness
limitations. The FAA is proposing this AD to address the unsafe
condition on these products.
DATES: The FAA must receive comments on this NPRM by December 5, 2022.
ADDRESSES: You may send comments, using the procedures found in 14 CFR
11.43 and 11.45, by any of the following methods:
<bullet> Federal eRulemaking Portal: Go to <a href="http://regulations.gov">regulations.gov</a>. Follow
the instructions for submitting comments.
<bullet> Fax: 202-493-2251.
<bullet> Mail: U.S. Department of Transportation, Docket
Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New
Jersey Avenue SE, Washington, DC 20590.
<bullet> Hand Delivery: Deliver to Mail address above between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
AD Docket: You may examine the AD docket at <a href="http://regulations.gov">regulations.gov</a> under
Docket No. FAA-2022-1298; or in person at Docket Operations between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays. The AD
docket contains this NPRM, the mandatory continuing airworthiness
information (MCAI), any comments received, and other information. The
street address for Docket Operations is listed above.
Material Incorporated by Reference:
<bullet> For service information identified in this NPRM, contact
BAE Systems (Operations) Limited, Customer Information Department,
Prestwick International Airport, Ayrshire, KA9 2RW, Scotland, United
Kingdom; telephone +44 1292 675207; fax +44 1292 675704; email
<a href="/cdn-cgi/l/email-protection#c49685b4b1a6a8ada7a5b0adabaab784a6a5a1b7bdb7b0a1a9b7eaa7aba9"><span class="__cf_email__" data-cfemail="6c3e2d1c190e00050f0d180503021f2c0e0d091f151f1809011f420f0301">[email protected]</span></a>; website <a href="http://baesystems.com/Businesses/RegionalAircraft/index.htm">baesystems.com/Businesses/RegionalAircraft/index.htm</a>.
<bullet> You may view this service information at the FAA,
Airworthiness Products Section, Operational Safety Branch, 2200 South
216th St., Des Moines, WA. For information on the availability of this
material at the FAA, call 206-231-3195.
FOR FURTHER INFORMATION CONTACT: Todd Thompson, Aerospace Engineer,
Large Aircraft Section, FAA, International Validation Branch, 2200
South 216th St., Des Moines, WA 98198; telephone 206-231-3228; email
<a href="/cdn-cgi/l/email-protection#c0b4afa4a4eeb4a8afadb0b3afae80a6a1a1eea7afb6"><span class="__cf_email__" data-cfemail="9ce8f3f8f8b2e8f4f3f1eceff3f2dcfafdfdb2fbf3ea">[email protected]</span></a>.
SUPPLEMENTARY INFORMATION:
Comments Invited
The FAA invites you to send any written relevant data, views, or
arguments about this proposal. Send your comments to an address listed
under ADDRESSES. Include ``Docket No. FAA-2022-1298; Project Identifier
MCAI-2022-00437-T'' at the beginning of your comments. The most helpful
comments reference a specific portion of the proposal, explain the
reason for any recommended change, and include supporting data. The FAA
will consider all comments received by the closing date and may amend
the proposal because of those comments.
Except for Confidential Business Information (CBI) as described in
the following paragraph, and other information as described in 14 CFR
11.35, the FAA will post all comments received, without change, to
<a href="http://regulations.gov">regulations.gov</a>, including any personal information you provide. The
agency will also post a report summarizing each substantive verbal
contact received about this NPRM.
Confidential Business Information
CBI is commercial or financial information that is both customarily
and actually treated as private by its owner. Under the Freedom of
Information Act (FOIA) (5 U.S.C. 552), CBI is exempt from public
disclosure. If your comments responsive to this NPRM contain commercial
or financial information that is customarily treated as private, that
you actually treat as private, and that is relevant or responsive to
this NPRM, it is important that you clearly designate the submitted
comments as CBI. Please mark each page of your submission containing
CBI as ``PROPIN.'' The FAA will treat such marked submissions as
confidential under the FOIA, and they will not be placed in the public
docket of this NPRM. Submissions containing CBI should be sent to Todd
Thompson, Aerospace Engineer, Large Aircraft Section, FAA,
International Validation Branch, 2200 South 216th St., Des Moines, WA
98198; telephone 206-231-3228; email <a href="/cdn-cgi/l/email-protection#5d2932393973293532302d2e32331d3b3c3c733a322b"><span class="__cf_email__" data-cfemail="6f1b000b0b411b0700021f1c00012f090e0e41080019">[email protected]</span></a>. Any
commentary that the FAA receives that is not specifically designated as
CBI will be placed in the public docket for this rulemaking.
Background
The FAA issued AD 2005-15-11, Amendment 39-14200 (70 FR 43025, July
26, 2005) (AD 2005-15-11) for all BAE Systems (Operations) Limited
Model 4101 airplanes. AD 2005-15-11 was prompted by MCAI originated by
the Civil Aviation Authority (CAA), which is the aviation authority for
the United Kingdom (U.K.) (U.K. CAA). The U.K. CAA issued AD 2005-15-11
to correct an unsafe condition identified by a review of primary
airframe fatigue test results and a Maintenance Steering Group 3 (MSG-
3) analysis, which found a need to issue an AD to detect and correct
fatigue damage of the fuselage, door, engine nacelle, empennage, and
wing structures, which could result in reduced structural integrity of
the airplane.
AD 2005-15-11 requires repetitive detailed and specialized
inspections to detect fatigue damage in the fuselage, replacement of
certain bolt assemblies, and corrective actions if necessary. The FAA
issued AD 2005-15-11 to address fatigue damage of the fuselage, door,
engine nacelle, empennage, and wing structures, which could result in
reduced structural integrity of the airplane.
The FAA issued AD 2016-07-09, Amendment 39-18454 (81 FR 21263,
April 11, 2016) (AD 2016-07-09), for all BAE Systems (Operations)
Limited Model 4101 airplanes. AD 2016-07-09 was prompted by MCAI
originated by the European Aviation Safety Agency (EASA), which is the
Technical Agent for the Member States of the European Union. EASA
issued AD 2014-0043, dated February 21, 2014 (EASA AD 2014-0043), to
correct an unsafe condition identified as failure of certain
structurally significant items, including the main landing gear and
nose landing gear, and fuel vapor ignition sources.
AD 2016-07-09 requires a revision of the maintenance or inspection
program. The FAA issued AD 2016-07-09 to address failure of certain
structurally significant items, including the main landing gear and
nose landing gear, which could result in reduced structural integrity
of the airplane; and to prevent fuel vapor ignition sources, which
could result in a fuel tank explosion and consequent loss of the
airplane.
The FAA issued AD 2018-19-24, Amendment 39-19425 (83 FR 49786,
October 3, 2018) (AD 2018-19-24), for all BAE Systems (Operations)
Limited Model 4101 airplanes. AD 2018-19-24 was prompted by MCAI
originated by
[[Page 63975]]
EASA. EASA issued AD 2017-0187, September 22, 2017 (EASA AD 2017-0187),
to correct an unsafe condition identified as cracking in fuselage frame
90 and fatigue damage of various airplane structures.
AD 2018-19-24 requires a one-time detailed inspection of a certain
fuselage frame and repair, if necessary, and a revision of the
maintenance or inspection program, as applicable, to incorporate new or
revised maintenance instructions and airworthiness limitations. The FAA
issued AD 2018-19-24 to address cracking in fuselage frame 90, which
could cause it to fail and thereby compromise the structural integrity
of the aircraft pressure hull. The FAA also issued AD 2018-19-24 to
address fatigue damage of various airplane structures, which could
result in reduced structural integrity of the airplane. AD 2018-19-24
specifies that accomplishing the revision required by that AD
terminates all requirements of AD 2005-15-11.
Actions Since ADs 2015-15-11, 2016-07-09, and 2018-19-24 Were Issued
Since the FAA issued ADs 2015-15-11, 2016-07-09, and 2018-19-24,
the U.K. CAA superseded EASA ADs 2014-0043 and 2017-0187, and issued
U.K. CAA AD G-2022-0006, dated March 30, 2022 (U.K. CAA AD G-2022-0006;
also referred to as the MCAI). U.K. CAA AD G-2022-0006 states that the
repetitive inspection requirements for Structural Significant Items
(SSI) 53-10-029 were not addressed in EASA AD 2017-0187, and additional
SSI inspections are necessary (inspections for cracking of Hi-Shear
(now LISL)) collars. U.K. CAA AD G-2022-0006 also states that failure
to comply with new or more restrictive actions could result in an
unsafe condition. The FAA is issuing this AD to address fatigue damage
of various airplane structures and failure of certain structurally
significant items, which could result in reduced structural integrity
of the airplane. The FAA is also issuing this AD to address fuel vapor
ignition sources, which could result in a fuel tank explosion and
consequent loss of the airplane. You may examine U.K. CAA AD G-2022-
0006 in the AD docket at <a href="http://regulations.gov">regulations.gov</a> under Docket No. FAA-2022-
1298.
Related Service Information Under 1 CFR Part 51
The FAA reviewed Chapter 05 of BAE Systems (Operations) Limited
J41Aircraft Maintenance Manual (AMM), Revision 44, dated June 15, 2021,
for effectivity group 403; and BAE Systems (Operations) Limited J41
AMM, Revision 44, dated June 15, 2021, for effectivity group 408. This
service information specifies airworthiness limitations for fuel tank
systems and certification maintenance requirements. These documents are
distinct since they apply to different airplanes.
This proposed AD would also require:
<bullet> Subjects 05-10-10, ``Airworthiness Limitations''; 05-10-
20, ``Certification Maintenance Requirements''; and 05-10-30,
``Critical Design Configuration Control Limitations (CDCCL)--Fuel
System''; of Chapter 05, ``Airworthiness Limitations,'' of the BAE
Systems (Operations) Limited J41 AMM, Revision 38, dated September 15,
2013, which the Director of the Federal Register approved for
incorporation by reference as of May 16, 2016 (81 FR 21263, April 11,
2016);
<bullet> BAE Systems (Operations) Limited Service Bulletin J41-51-
001, Revision 4, dated July 11, 2017, which the Director of the Federal
Register approved for incorporation by reference as of November 7, 2018
(83 FR 49786, October 3, 2018); and
<bullet> BAE Systems (Operations) Limited Alert Service Bulletin
J41-A53-058, dated December 6, 2016, which the Director of the Federal
Register approved for incorporation by reference as of November 7, 2018
(83 FR 49786, October 3, 2018).
This service information is reasonably available because the
interested parties have access to it through their normal course of
business or by the means identified in the ADDRESSES section.
FAA's Determination
This product has been approved by the aviation authority of another
country, and is approved for operation in the United States. Pursuant
to the FAA's bilateral agreement with the State of Design Authority, it
has notified the FAA of the unsafe condition described in the MCAI and
service information described above. The FAA is issuing this NPRM after
determining that the unsafe condition described previously is likely to
exist or develop on other products of the same type design.
Proposed Requirements of This NPRM
This proposed AD would retain none of the requirements of AD 2005-
15-11; certain requirements of AD 2016-07-09; and all requirements of
AD 2018-19-24. This proposed AD would require revising the existing
maintenance or inspection program, as applicable, to incorporate new or
more restrictive airworthiness limitations.
This proposed AD would require revisions to certain operator
maintenance documents to include new actions (e.g., inspections) and
Critical Design Configuration Control Limitations (CDCCLs). Compliance
with these actions and CDCCLs is required by 14 CFR 91.403(c). For
airplanes that have been previously modified, altered, or repaired in
the areas addressed by this proposed AD, the operator may not be able
to accomplish the actions described in the revisions. In this
situation, to comply with 14 CFR 91.403(c), the operator must request
approval for an alternative method of compliance according to paragraph
(o)(1) of this proposed AD.
Costs of Compliance
The FAA estimates that this AD, if adopted as proposed, would
affect 10 airplanes of U.S. registry. The FAA estimates the following
costs to comply with this proposed AD:
The FAA estimates the total cost per operator for the retained
actions from AD 2016-07-09 to be $7,650 (90 work-hours x $85 per work-
hour).
The FAA estimates the total cost per operator for the retained
maintenance or inspection program revision from AD 2018-19-24 to be
$7,650 (90 work-hours x $85 per work-hour)
The FAA has determined that revising the maintenance or inspection
program takes an average of 90 work-hours per operator, although the
agency recognizes that this number may vary from operator to operator.
Since operators incorporate maintenance or inspection program changes
for their affected fleet(s), the FAA has determined that a per-operator
estimate is more accurate than a per-airplane estimate. Therefore, the
agency estimates the average total cost per operator to be $7,650 (90
work-hours x $85 per work-hour).
The FAA estimates the total cost per operator for the new proposed
actions to be $7,650 (90 work-hours x $85 per work-hour).
[[Page 63976]]
Estimated Costs for Required Actions
----------------------------------------------------------------------------------------------------------------
Cost per Cost on U.S.
Action Labor cost Parts cost product operators
----------------------------------------------------------------------------------------------------------------
Inspection (Retained actions from AD 2 work-hours x $85 per $0 $170 $1,700
2018-19-24). hour = $170.
----------------------------------------------------------------------------------------------------------------
The FAA has received no definitive data on which to base the cost
estimates for the on-condition actions specified in this AD.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. Subtitle VII: Aviation Programs,
describes in more detail the scope of the Agency's authority.
The FAA is issuing this rulemaking under the authority described in
Subtitle VII, Part A, Subpart III, Section 44701: General requirements.
Under that section, Congress charges the FAA with promoting safe flight
of civil aircraft in air commerce by prescribing regulations for
practices, methods, and procedures the Administrator finds necessary
for safety in air commerce. This regulation is within the scope of that
authority because it addresses an unsafe condition that is likely to
exist or develop on products identified in this rulemaking action.
Regulatory Findings
The FAA determined that this proposed AD would not have federalism
implications under Executive Order 13132. This proposed AD would not
have a substantial direct effect on the States, on the relationship
between the national Government and the States, or on the distribution
of power and responsibilities among the various levels of government.
For the reasons discussed above, I certify this proposed
regulation:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866,
(2) Would not affect intrastate aviation in Alaska, and
(3) Would not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
The Proposed Amendment
Accordingly, under the authority delegated to me by the
Administrator, the FAA proposes to amend 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by:
0
a. Removing Airworthiness Directive AD 2005-15-11, Amendment 39-14200
(70 FR 43025, July 26, 2005); AD 2016-07-09, Amendment 39-18454 (81 FR
21263, April 11, 2016); and AD 2018-19-24, Amendment 39-19425 (83 FR
49786, October 3, 2018); and
0
b. Adding the following new airworthiness directive:
BAE Systems (Operations) Limited: Docket No. FAA-2022-1298; Project
Identifier MCAI-2022-00437-T.
(a) Comments Due Date
The FAA must receive comments on this airworthiness directive
(AD) by December 5, 2022.
(b) Affected ADs
(1) This AD replaces AD 2005-15-11, Amendment 39-14200 (70 FR
43025, July 26, 2005) (AD 2005-15-11).
(2) This AD replaces AD 2016-07-09, Amendment 39-18454 (81 FR
21263, April 11, 2016) (AD 2016-07-09).
(3) This AD replaces AD 2018-19-24, Amendment 39-19425 (83 FR
49786, October 3, 2018) (AD 2018-19-24).
(c) Applicability
This AD applies to all BAE Systems (Operations) Limited Model
4101 airplanes, certificated in any category.
(d) Subject
Air Transport Association (ATA) of America Code 05, Time Limits/
Maintenance Checks.
(e) Reason
This AD was prompted by a determination that new or more
restrictive airworthiness limitations are necessary. The FAA is
issuing this AD to address fatigue damage of various airplane
structures and failure of certain structurally significant items,
which could result in reduced structural integrity of the airplane.
The FAA is also issuing this AD to address fuel vapor ignition
sources, which could result in a fuel tank explosion and consequent
loss of the airplane.
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
(g) Retained Revision of the Maintenance or Inspection Program (From AD
2016-07-09), With No Changes
This paragraph restates the requirements of paragraph (i) of AD
2016-07-09, with no changes. Within 90 days after May 16, 2016 (the
effective date of AD 2016-07-09): Revise the maintenance or
inspection program, as applicable, by incorporating Subjects 05-10-
10, ``Airworthiness Limitations''; 05-10-20, ``Certification
Maintenance Requirements''; and 05-10-30, ``Critical Design
Configuration Control Limitations (CDCCL)--Fuel System''; of Chapter
05, ``Airworthiness Limitations,'' of the BAE Systems (Operations)
Limited J41 AMM, Revision 38, dated September 15, 2013. The initial
compliance times for the tasks are at the applicable times specified
in paragraphs (g)(1) through (3) of this AD. Accomplishing the
revision of the existing maintenance or inspection program required
by paragraph (m) of this AD terminates the requirements of this
paragraph.
(1) For replacement tasks of life limited parts specified in
Subject 05-10-10, ``Airworthiness Limitations,'' of Chapter 05,
``Airworthiness Limitations,'' of the BAE Systems (Operations)
Limited J41 AMM, Revision 38, dated September 15, 2013: Prior to the
applicable flight cycles (landings) or flight hours (flying hours)
on the part specified in the ``Mandatory Life Limits'' column in
Subject 05-10-10, or within 90 days after May 16, 2016 (the
effective date of AD 2016-07-09), whichever occurs later.
(2) For structurally significant item tasks specified in Subject
05-10-10, ``Airworthiness Limitations,'' of Chapter 05,
``Airworthiness Limitations,'' of the BAE Systems (Operations)
Limited J41 AMM, Revision 38, dated September 15, 2013: Prior to the
accumulation of the applicable flight cycles specified in the
``Initial Inspection'' column in Subject 05-10-10, or within 90 days
after May 16, 2016 (the effective date of AD 2016-07-09), whichever
occurs later.
(3) For certification maintenance requirements tasks specified
in Subject 05-10-20, ``Certification Maintenance Requirements,'' of
Chapter 05, ``Airworthiness Limitations,'' of the BAE Systems
(Operations) Limited J41 AMM, Revision 38, dated September 15, 2013:
Prior to the accumulation of the applicable flight hours specified
in the ``Time Between Checks'' column in Subject 05-10-20, or within
90 days after May 16, 2016 (the effective date of AD 2016-07-09),
whichever occurs later; except for tasks that specify ``first flight
of the day'' in the ``Time Between Checks'' column in Subject 05-10-
20, the
[[Page 63977]]
initial compliance time is the first flight of the next day after
doing the revision required by paragraph (g) of AD 2016-07-09, or
within 90 days after May 16, 2016, whichever occurs later.
(h) Retained Restrictions on Alternative Actions, Intervals, and/or
(CDCCLs), With No Changes
This paragraph restates the requirements of paragraph (j) of AD
2016-07-09, with no changes. Except as required by paragraph (m) of
this AD, after the maintenance or inspection program, as applicable,
has been revised as required by paragraph (g) of this AD, no
alternative actions (e.g., inspections), intervals, and/or CDCCLs
may be used unless the actions, intervals, and/or CDCCLs are
approved as an alternative method of compliance (AMOC) in accordance
with the procedures specified in paragraph (o)(1) of this AD.
(i) Retained Inspection, With No Changes
This paragraph restates the requirements of paragraph (g) of AD
2018-19-24, with no changes. At the compliance times specified in
paragraphs (i)(1) and (2) of this AD, as applicable: Do a detailed
inspection of fuselage frame 90 for cracking or fatigue damage, in
accordance with the Accomplishment Instructions of BAE Systems
(Operations) Limited Alert Service Bulletin J41-A53-058, dated
December 6, 2016. If any cracking or fatigue damage is found: Before
further flight, repair using a method approved by the Manager,
International Section, Transport Standards Branch, FAA; or the
European Aviation Safety Agency (EASA); or BAE Systems (Operations)
Limited's EASA Design Organization Approval (DOA). Accomplishing the
revision of the existing maintenance or inspection program required
by paragraph (m) of this AD terminates the requirements of this
paragraph.
(1) For airplanes with 6,300 flight cycles or fewer since
Structural Significant Items (SSI) 53-10-029 (Maintenance Planning
Document (MPD) 531029-DVl-10010-1) was last accomplished: Within
6,600 flight cycles after the last accomplishment of SSI 53-10-029
(MPD 531029-DVl-10010-1), or within 6 months after November 7, 2018
(the effective date of AD 2018-19-24), whichever is later.
(2) For airplanes with more than 6,300 flight cycles since SSI
53-10-029 (MPD 531029-DVl-10010-1) was last accomplished: Within 300
flight cycles or 4.5 months, whichever is earlier, since the last
accomplishment of SSI 53-10-029 (MPD 531029-DVl-10010-1), or within
6 months after November 7, 2018 (the effective date of AD 2018-19-
24), whichever is later.
(j) Retained Revision of Maintenance or Inspection Program (From AD
2018-19-24), With No Changes
This paragraph restates the requirements of paragraph (h) of AD
2018-19-24, with no changes. Within 90 days after November 7, 2018
(the effective date of AD 2018-19-24): Revise the maintenance or
inspection program, as applicable, by incorporating the maintenance
tasks and associated thresholds and intervals described in, and in
accordance with, the Accomplishment Instructions of BAE Systems
(Operations) Limited Service Bulletin J41-51-001, Revision 4, dated
July 11, 2017. The initial compliance times for new or revised tasks
are at the applicable times specified in BAE Systems (Operations)
Limited Service Bulletin J41-51-001, Revision 4, dated July 11,
2017, or within 6 months after November 7, 2018, whichever is later.
Accomplishing the revision of the existing maintenance or inspection
program required by paragraph (m) of this AD terminates the
requirements of this paragraph.
(k) Retained No Alternative Actions and Intervals, With No Changes
This paragraph restates the requirements of paragraph (i) of AD
2018-19-24, with no changes. Except as required by paragraph (m) of
this AD: After the maintenance or inspection program has been
revised as required by paragraph (j) of this AD, no alternative
actions (e.g., inspections) or intervals may be used unless the
actions or intervals are approved as an AMOC in accordance with the
procedures specified in paragraph (o)(1) of this AD.
(l) Retained No Reporting Requirement, With No Changes
This paragraph restates the requirements of paragraph (k) of AD
2018-19-24, with no changes. Although the Accomplishment
Instructions of BAE Systems (Operations) Limited Alert Service
Bulletin J41-A53-058, dated December 6, 2016, specify to submit
certain information to the manufacturer, this AD does not include
that requirement.
(m) New Revision of the Existing Maintenance or Inspection Program
Within 90 days after the effective date of this AD: Revise the
existing maintenance or inspection program, as applicable, by
incorporating Subjects 05-10-10, ``Airworthiness Limitations''; 05-
10-20, ``Certification Maintenance Requirements''; and 05-10-30,
``Critical Design Configuration Control Limitations (CDCCL)--Fuel
System''; of Chapter 05, ``Airworthiness Limitations,'' of the BAE
Systems (Operations) Limited J41 AMM, Revision 44, dated June 15,
2021, for effectivity group 403; or BAE Systems (Operations) Limited
J41 AMM, Revision 44, dated June 15, 2021, for effectivity group
408; as applicable. The initial compliance times for the tasks are
at the applicable times specified in paragraphs (m)(1) through (3)
of this AD. Accomplishing the revision of the existing maintenance
or inspection program required by this paragraph terminates the
actions required by paragraphs (g), (i) and (j) of this AD.
(1) For replacement tasks of life limited parts specified in
Subject 05-10-10, ``Airworthiness Limitations,'' of Chapter 05,
``Airworthiness Limitations,'' of the BAE Systems (Operations)
Limited J41 AMM, Revision 44, dated June 15, 2021, for effectivity
group 403; or BAE Systems (Operations) Limited J41 AMM, Revision 44,
dated June 15, 2021, for effectivity group 408; as applicable: Prior
to the applicable flight cycles (landings) or flight hours (flying
hours) on the part specified in the ``Mandatory Life Limits'' column
in Subject 05-10-10, or within 90 days after the effective date of
this AD, whichever occurs later.
(2) For structurally significant item tasks specified in Subject
05-10-10, ``Airworthiness Limitations,'' of Chapter 05,
``Airworthiness Limitations,'' of the BAE Systems (Operations)
Limited J41 AMM, Revision 44, dated June 15, 2021, for effectivity
group 403; or BAE Systems (Operations) Limited J41 AMM, Revision 44,
dated June 15, 2021. for effectivity group 408; as applicable: Prior
to the accumulation of the applicable flight cycles specified in the
``Initial Inspection'' column in Subject 05-10-10, or within 90 days
after the effective date of this AD, whichever occurs later.
(3) For certification maintenance requirements tasks specified
in Subject 05-10-20, ``Certification Maintenance Requirements,'' of
Chapter 05, ``Airworthiness Limitations,'' of the BAE Systems
(Operations) Limited J41 AMM, Revision 44, dated June 15, 2021, for
effectivity group 403; or BAE Systems (Operations) Limited J41 AMM,
Revision 44, dated June 15, 2021, for effectivity group 408; as
applicable: Prior to the accumulation of the applicable flight hours
specified in the ``Time Between Checks'' column in Subject 05-10-20,
or within 90 days after the effective date of this AD, whichever
occurs later; except for tasks that specify ``first flight of the
day'' in the ``Time Between Checks'' column in Subject 05-10-20, the
initial compliance time is the first flight of the next day after
accomplishing the revision required by paragraph (m) of this AD, or
within 90 days after the effective date of this AD, whichever occurs
later.
(n) New No Alternative Actions, Intervals, or Critical Design
Configuration Control Limitations (CDCCLs)
After the existing maintenance or inspection program has been
revised as required by paragraph (m) of this AD, no alternative
actions (e.g., inspections), intervals, or CDCCLs may be used unless
the actions, intervals, and CDCCLs are approved as an AMOC in
accordance with the procedures specified in paragraph (o)(1) of this
AD.
(o) Additional AD Provisions
The following provisions also apply to this AD:
(1) Alternative Methods of Compliance (AMOCs): The Manager,
International Validation Branch, FAA, has the authority to approve
AMOCs for this AD, if requested using the procedures found in 14 CFR
39.19. In accordance with 14 CFR 39.19, send your request to your
principal inspector or responsible Flight Standards Office, as
appropriate. If sending information directly to the International
Validation Branch, send it to the attention of the person identified
in paragraph (p)(2) of this AD. Information may be emailed to: <a href="/cdn-cgi/l/email-protection#e9d0c4a8bfbac4a8a0bbc4dedad9c4a8a4a6aaa98f8888c78e869f"><span class="__cf_email__" data-cfemail="0e37234f585d234f475c23393d3e234f43414d4e686f6f20696178">[email protected]</span></a>. Before using any approved AMOC, notify
your appropriate principal inspector, or lacking a principal
inspector, the manager of the responsible Flight Standards Office.
(2) Contacting the Manufacturer: For any requirement in this AD
to obtain instructions from a manufacturer, the instructions must
[[Page 63978]]
be accomplished using a method approved by the Manager,
International Validation Branch, FAA; or the United Kingdom Civil
Aviation Authority (U.K. CAA); or BAE Systems (Operations) Limited's
U.K. CAA Design Organization Approval (DOA). If approved by the DOA,
the approval must include the DOA-authorized signature.
(p) Additional Information
(1) Refer to U.K. CAA AD G-2022-0006, dated March 30, 2022, for
related information. This U.K. CAA AD may be found in the AD docket
at <a href="http://regulations.gov">regulations.gov</a> under Docket No. FAA-2022-1298.
(2) For more information about this AD, contact Todd Thompson,
Aerospace Engineer, Large Aircraft Section, FAA, International
Validation Branch, 2200 South 216th St., Des Moines, WA 98198;
telephone 206-231-3228; email <a href="/cdn-cgi/l/email-protection#a7d3c8c3c389d3cfc8cad7d4c8c9e7c1c6c689c0c8d1"><span class="__cf_email__" data-cfemail="0d7962696923796562607d7e62634d6b6c6c236a627b">[email protected]</span></a>.
(q) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless this AD specifies otherwise.
(3) The following service information was approved for IBR.
(i) Chapter 05 of BAE Systems (Operations) Limited J41 Aircraft
Maintenance Manual (AMM), Revision 44, dated June 15, 2021, for
effectivity group 403;
(ii) Chapter 05 of BAE Systems (Operations) Limited J41 AMM,
Revision 44, dated June 15, 2021, for effectivity group 408.
(4) The following service information was approved for IBR on
November 7, 2018 (83 FR 49786, October 3, 2018).
(i) BAE Systems (Operations) Limited Alert Service Bulletin J41-
A53-058, dated December 6, 2016.
(ii) BAE Systems (Operations) Limited Service Bulletin J41-51-
001, Revision 4, dated July 11, 2017.
(5) The following service information was approved for IBR on
May 16, 2016 (81 FR 21263, April 11, 2016).
(i) Chapter 05, ``Airworthiness Limitations,'' of the BAE
Systems (Operations) Limited J41 Aircraft Maintenance Manual (AMM),
Revision 38, dated September 15, 2013. Page 1 of the ``Publications
Transmittal'' is the only page that shows the revision level of this
document.
(A) Subject 05-10-10, ``Airworthiness Limitations.''
(B) Subject 05-10-20, ``Certification Maintenance
Requirements.''
(C) Subject 05-10-30, ``Critical Design Configuration Control
Limitations (CDCCL)--Fuel System.''
(ii) [Reserved]
(6) For service information identified in this AD, contact BAE
Systems (Operations) Limited, Customer Information Department,
Prestwick International Airport, Ayrshire, KA9 2RW, Scotland, United
Kingdom; telephone +44 1292 675207; fax +44 1292 675704; email
<a href="/cdn-cgi/l/email-protection#1f4d5e6f6a7d73767c7e6b7670716c5f7d7e7a6c666c6b7a726c317c7072"><span class="__cf_email__" data-cfemail="5103102124333d38323025383e3f221133303422282225343c227f323e3c">[email protected]</span></a>; website <a href="http://baesystems.com/Businesses/RegionalAircraft/index.htm">baesystems.com/Businesses/RegionalAircraft/index.htm</a>.
(7) You may view this service information at the FAA,
Airworthiness Products Section, Operational Safety Branch, 2200
South 216th St., Des Moines, WA. For information on the availability
of this material at the FAA, call 206-231-3195.
(8) You may view this service information that is incorporated
by reference at the National Archives and Records Administration
(NARA). For information on the availability of this material at
NARA, email <a href="/cdn-cgi/l/email-protection#bed8cc90d7d0cdcedbddcad7d1d0fed0dfccdf90d9d1c8"><span class="__cf_email__" data-cfemail="583e2a7631362b283d3b2c3137361836392a39763f372e">[email protected]</span></a>, or go to: <a href="http://www.archives.gov/federal-register/cfr/ibr-locations.html">www.archives.gov/federal-register/cfr/ibr-locations.html</a>.
Issued on October 6, 2022.
Christina Underwood,
Acting Director, Compliance & Airworthiness Division, Aircraft
Certification Service.
[FR Doc. 2022-22202 Filed 10-20-22; 8:45 am]
BILLING CODE 4910-13-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.