Notice2022-21005

The Chemical Market Analysis & Consulting Company, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
September 28, 2022

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 87 Issue 187 (Wednesday, September 28, 2022)</title>
</head>
<body><pre>
[Federal Register Volume 87, Number 187 (Wednesday, September 28, 2022)]
[Notices]
[Page 58789]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2022-21005]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 15283-000]


The Chemical Market Analysis & Consulting Company, LLC; Notice of 
Preliminary Permit Application Accepted for Filing and Soliciting 
Comments, Motions To Intervene, and Competing Applications

    On August 11, 2022, The Chemical Market Analysis & Consulting 
Company, LLC, filed an application for a preliminary permit, pursuant 
to section 4(f) of the Federal Power Act (FPA), proposing to study the 
feasibility of the Fitler Bend Hydrokinetic Energy Project to be 
located on the Mississippi River in Issaquena County, Mississippi, and 
East Carroll Parish, Louisiana. The sole purpose of a preliminary 
permit, if issued, is to grant the permit holder priority to file a 
license application during the permit term. A preliminary permit does 
not authorize the permit holder to perform any land-disturbing 
activities or otherwise enter upon lands or waters owned by others 
without the owners' express permission.
    The proposed Filter Bend Hydrokinetic Project would consist of: (1) 
2,000, 10 to 13 foot diameter, 750 kilowatt hydrokinetic turbine units 
arranged in arrays, typically two units wide and three units high, and 
generating power from the flow of the Mississippi River; (2) 
approximately 333 stand-alone pilings, installed in the river bottom, 
one for mounting each array; and (3) 34.6 kilovolt substations, 
constructed of masonry above the high-water mark of the riverbank, 
receiving power from the arrays, and interconnecting with potential 
industrial consumers. The total project would occupy much of the bottom 
of the Issaquena County, Mississippi side of an approximately 15 mile 
reach of Mississippi River. The project would have a total installed 
capacity of 1,500 megawatts and an average annual generation of 1.56 
million megawatt-hours.
    Applicant Contact: Cooley May, Chemical Market Analysis & 
Consulting Company, LLC, 1160 Dairy Ashford Road, Suite 609, Houston, 
TX 77079; email: <a href="/cdn-cgi/l/email-protection#294a4646454c5007444850694a04154809415b4c4f14" http: macc.com">macc.com</a>">cooley.may@c-<a href="http://macc.com">macc.com</a></a>; phone: (212) 729-3669.
    FERC Contact: Michael Spencer; email: <a href="/cdn-cgi/l/email-protection#b3dedad0dbd2d6df9dc0c3d6ddd0d6c1f3d5d6c1d09dd4dcc5"><span class="__cf_email__" data-cfemail="84e9ede7ece5e1e8aaf7f4e1eae7e1f6c4e2e1f6e7aae3ebf2">[email&#160;protected]</span></a>; 
phone: (202) 502-6093.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/eFiling.aspx">https://ferconline.ferc.gov/eFiling.aspx</a>. Commenters can submit brief comments 
up to 6,000 characters, without prior registration, using the eComment 
system at <a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. You must 
include your name and contact information at the end of your comments. 
For assistance, please contact FERC Online Support. In lieu of 
electronic filing, you may submit a paper copy. Submissions sent via 
the U.S. Postal Service must be addressed to: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Room 1A, Washington, DC 20426. Submissions sent via any other carrier 
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. 
The first page of any filing should include docket number P-15283-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's website at <a href="https://www.ferc.gov/docs-filing/elibrary.asp">https://www.ferc.gov/docs-filing/elibrary.asp</a>. 
Enter the docket number (P-15283) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: September 22, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-21005 Filed 9-27-22; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on September 28, 2022.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.