Notice2022-19043

Agency Information Collection Activities; Renewable Energy and Alternate Uses of Existing Facilities on the Outer Continental Shelf

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
September 2, 2022

Issuing agencies

Interior DepartmentOcean Energy Management Bureau

Abstract

In accordance with the Paperwork Reduction Act of 1995, the Bureau of Ocean Energy Management (BOEM) is proposing to renew an information collection request (ICR).

Full Text

<html>
<head>
<title>Federal Register, Volume 87 Issue 170 (Friday, September 2, 2022)</title>
</head>
<body><pre>
[Federal Register Volume 87, Number 170 (Friday, September 2, 2022)]
[Notices]
[Pages 54250-54258]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2022-19043]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Ocean Energy Management

[OMB Control Number 1010-0176; Docket ID: BOEM-2017-0016]


Agency Information Collection Activities; Renewable Energy and 
Alternate Uses of Existing Facilities on the Outer Continental Shelf

AGENCY: Bureau of Ocean Energy Management, Interior.

ACTION: Notice of information collection; request for comment.

-----------------------------------------------------------------------

SUMMARY: In accordance with the Paperwork Reduction Act of 1995, the 
Bureau of Ocean Energy Management (BOEM) is proposing to renew an 
information collection request (ICR).

DATES: Interested persons are invited to submit comments, which must be 
received by BOEM no later than November 1, 2022.

ADDRESSES: Send your comments on this ICR by mail to the BOEM 
Information Collection Clearance Officer, Anna Atkinson, Bureau of 
Ocean Energy Management, 45600 Woodland Road, Sterling, Virginia 20166; 
or by email to <a href="/cdn-cgi/l/email-protection#4f2e21212e612e3b2426213c20210f2d202a2261282039"><span class="__cf_email__" data-cfemail="8beae5e5eaa5eaffe0e2e5f8e4e5cbe9e4eee6a5ece4fd">[email&#160;protected]</span></a>. Please reference Office of 
Management and Budget (OMB) Control Number 1010-0176 in the subject 
line of your comments. You may also view the ICR and its related 
documents by searching the docket number BOEM-2017-0016 at <a href="http://www.reginfo.gov/public/do/PRAMain">http://www.reginfo.gov/public/do/PRAMain</a>.

FOR FURTHER INFORMATION CONTACT: Contact Anna Atkinson by email at 
<a href="/cdn-cgi/l/email-protection#42232c2c236c2336292b2c312d2c02202d272f6c252d34"><span class="__cf_email__" data-cfemail="66070808074807120d0f08150908260409030b48010910">[email&#160;protected]</span></a> or by telephone at 703-787-1025. Individuals in 
the United States who are deaf, deafblind, hard of hearing, or have a 
speech disability may dial 711 (TTY, TDD, or TeleBraille) to access 
telecommunications relay services. Individuals outside of the United 
States should use the relay services offered within their country to 
make international calls to the point-of-contact in the United States.

SUPPLEMENTARY INFORMATION: In accordance with the Paperwork Reduction 
Act of 1995, BOEM provides the general public and other Federal 
agencies with an opportunity to comment on new, proposed, revised, and 
continuing collections of information. This helps BOEM assess the 
impact of its information collection requirements and minimize the 
public's reporting burden. It also helps the public understand BOEM's 
information collection requirements and provide the requested data in 
the desired format.
    BOEM is soliciting comments on the proposed ICR described below. 
BOEM is especially interested in public comments addressing the 
following issues: (1) is the collection necessary to the proper 
functions of BOEM; (2) what can BOEM do to ensure that this information 
is processed and used in a timely manner; (3) is the burden estimate 
accurate; (4) how might BOEM enhance the quality, utility, and clarity 
of the information to be collected; and (5) how might BOEM minimize the 
burden of this collection on the respondents, including minimizing the 
burden through the use of information technology?
    Comments submitted in response to this notice are a matter of 
public record. BOEM will include or summarize each comment in its ICR 
to OMB for approval of this information collection. You should be aware 
that your entire comment--including your address, phone number, email 
address, or other personally identifiable information included in your 
comment--may be made publicly available at any time.
    You may request that BOEM withhold your personally identifiable 
information from public disclosure. In order for BOEM to consider 
withholding from disclosure your personally identifying information, 
you must identify, in a cover letter, any information contained in the 
submittal of your comments that, if released, would constitute a 
clearly unwarranted invasion of your personal privacy. You must also 
briefly describe any possible harmful consequences from disclosing your 
information, such as embarrassment, injury, or other harm. Even if BOEM 
withholds your information in the context of this ICR, your submission 
is subject to the Freedom of Information Act (FOIA). If your submission 
is requested under the FOIA, BOEM can only withhold your information if 
it determines that one of the FOIA's exemptions to disclosure applies. 
Such a determination will be made in accordance with the Department's 
FOIA regulations and applicable law.
    Note that BOEM will make available for public inspection all 
comments in their entirety submitted by organizations and businesses, 
or by individuals identifying themselves as representatives of 
organizations or businesses.
    BOEM protects proprietary information in accordance with FOIA (5 
U.S.C. 552), the Department of the Interior's implementing regulations 
(43 CFR part 2), and 30 CFR 585.113
    Title of Collection: ``30 CFR part 585, Renewable Energy and 
Alternate Uses of Existing Facilities on the Outer Continental Shelf.''
    Abstract: The ICR addresses the paperwork requirements in the 
regulations under ``30 CFR part 585, Renewable Energy and Alternate 
Uses of Existing Facilities on the Outer Continental Shelf [OCS]'' 
issued pursuant to the OCS Lands Act, as amended (43 U.S.C. 1331 et 
seq.). The OCS Lands Act at subsection 8(p) (43 U.S.C. 1337(p)) 
authorizes the Secretary of the Interior to issue leases, easements, or 
rights-of way on the OCS for activities that produce or support 
production, transportation, or transmission of energy from sources 
other than oil and gas, including renewable energy. Subsection 8(p) 
directs the Secretary to issue any necessary regulations to carry out 
the OCS renewable energy program. The Secretary delegated this 
authority to BOEM. BOEM issued regulations for OCS renewable energy 
activities at 30 CFR part 585; this notice concerns the reporting and 
recordkeeping elements required by these regulations.
    Respondents are lessees and grantees submitting plans for 
commercial and noncommercial renewable energy projects on the OCS, and, 
if such plans are approved, constructing, operating, maintaining, and 
decommissioning those projects. BOEM must ensure that these activities 
are carried out in a manner that provides for, among other things, 
safety, protection of the environment, and consideration of other OCS 
users. In order to execute its duties, BOEM requires information 
regarding potential purchasers of leases, grants, and rights-of-way; 
their proposed activities; their financial assurance instruments to 
ensure accrued obligations are met; and their payments to the U.S. 
Treasury.
    BOEM uses forms to collect some information to ensure proper and 
efficient administration of OCS renewable energy leases and grants and 
to document the financial responsibility of lessees and grantees. Forms 
BOEM-0002, BOEM-0003, BOEM-0004, and BOEM-0006 are used by renewable 
energy entities on the OCS to assign a lease interest, designate an 
operator, and to assign or relinquish a lease or grant. Form BOEM-0005 
is used to document a surety's guarantee lessees' and

[[Page 54251]]

grantees' performance. BOEM maintains the submitted forms as official 
lease and grant records.
    OMB Control Number: 1010-0176.
    Form Number:
    <bullet> BOEM-0002, ``Outer Continental Shelf (OCS) Renewable 
Energy Assignment of Grant;''
    <bullet> BOEM-0003, ``Assignment of Record Title Interest in 
Federal OCS Renewable Energy Lease;''
    <bullet> BOEM-0004, ``Outer Continental Shelf (OCS) Renewable 
Energy Lease or Grant Relinquishment Application;''
    <bullet> BOEM-0005, ``Outer Continental Shelf (OCS) Renewable 
Energy Lessee's, Grantee's, and Operator's Bond;'' and
    <bullet> BOEM-0006, ``Outer Continental Shelf (OCS) Renewable 
Energy Lease or Grant Designation of Operator.''
    Type of Review: Extension of a currently approved information 
collection.
    Respondents/Affected Public: Companies interested in renewable 
energy-related uses on the OCS and holders of leases and grants under 
30 CFR part 585.
    Total Estimated Number of Annual Responses: 265 responses.
    Total Estimated Number of Annual Burden Hours: 18,783 hours.
    Respondent's Obligation: Mandatory or required to obtain or retain 
a benefit.
    Frequency of Collection: On occasion or annually.
    Total Estimated Annual Non-Hour Burden Cost: $3,816,000 non-hour 
costs. The non-hour cost burdens consist of service fees and payments 
to a contractor for drafting BOEM-required documents, preparing and 
conducting a site-specific study, and writing a report to evaluate the 
cause of harm to natural resources.
    Estimated Reporting and Recordkeeping Hour Burden: The estimated 
annual hour burden for this collection is 18,783 hours. The following 
table details the individual components and estimated hour burdens. In 
calculating the burdens, BOEM recognized that some of its required 
information collections are incurred by respondents in the normal 
course of their activities, like compiling and maintaining business 
records. BOEM considers some information collection activities to be 
usual and customary business practices and excluded those activities 
from its account in estimating the burden.
    The following table details the individual BOEM components and 
respective burden hours of this ICR.

                                                  Burden Table
----------------------------------------------------------------------------------------------------------------
                                        Reporting and
     Section(s) in 30 CFR 585           recordkeeping        Hour burden     Average number of     Annual burden
                                       requirement \1\                        annual responses         hours
----------------------------------------------------------------------------------------------------------------
                                            Non-hour cost burdens
----------------------------------------------------------------------------------------------------------------
                                          Subpart A--General Provisions
----------------------------------------------------------------------------------------------------------------
102; 105; 110.....................  These sections contain general references to                               0
                                     responsibilities, submitting requests, applications, plans,
                                     notices, reports, and/or supplemental information needed to
                                     support requests for BOEM approval--burdens covered under
                                     specific requirements.
----------------------------------------------------------------------------------------------------------------
102(e)............................  State(s), local                     1  2 agreements.........               2
                                     government(s), and/
                                     or Indian Tribe(s)
                                     enter into task
                                     force or joint
                                     planning or
                                     coordination
                                     agreement with BOEM.
----------------------------------------------------------------------------------------------------------------
103; 904;.........................  Request general                     2  6 requests...........              12
                                     departures not
                                     specifically covered
                                     elsewhere in part
                                     585.
----------------------------------------------------------------------------------------------------------------
105(c)............................  Make oral requests or               1  5 requests...........               5
                                     notifications and
                                     submit written
                                     follow up within 3
                                     business days not
                                     specifically covered
                                     elsewhere in part
                                     585.
----------------------------------------------------------------------------------------------------------------
106; 107; 213(e); 230(f); 302(a);   Submit evidence of                  2  20 submissions.......              40
 408(b)(7); 409(c); 1005(d);         qualifications to
 1007(c); 1013(b)(7).                hold a lease or
                                     grant; submit
                                     required supporting
                                     information
                                     (electronically if
                                     required).
----------------------------------------------------------------------------------------------------------------
106(b)(1).........................  Request exception                   1  1 exception..........               1
                                     from exclusion or
                                     disqualification
                                     from participating
                                     in transactions
                                     covered by Federal
                                     non-procurement
                                     debarment and
                                     suspension system.
----------------------------------------------------------------------------------------------------------------
106(b)(2), 118(c), 225(b); 436;     Request                Requirement not considered IC under 5               0
 437; 527(c); 705(c)(2); 1016.       reconsideration and/  CFR 1320.3(h)(9).
                                     or hearing.
----------------------------------------------------------------------------------------------------------------
108; 530(b).......................  Notify BOEM within 3                1  1 notice.............               1
                                     business days after
                                     learning of any
                                     action filed
                                     alleging respondent
                                     is insolvent or
                                     bankrupt.
----------------------------------------------------------------------------------------------------------------
109...............................  Notify BOEM in         Requirement not considered IC under 5               0
                                     writing of merger,    CFR 1320.3(h)(1).
                                     name change, or
                                     change of business
                                     form no later than
                                     120 days after
                                     earliest of either
                                     the effective date
                                     or filing date.
----------------------------------------------------------------------------------------------------------------
111...............................  Within 30 days of                  .5  4 submissions........               2
                                     receiving bill,
                                     submit processing
                                     fee payments for
                                     BOEM document or
                                     study preparation to
                                     process applications
                                     and other requests.
                                                          ------------------------------------------------------
                                                                       4 payments x $4,000 = $16,000
----------------------------------------------------------------------------------------------------------------
111(b)(2), (3)....................  Submit comments on                  2  4 requests...........               8
                                     proposed processing
                                     fee or request
                                     approval to perform
                                     or directly pay
                                     contractor for all
                                     or part of any
                                     document, study, or
                                     other activity, to
                                     reduce BOEM
                                     processing costs.
----------------------------------------------------------------------------------------------------------------
111(b)(3).........................  Perform, conduct,              12,000  1 submission.........          12,000
                                     develop, etc., all
                                     or part of any
                                     document, study, or
                                     other activity; and
                                     provide results to
                                     BOEM to reduce BOEM
                                     processing fee.
----------------------------------------------------------------------------------------------------------------
111(b)(3).........................  Pay contractor for               3 studies x $950,000 = $2,850,000
                                     all or part of any
                                     document, study, or
                                     other activity, and
                                     provide results to
                                     BOEM to reduce BOEM
                                     processing costs.
----------------------------------------------------------------------------------------------------------------

[[Page 54252]]

 
111(b)(7); 118(a); 436(c).........  Appeal BOEM estimated  Exempt under 5 CFR 1320.4(a)(2), (c).               0
                                     processing costs,
                                     decisions, or orders
                                     pursuant to 30 CFR
                                     590.
----------------------------------------------------------------------------------------------------------------
115(c)............................  Request approval to                 1  1 request............               1
                                     use later edition of
                                     a document
                                     incorporated by
                                     reference or
                                     alternative
                                     compliance.
----------------------------------------------------------------------------------------------------------------
118(c); 225(b)....................  Within 15 days of bid  Requirement not considered IC under 5               0
                                     rejection, request    CFR 1320.3(h)(9).
                                     reconsideration of
                                     bid decision or
                                     rejection.
----------------------------------------------------------------------------------------------------------------
    Subtotal.............................................................  45 responses.........          12,072
                                   -----------------------------------------------------------------------------
                                          $2,866,000 non-hour costs
----------------------------------------------------------------------------------------------------------------
                               Subpart B--Issuance of OCS Renewable Energy Leases
----------------------------------------------------------------------------------------------------------------
200; 224; 231; 235; 236; 238......  These sections contain references to information                           0
                                     submissions, approvals, requests, applications, plans,
                                     payments, etc., the burdens for which are covered elsewhere
                                     in part 585.
----------------------------------------------------------------------------------------------------------------
210; 211(a-c); 212 thru 216.......  Submit nominations     Not considered IC as defined in 5 CFR               0
                                     and general comments  1320.3(h)(4).
                                     in response to
                                     Federal Register
                                     notices on Request
                                     for Interest in OCS
                                     Leasing, Call for
                                     Information and
                                     Nominations (Call),
                                     Area Identification,
                                     and Notices of Sale.
                                     Includes industry,
                                     State & local
                                     governments.
----------------------------------------------------------------------------------------------------------------
210; 211(a-c); 212 thru 216.......  Submit required                     4  30 responses.........             120
                                     information in
                                     response to Federal
                                     Register notices on
                                     Request for Interest
                                     in OCS Leasing, Call
                                     for Information and
                                     Nominations (Call),
                                     Area Identification,
                                     and Notices of Sale.
                                     Includes industry,
                                     State & local
                                     governments.
----------------------------------------------------------------------------------------------------------------
211(d); 216; 220 thru 223;          Submit bid, payments,               5  12 bids..............              60
 231(c)(2).                          and required
                                     information in
                                     response to Federal
                                     Register Final Sale
                                     Notice.
----------------------------------------------------------------------------------------------------------------
224...............................  Within 10 business                  1  2 lease executions...               2
                                     days, execute 3
                                     copies of lease form
                                     and return to BOEM
                                     with required
                                     payments, including
                                     evidence that agent
                                     is authorized to act
                                     for bidder; if
                                     applicable, submit
                                     information to
                                     support delay in
                                     execution--competiti
                                     ve leases.
----------------------------------------------------------------------------------------------------------------
230; 231(a).......................  Submit unsolicited                  5  2 requests...........              10
                                     request and
                                     acquisition fee for
                                     a commercial or
                                     limited lease.
----------------------------------------------------------------------------------------------------------------
231(b)............................  Submit comments in                  4  4 comments...........              16
                                     response to public
                                     notice re interest
                                     of unsolicited
                                     request for a lease.
----------------------------------------------------------------------------------------------------------------
231(g)............................  Within 10 business                  2  2 leases.............               4
                                     days of receiving
                                     lease documents,
                                     execute lease; file
                                     financial assurance
                                     and supporting
                                     documentation--nonco
                                     mpetitive leases.
----------------------------------------------------------------------------------------------------------------
231(g)............................  Within 45 days of      Burdens covered by information                      0
                                     receiving lease       collections approved for ONRR 30 CFR
                                     copies, submit rent   Chapter XII.
                                     and rent information.
----------------------------------------------------------------------------------------------------------------
235(b); 236(b)....................  Request additional                  1  3 requests...........               3
                                     time to extend
                                     preliminary or site
                                     assessment term of
                                     commercial or
                                     limited lease,
                                     including revised
                                     schedule for SAP,
                                     COP, or GAP
                                     submission.
----------------------------------------------------------------------------------------------------------------
237(b)............................  Request lease be                    1  1 request............               1
                                     dated and effective
                                     1st day of month in
                                     which signed.
----------------------------------------------------------------------------------------------------------------
238...............................  Submit request for                  4  1 request............               4
                                     renewable energy
                                     research lease.
----------------------------------------------------------------------------------------------------------------
    Subtotal.............................................................  57 responses.........             220
----------------------------------------------------------------------------------------------------------------
                      Subpart C--ROW Grants and RUE Grants for Renewable Energy Activities
----------------------------------------------------------------------------------------------------------------
306; 309; 315; 316................  These sections contain references to information                           0
                                     submissions, approvals, requests, applications, plans,
                                     payments, etc., the burdens for which are covered elsewhere
                                     in part 585.
----------------------------------------------------------------------------------------------------------------
302(a); 305; 306..................  Submit copies of a                  5  1 request............               5
                                     request for a new or
                                     modified ROW or RUE
                                     and required
                                     information,
                                     including
                                     qualifications to
                                     hold a grant, in
                                     format specified.
----------------------------------------------------------------------------------------------------------------
308(a)............................  Submit comments in                  4  2 comments...........               8
                                     response to public
                                     notice of grant
                                     auction.
----------------------------------------------------------------------------------------------------------------
308(a)(2), (b); 315; 316..........  Submit bid and                      5  1 bid................               5
                                     payments in response
                                     to Federal Register
                                     notice of auction
                                     for a ROW or RUE
                                     grant.
----------------------------------------------------------------------------------------------------------------
309...............................  Submit decision to                  2  1 submission.........               2
                                     accept or reject
                                     terms and conditions
                                     of noncompetitive
                                     ROW or RUE grant.
----------------------------------------------------------------------------------------------------------------
    Subtotal.............................................................  5 responses..........              20
----------------------------------------------------------------------------------------------------------------

[[Page 54253]]

 
                                    Subpart D--Lease and Grant Administration
----------------------------------------------------------------------------------------------------------------
400; 401; 402; 405; 409; 416, 433.  These sections contain references to information                           0
                                     submissions, approvals, requests, applications, plans,
                                     payments, etc., the burdens for which are covered elsewhere
                                     in part 585.
----------------------------------------------------------------------------------------------------------------
401(b)............................  Take measures                     100  1 report.............             100
                                     directed by BOEM in
                                     cessation order and
                                     submit reports in
                                     order to resume
                                     activities.
----------------------------------------------------------------------------------------------------------------
405(d)............................  Submit written notice  Requirement not considered IC under 5               0
                                     of change of address. CFR 1320.3(h)(1).
----------------------------------------------------------------------------------------------------------------
405(e); Form BOEM-0006............  If designated                       1  1 notice.............               1
                                     operator (DO)
                                     changes, notify BOEM
                                     and identify new DO
                                     for BOEM approval.
----------------------------------------------------------------------------------------------------------------
408 thru 411; Forms BOEM-0002 and   Within 90 days after    1 (30 minutes  2 requests/                         2
 BOEM-0003.                          last party executes     per form x 2   submissions.
                                     a transfer                 forms = 1
                                     agreement, submit              hour)
                                     copies of a lease or
                                     grant assignment
                                     application,
                                     including originals
                                     of each instrument
                                     creating or
                                     transferring
                                     ownership of record
                                     title, eligibility
                                     and other
                                     qualifications; and
                                     evidence that agent
                                     is authorized to
                                     execute assignment,
                                     in format specified.
----------------------------------------------------------------------------------------------------------------
415(a)(1); 416; 420(a), (b);        Submit request for                 10  1 request............              10
 428(b).                             suspension and
                                     required information/
                                     payment no later
                                     than 90 days prior
                                     to lease or grant
                                     expiration.
----------------------------------------------------------------------------------------------------------------
417(b)............................  Conduct, and if                   100  1 study/submission...             100
                                     required pay for,
                                     site-specific study
                                     to evaluate cause of
                                     harm or damage; and
                                     submit copies of
                                     study and results,
                                     in format specified.
                                                          ------------------------------------------------------
                                                                       1 study x $950,000 = $950,000
----------------------------------------------------------------------------------------------------------------
425 thru 428; 652(a); 235(a), (b).  Request lease or                    6  1 request............               6
                                     grant renewal no
                                     later than 180 days
                                     before termination
                                     date of your limited
                                     lease or grant, or
                                     no later than 2
                                     years before
                                     termination date of
                                     operations term of
                                     commercial lease.
                                     Submit required
                                     information.
----------------------------------------------------------------------------------------------------------------
435; 658(c)(2); Form BOEM-0004....  Submit copies of                    1  1 submission.........               1
                                     application to
                                     relinquish lease or
                                     grant, in format
                                     specified.
----------------------------------------------------------------------------------------------------------------
436; 437..........................  Provide information    Requirement not considered IC under 5               0
                                     for reconsideration   CFR 1320.3(h)(9).
                                     of BOEM decision to
                                     contract or cancel
                                     lease or grant area.
----------------------------------------------------------------------------------------------------------------
    Subtotal.............................................................  8 responses..........             220
                                   -----------------------------------------------------------------------------
                                           $950,000 non-hour costs
----------------------------------------------------------------------------------------------------------------
                            Subpart E--Payments and Financial Assurance Requirements
----------------------------------------------------------------------------------------------------------------
An * indicates the primary cites for providing bonds or other financial assurance, and the                     0
 burdens include any previous or subsequent references throughout part 585 to furnish, replace,
 or provide additional bonds, securities, or financial assurance (including riders,
 cancellations, replacements). This subpart contains references to other information
 submissions, approvals, requests, applications, plans, etc., the burdens for which are covered
 elsewhere in part 585. In the future BOEM may require electronic filings of certain
 submissions.
----------------------------------------------------------------------------------------------------------------
500 thru 509; 1011................  Submit payor           Burdens covered by information                      0
                                     information,          collections approved for ONRR 30 CFR
                                     payments and payment  Chapter XII.
                                     information, and
                                     maintain auditable
                                     records according to
                                     ONRR regulations or
                                     guidance.
----------------------------------------------------------------------------------------------------------------
506(c)(4).........................  Submit documentation   Burden covered under DOE/EIA OMB                    0
                                     of the gross annual   Control Number 1905-0129.
                                     generation of
                                     electricity produced
                                     by the generating
                                     facility on the
                                     lease--use same form
                                     as authorized by the
                                     EIA.
----------------------------------------------------------------------------------------------------------------
510; 506(c)(3)....................  Submit application                  1  1 submission.........               1
                                     and required
                                     information for
                                     waiver or reduction
                                     of rental or other
                                     payment.
----------------------------------------------------------------------------------------------------------------
* 515; 516; 525(a) thru (f).......  Execute and provide                 1  2 bonds..............               2
                                     $100,000 minimum
                                     lease-specific bond
                                     or other approved
                                     security; or
                                     increase bond level
                                     if required.
----------------------------------------------------------------------------------------------------------------
* 516(a)(2), (3), (b), (c); 517;    Execute and provide                 1  2 bonds..............               2
 525(a) thru (f).                    commercial lease
                                     supplemental bonds
                                     in amounts
                                     determined by BOEM.
----------------------------------------------------------------------------------------------------------------
516(a)(4); 521(c).................  Execute and provide                 1  1 bond...............               1
                                     decommissioning bond
                                     or other financial
                                     assurance; schedule
                                     for providing the
                                     appropriate amount.
----------------------------------------------------------------------------------------------------------------
517(c)(1).........................  Submit comments on                  1  1 submission.........               1
                                     proposed adjustment
                                     to bond amounts.
----------------------------------------------------------------------------------------------------------------
517(c)(2).........................  Request bond                        5  1 request............               5
                                     reduction and submit
                                     evidence to justify.
----------------------------------------------------------------------------------------------------------------
* 520; 521; 525(a) thru (f); Form   Execute and provide                 1  1 bond...............               1
 BOEM-0005.                          $300,000 minimum
                                     limited lease or
                                     grant-specific bond
                                     or increase
                                     financial assurance
                                     and submit required
                                     information.
----------------------------------------------------------------------------------------------------------------

[[Page 54254]]

 
525(g)............................  Surety notice to                    1  1 surety notice......               1
                                     lessee or ROW/RUE
                                     grant holder and
                                     BOEM within 5
                                     business days after
                                     initiating surety
                                     insolvency or
                                     bankruptcy
                                     proceeding, or
                                     Treasury decertifies
                                     surety.
----------------------------------------------------------------------------------------------------------------
* 526 Form BOEM-0005..............  In lieu of surety                   2  1 pledge.............               2
                                     bond, pledge other
                                     types of securities,
                                     including authority
                                     for BOEM to sell and
                                     use proceeds and
                                     submit required
                                     information (1 hour
                                     for form).
----------------------------------------------------------------------------------------------------------------
526(c)............................  Provide annual                      1  1 statement..........               1
                                     certified statements
                                     describing the
                                     nature and market
                                     value, including
                                     brokerage firm
                                     statements/reports.
----------------------------------------------------------------------------------------------------------------
* 527; 531........................  Demonstrate financial              10  1 demonstration......              10
                                     worth/ability to
                                     carry out present
                                     and future financial
                                     obligations, annual
                                     updates, and related
                                     or subsequent
                                     actions/records/
                                     reports, etc.
----------------------------------------------------------------------------------------------------------------
528...............................  Provide third-party                10  1 submission.........              10
                                     indemnity; financial
                                     information/
                                     statements;
                                     additional
                                     information related
                                     to bonds; executed
                                     guarantor agreement
                                     and supporting
                                     information/
                                     documentation/
                                     agreements.
----------------------------------------------------------------------------------------------------------------
528(c)(6); 532(b).................  Guarantor/Surety                    1  1 request............               1
                                     requests BOEM
                                     terminate period of
                                     liability and
                                     notifies lessee or
                                     ROW/RUE grant
                                     holder, etc.
----------------------------------------------------------------------------------------------------------------
* 529.............................  In lieu of surety                   2  1 request............               2
                                     bond, request
                                     authorization to
                                     establish
                                     decommissioning
                                     account, including
                                     pledge of Treasury
                                     securities and any
                                     requirement
                                     commitment of a
                                     stream of revenues.
----------------------------------------------------------------------------------------------------------------
530...............................  Notify BOEM promptly                1  1 notice.............               1
                                     of lapse in bond or
                                     other security/
                                     action filed
                                     alleging lessee,
                                     surety or guarantor
                                     et al is insolvent
                                     or bankrupt.
----------------------------------------------------------------------------------------------------------------
533(a)(2)(ii), (iii)..............  Provide agreement                   3  1 submission.........               3
                                     from surety issuing
                                     new bond to assume
                                     all or portion of
                                     outstanding
                                     liabilities.
----------------------------------------------------------------------------------------------------------------
536(b)............................  Within 10 business                 16  1 demonstration every               8
                                     days following BOEM                    2 years.
                                     notice, lessee,
                                     grant holder, or
                                     surety agrees to and
                                     demonstrates to BOEM
                                     that lease will be
                                     brought into
                                     compliance.
----------------------------------------------------------------------------------------------------------------
    Subtotal.............................................................  19 responses.........              52
----------------------------------------------------------------------------------------------------------------
                                  Subpart F--Plans and Information Requirements
----------------------------------------------------------------------------------------------------------------
Two ** indicate the primary cites for Site Assessment Plans (SAPs), Construction and Operations                0
 Plans (COPs), and General Activities Plans (GAPs); and the burdens include any previous or
 subsequent references throughout part 585 to submission and approval. This subpart contains
 references to other information submissions, approvals, requests, applications, plans, etc.,
 the burdens for which are covered elsewhere in part 585.
----------------------------------------------------------------------------------------------------------------
** 600(a); 601(a), (b); 605 thru    Within time specified             240  2 SAPs...............             480
 614; 238; 810.                      after issuance of a
                                     competitive lease or
                                     grant, or within
                                     time specified after
                                     determination of no
                                     competitive
                                     interest, submit
                                     copies of SAP,
                                     including required
                                     information to
                                     assist BOEM to
                                     comply with NEPA/
                                     CZMA such as hazard
                                     info, air quality,
                                     SEMS, and all
                                     required
                                     information,
                                     certifications,
                                     requests, etc., in
                                     format specified.
----------------------------------------------------------------------------------------------------------------
** 600(b); 601(c), (d)(1); 606(b);  If requesting an                1,000  2 COPs...............           2,000
 618; 620 thru 629; 632; 633; 810.   operations term for
                                     commercial lease,
                                     within time
                                     specified before the
                                     end of site
                                     assessment term,
                                     submit copies of
                                     COP, or FERC license
                                     application,
                                     including required
                                     information to
                                     assist BOEM to
                                     comply with NEPA/
                                     CZMA such as hazard
                                     info, air quality,
                                     SEMS, and all
                                     required
                                     information, surveys
                                     and/or their
                                     results, reports,
                                     certifications,
                                     project easements,
                                     supporting data and
                                     information,
                                     requests, etc., in
                                     format specified.
----------------------------------------------------------------------------------------------------------------
** 600(c); 601(a), (b); 640 thru    Within time specified             240  2 GAP................             480
 648; 651; 238; 810.                 after issuance of a
                                     competitive lease or
                                     grant, or within
                                     time specified after
                                     determination of no
                                     competitive
                                     interest, submit
                                     copies of GAP,
                                     including required
                                     information to
                                     assist BOEM to
                                     comply with NEPA/
                                     CZMA such as hazard
                                     info, air quality,
                                     SEMS, and all
                                     required
                                     information, surveys
                                     and reports,
                                     certifications,
                                     project easements,
                                     requests, etc., in
                                     format specified.
----------------------------------------------------------------------------------------------------------------
** 601(d)(2); 622; 628(f); 632;     Submit revised or                  50  1 revised or modified              50
 634; 658(c)(3); 907.                modified COPs,                         COP.
                                     including project
                                     easements, and all
                                     required additional
                                     information.
----------------------------------------------------------------------------------------------------------------
602 \2\...........................  Until BOEM releases                 2  9 records/submissions              18
                                     financial assurance,
                                     respondents must
                                     maintain, and
                                     provide to BOEM if
                                     requested, all data
                                     and information
                                     related to
                                     compliance with
                                     required terms and
                                     conditions of SAP,
                                     COP, or GAP.
----------------------------------------------------------------------------------------------------------------
** 613(a), (d), (e); 617..........  Submit revised or                  50  1 revised or modified              50
                                     modified SAPs and                      SAP.
                                     required additional
                                     information.
----------------------------------------------------------------------------------------------------------------

[[Page 54255]]

 
612; 647..........................  Submit copy of SAP or               1  2 leases.............               2
                                     GAP consistency
                                     certification and
                                     supporting
                                     documentation,
                                     including
                                     noncompetitive
                                     leases.
----------------------------------------------------------------------------------------------------------------
615(a)............................  Notify BOEM in                      1  2 notices............               2
                                     writing within 30
                                     days of completion
                                     of construction and
                                     installation
                                     activities under SAP.
----------------------------------------------------------------------------------------------------------------
615(b)............................  Submit annual report               30  4 reports............             120
                                     summarizing findings
                                     from site assessment
                                     activities.
----------------------------------------------------------------------------------------------------------------
615(c)............................  Submit annual, or at               40  4 certifications.....             160
                                     other time periods
                                     as BOEM determines,
                                     SAP compliance
                                     certification,
                                     effectiveness
                                     statement,
                                     recommendations,
                                     reports, supporting
                                     documentation, etc.
----------------------------------------------------------------------------------------------------------------
617(a)............................  Notify BOEM in                     10  1 notice.............              10
                                     writing before
                                     conducting any
                                     activities not
                                     approved, or
                                     provided for, in
                                     SAP; provide
                                     additional
                                     information if
                                     requested.
----------------------------------------------------------------------------------------------------------------
627(c)............................  Submit oil spill                  193  1 submission.........             193
                                     response plan
                                     compliant with BSEE
                                     30 CFR part 254.
----------------------------------------------------------------------------------------------------------------
631...............................  Request deviation                   2  1 request............               2
                                     from approved COP
                                     schedule.
----------------------------------------------------------------------------------------------------------------
633(b)............................  Submit annual, or at               50  9 certifications.....             450
                                     other time periods
                                     as BOEM determines,
                                     COP compliance
                                     certification,
                                     effectiveness
                                     statement,
                                     recommendations,
                                     reports, supporting
                                     documentation, etc.
----------------------------------------------------------------------------------------------------------------
634(a)............................  Notify BOEM in                     10  1 notice.............              10
                                     writing before
                                     conducting any
                                     activities not
                                     approved or provided
                                     for in COP, and
                                     provide additional
                                     information if
                                     requested.
----------------------------------------------------------------------------------------------------------------
635...............................  Notify BOEM any time                1  1 notice.............               1
                                     commercial
                                     operations cease
                                     without an approved
                                     suspension.
----------------------------------------------------------------------------------------------------------------
636(a)............................  Notify BOEM in                      1  2 notices............               2
                                     writing no later
                                     than 30 days after
                                     commencing
                                     activities
                                     associated with
                                     placement of
                                     facilities on lease
                                     area.
----------------------------------------------------------------------------------------------------------------
636(b)............................  Notify BOEM in                      1  2 notices............               2
                                     writing no later
                                     than 30 days after
                                     completion of
                                     construction and
                                     installation
                                     activities.
----------------------------------------------------------------------------------------------------------------
636(c)............................  Notify BOEM in                      1  1 notice.............               1
                                     writing at least 7
                                     days before
                                     commencing
                                     commercial
                                     operations.
----------------------------------------------------------------------------------------------------------------
** 642(b); 648; 655; 658(c)(3)....  Submit revised or                  50  1 revised or modified              50
                                     modified GAPs and                      GAP.
                                     required additional
                                     information.
----------------------------------------------------------------------------------------------------------------
651...............................  Before beginning                   30  2 surveys/reports....              60
                                     construction of OCS
                                     facility described
                                     in GAP, complete
                                     survey activities
                                     identified in GAP
                                     and submit initial
                                     findings. [This only
                                     includes the time
                                     involved in
                                     submitting the
                                     findings; it does
                                     not include the
                                     survey time as these
                                     surveys would be
                                     conducted as good
                                     business practice.].
----------------------------------------------------------------------------------------------------------------
653(a)............................  Notify BOEM in                      1  2 notices............               2
                                     writing within 30
                                     days of completing
                                     installation
                                     activities under the
                                     GAP.
----------------------------------------------------------------------------------------------------------------
653(b)............................  Submit annual report               30  4 reports............             120
                                     summarizing findings
                                     from activities
                                     conducted under
                                     approved GAP.
----------------------------------------------------------------------------------------------------------------
653(c)............................  Submit annual, or at               40  4 certifications.....             160
                                     other time periods
                                     as BOEM determines,
                                     GAP compliance
                                     certification,
                                     recommendations,
                                     reports, etc.
----------------------------------------------------------------------------------------------------------------
655(a)............................  Notify BOEM in                     10  1 notice.............              10
                                     writing before
                                     conducting any
                                     activities not
                                     approved or provided
                                     for in GAP, and
                                     provide additional
                                     information if
                                     requested.
----------------------------------------------------------------------------------------------------------------
656...............................  Notify BOEM any time                1  1 notice.............               1
                                     approved GAP
                                     activities cease
                                     without an approved
                                     suspension.
----------------------------------------------------------------------------------------------------------------
658(c)(1).........................  If after                            3  1 notice/evidence....               3
                                     construction, cable
                                     or pipeline deviate
                                     from approved COP or
                                     GAP, notify affected
                                     lease operators and
                                     ROW/RUE grant
                                     holders of deviation
                                     and provide BOEM
                                     evidence of such
                                     notices.
----------------------------------------------------------------------------------------------------------------
659...............................  Determine appropriate              70  5 reports/information             350
                                     air quality modeling
                                     protocol, conduct
                                     air quality
                                     modeling, and submit
                                     3 copies of air
                                     quality modeling
                                     report and 3 sets of
                                     digital files as
                                     supporting
                                     information to plans.
----------------------------------------------------------------------------------------------------------------
    Subtotal.............................................................  69 responses.........           4,789
----------------------------------------------------------------------------------------------------------------
                            Subpart G--Facility Design, Fabrication, and Installation
----------------------------------------------------------------------------------------------------------------
Three *** indicate the primary cites for the reports discussed in this subpart, and the burdens                0
 include any previous or subsequent references throughout part 585 to submitting and obtaining
 approval. This subpart contains references to other information submissions, approvals,
 requests, applications, plans, etc., the burdens for which are covered elsewhere in part 585.
----------------------------------------------------------------------------------------------------------------

[[Page 54256]]

 
*** 700(a)(1), (b), (c); 701......  Submit Facility                   200  1 report.............             200
                                     Design Report,
                                     including copies of
                                     the cover letter,
                                     certification
                                     statement, and all
                                     required information
                                     (1-3 paper or
                                     electronic copies as
                                     specified).
----------------------------------------------------------------------------------------------------------------
*** 700(a)(2); (b), (c); 702......  Submit copies of a                160  1 report.............             160
                                     Fabrication and
                                     Installation Report,
                                     certification
                                     statement and all
                                     required
                                     information, in
                                     format specified.
----------------------------------------------------------------------------------------------------------------
705(a)(3); 707; 712...............  Certified                         100  1 interim report.....             100
                                     Verification Agent
                                     (CVA) conducts
                                     independent
                                     assessment of the
                                     facility design and
                                     submits copies of
                                     all reports/
                                     certifications to
                                     lessee or grant
                                     holder and BOEM--
                                     interim reports if
                                     required, in format
                                     specified.
                                                          ------------------------------------------------------
                                                                      100  1 final report.......             100
----------------------------------------------------------------------------------------------------------------
705(a)(3); 708; 709; 710; 712.....  CVA conducts                      100  1 interim report.....             100
                                     independent
                                     assessments/
                                     inspections on the
                                     fabrication and
                                     installation
                                     activities, informs
                                     lessee or grant
                                     holder if procedures
                                     are changed or
                                     design
                                     specifications are
                                     modified; and
                                     submits copies of
                                     all reports/
                                     certifications to
                                     lessee or grant
                                     holder and BOEM--
                                     interim reports if
                                     required, in format
                                     specified.
                                                          ------------------------------------------------------
                                                                      100  1 final report.......             100
----------------------------------------------------------------------------------------------------------------
*** 703; 705(a)(3); 712; 815......  CVA/project engineer               20  1 interim report.....              20
                                     monitors major
                                     project
                                     modifications and
                                     repairs and submits
                                     copies of all
                                     reports/
                                     certifications to
                                     lessee or grant
                                     holder and BOEM--
                                     interim reports if
                                     required, in format
                                     specified.
                                                          ------------------------------------------------------
                                                                       15  1 final report.......              15
----------------------------------------------------------------------------------------------------------------
705(c)............................  Request waiver of CVA              40  1 waiver.............              40
                                     requirement in
                                     writing; lessee must
                                     demonstrate standard
                                     design and best
                                     practices.
----------------------------------------------------------------------------------------------------------------
706...............................  Submit for approval                16  2 nominations........              32
                                     with SAP, COP, or
                                     GAP, initial
                                     nominations for a
                                     CVA or new
                                     replacement CVA
                                     nomination, and
                                     required information.
----------------------------------------------------------------------------------------------------------------
708(b)(2).........................  Lessee or grant                     1  1 notice.............               1
                                     holder notify BOEM
                                     if modifications
                                     identified by CVA/
                                     project engineer are
                                     accepted.
----------------------------------------------------------------------------------------------------------------
709(a) (14); 710(a)(2), (e) \2\...  Make fabrication                    1  3 records retention..               3
                                     quality control,
                                     installation towing,
                                     and other records
                                     available to CVA/
                                     project engineer for
                                     review (retention
                                     required by Sec.
                                     585.714).
----------------------------------------------------------------------------------------------------------------
713...............................  Notify BOEM within 10               1  1 notice.............               1
                                     business days after
                                     commencing
                                     commercial
                                     operations.
----------------------------------------------------------------------------------------------------------------
714 \2\...........................  Until BOEM releases               100  1 lessee.............             100
                                     financial assurance,
                                     compile, retain, and
                                     make available to
                                     BOEM and/or CVA the
                                     as-built drawings,
                                     design assumptions/
                                     analyses, summary of
                                     fabrication and
                                     installation
                                     examination records,
                                     inspection results,
                                     and records of
                                     repairs not covered
                                     in inspection
                                     report. Record
                                     original and
                                     relevant material
                                     test results of all
                                     primary structural
                                     materials; retain
                                     records during all
                                     stages of
                                     construction.
----------------------------------------------------------------------------------------------------------------
    Subtotal.............................................................  17 responses.........             972
----------------------------------------------------------------------------------------------------------------
 Subpart H--Environmental and Safety Management, Inspections, and Facility Assessments for Activities Conducted
                                           Under SAPs, COPs, and GAPs
----------------------------------------------------------------------------------------------------------------
801(c), (d).......................  Notify BOEM if                      1  2 notices............               2
                                     endangered or
                                     threatened species,
                                     or their designated
                                     critical habitat,
                                     may be in the
                                     vicinity of the
                                     lease or grant or
                                     may be affected by
                                     lease or grant
                                     activities.
----------------------------------------------------------------------------------------------------------------
801(e), (f).......................  Submit information to               6  2 submissions........              12
                                     ensure proposed
                                     activities will be
                                     conducted in
                                     compliance with the
                                     Endangered Species
                                     Act (ESA) and Marine
                                     Mammal Protection
                                     Act (MMPA);
                                     including agreements
                                     and mitigating
                                     measures designed to
                                     avoid or minimize
                                     adverse effects and
                                     incidental take of
                                     endangered species
                                     or critical habitat.
----------------------------------------------------------------------------------------------------------------
802; 902(e).......................  Notify BOEM of                      3  1 notice.............               3
                                     archaeological
                                     resource within 72
                                     hours of discovery.
----------------------------------------------------------------------------------------------------------------
802(b), (c).......................  If requested, conduct              10  1 report.............              10
                                     further
                                     archaeological
                                     investigations and
                                     submit report/
                                     information.
----------------------------------------------------------------------------------------------------------------
802(d)............................  If applicable, submit              .5  1 payment............               1
                                     payment for BOEM
                                     costs in carrying
                                     out National
                                     Historic
                                     Preservation Act
                                     responsibilities.
----------------------------------------------------------------------------------------------------------------
803...............................  If required, conduct               15  2 survey/report......              30
                                     additional surveys
                                     to define boundaries
                                     and avoidance
                                     distances and submit
                                     report.
----------------------------------------------------------------------------------------------------------------
*** 810; 614; 627; 632(b); 651....  Submit safety                      35  2 submissions........              70
                                     management system
                                     description with the
                                     SAP, COP, or GAP.
----------------------------------------------------------------------------------------------------------------

[[Page 54257]]

 
813(b)(1).........................  Report within 24                   .5  2 reports............               1
                                     hours when any
                                     required equipment
                                     taken out of service
                                     for more than 12
                                     hours; provide
                                     written confirmation
                                     if reported orally.
                                                          ------------------------------------------------------
                                                                        1  1 written                           1
                                                                            confirmation.
----------------------------------------------------------------------------------------------------------------
813(b)(3).........................  Notify BOEM when                   .5  2 notices............               1
                                     equipment returned
                                     to service; provide
                                     written confirmation
                                     if reported orally.
----------------------------------------------------------------------------------------------------------------
815(c)............................  When required,                      2  1 report.............               2
                                     analyze cable, P/L,
                                     or facility damage
                                     or failures to
                                     determine cause and
                                     as soon as available
                                     submit comprehensive
                                     written report.
----------------------------------------------------------------------------------------------------------------
816...............................  Submit plan of                      2  1 plan/report........               2
                                     corrective action
                                     report on observed
                                     detrimental effects
                                     on cable, P/L, or
                                     facility within 30
                                     days of discovery;
                                     take remedial action
                                     and submit report of
                                     remedial action
                                     within 30 days after
                                     completion.
----------------------------------------------------------------------------------------------------------------
822(a)(2) (iii), (b)..............  Maintain records of                 1  4 records retention..               4
                                     design,
                                     construction,
                                     operation,
                                     maintenance,
                                     repairs, and
                                     investigation on or
                                     related to lease or
                                     ROW/RUE area; make
                                     available to BOEM
                                     for inspection.
----------------------------------------------------------------------------------------------------------------
823...............................  Request reimbursement               2  1 request............               2
                                     within 90 days for
                                     food, quarters, and
                                     transportation
                                     provided to BOEM
                                     reps during
                                     inspection.
----------------------------------------------------------------------------------------------------------------
824(a) \ 2\.......................  Develop annual self-               24  2 plans..............              48
                                     inspection plan
                                     covering all
                                     facilities; retain
                                     with records, and
                                     make available to
                                     BOEM upon request.
----------------------------------------------------------------------------------------------------------------
824(b)............................  Conduct annual self-               36  2 reports............              72
                                     inspection and
                                     submit report by
                                     November 1.
----------------------------------------------------------------------------------------------------------------
825...............................  Based on API RP 2A-                60  2 assessments/actions             120
                                     WSD, perform
                                     assessment of
                                     structures, initiate
                                     mitigation actions
                                     for structures that
                                     do not pass
                                     assessment process,
                                     retain information,
                                     and make available
                                     to BOEM upon request.
----------------------------------------------------------------------------------------------------------------
830(a), (c); 831 thru 833.........  Immediately report            Oral .5  2 incidents..........               1
                                     incidents to BOEM
                                     via oral
                                     communications,
                                     submit written
                                     follow-up report
                                     within 15 business
                                     days after the
                                     incident, and submit
                                     any required
                                     additional
                                     information.
                                                          ------------------------------------------------------
                                                                Written 4  1 incident...........               4
----------------------------------------------------------------------------------------------------------------
830(d)............................  Report oil spills as                2  1....................               2
                                     required by BSEE 30
                                     CFR part 254.
----------------------------------------------------------------------------------------------------------------
    Subtotal.............................................................  33 responses.........             388
----------------------------------------------------------------------------------------------------------------
                                           Subpart I--Decommissioning
----------------------------------------------------------------------------------------------------------------
Four **** indicate the primary cites for the reports discussed in this subpart, and the burdens include any
 previous or subsequent references throughout part 585 to submitting and obtaining approval. This subpart
 contains references to other information submissions, approvals, requests, applications, plans, etc., the
 burdens for which are covered elsewhere in part 585.
----------------------------------------------------------------------------------------------------------------
**** 902; 905, 906; 907; 908(c);    Submit for approval,               20  1 application........              20
 909.                                in format specified,
                                     copies of the SAP,
                                     COP, or GAP
                                     decommissioning
                                     application and site
                                     clearance plan at
                                     least 2 years before
                                     decommissioning
                                     activities begin, 90
                                     days after
                                     completion of
                                     activities, or 90
                                     days after
                                     cancellation,
                                     relinquishment, or
                                     other termination of
                                     lease or grant.
                                     Include
                                     documentation of
                                     coordination efforts
                                     w/States/CZMA
                                     agencies, local or
                                     tribal governments,
                                     requests that
                                     certain facilities
                                     remain in place for
                                     other activities, be
                                     converted to an
                                     artificial reef, or
                                     be toppled in place.
                                     Submit additional
                                     information/evidence
                                     requested or modify
                                     and resubmit
                                     application.
----------------------------------------------------------------------------------------------------------------
902(d); 908;......................  Notify BOEM at least                1  1 notice.............               1
                                     60 days before
                                     commencing
                                     decommissioning
                                     activities.
----------------------------------------------------------------------------------------------------------------
910...............................  Within 60 days after                1  1 verification.......               1
                                     removing a facility,
                                     verify to BOEM that
                                     site is cleared.
----------------------------------------------------------------------------------------------------------------
912...............................  Within 60 days after                8  1 report.............               8
                                     removing a facility,
                                     cable, or pipeline,
                                     submit a written
                                     report.
----------------------------------------------------------------------------------------------------------------
BOEM does not anticipate decommissioning activities for at least 5 years so the requirements have been given a
 minimal burden.
----------------------------------------------------------------------------------------------------------------
    Subtotal.............................................................  4 responses..........              30
----------------------------------------------------------------------------------------------------------------
             Subpart J--RUEs for Energy- and Marine-Related Activities Using Existing OCS Facilities
----------------------------------------------------------------------------------------------------------------
1004, 1005, 1006..................  Contact owner of                    1  1 request............               1
                                     existing facility
                                     and/or lessee of the
                                     area to reach
                                     preliminary
                                     agreement to use
                                     facility and obtain
                                     concurring
                                     signatures; submit
                                     request to BOEM for
                                     an alternative use
                                     RUE, including all
                                     required information/
                                     modifications.
----------------------------------------------------------------------------------------------------------------

[[Page 54258]]

 
1007(a), (b), (c).................  Submit indication of                4  1 submission.........               4
                                     competitive interest
                                     in response to
                                     Federal Register
                                     notice.
----------------------------------------------------------------------------------------------------------------
1007(c)...........................  Submit description of               5  1 submission.........               5
                                     proposed activities
                                     and required
                                     information in
                                     response to Federal
                                     Register notice of
                                     competitive offering.
----------------------------------------------------------------------------------------------------------------
1007(f)...........................  Lessee or owner of                  1  1 submission.........               1
                                     facility submits
                                     decision to accept
                                     or reject proposals
                                     deemed acceptable by
                                     BOEM.
----------------------------------------------------------------------------------------------------------------
1010(c)...........................  Request renewal of                  6  1 request............               6
                                     Alternate Use RUE.
----------------------------------------------------------------------------------------------------------------
1012; 1016(b).....................  Provide financial                   1  1 submission.........               1
                                     assurance as BOEM
                                     determines in
                                     approving RUE for an
                                     existing facility,
                                     including additional
                                     security if required.
----------------------------------------------------------------------------------------------------------------
1013..............................  Submit request for                  1  1 request............               1
                                     assignment of an
                                     alternative use RUE
                                     for an existing
                                     facility, including
                                     all required
                                     information.
----------------------------------------------------------------------------------------------------------------
1015..............................  Request                             1  1 request............               1
                                     relinquishment of
                                     RUE for an existing
                                     facility.
----------------------------------------------------------------------------------------------------------------
    Subtotal.............................................................  8 responses..........              20
----------------------------------------------------------------------------------------------------------------
    Total Burden.........................................................  265 Responses........          18,783
                                   -----------------------------------------------------------------------------
                                       $3,816,000 Non-Hour Cost Burdens
----------------------------------------------------------------------------------------------------------------
\1\ In the future, BOEM may require electronic filing of certain submissions.
\2\ Retention of these records is usual and customary business practice; the burden is primarily to make them
  available to BOEM and CVAs.

    An agency may not conduct or sponsor, and a person is not required 
to respond to, a collection of information unless it displays a valid 
OMB control number.
    The authority for this action is the Paperwork Reduction Act of 
1995 (44 U.S.C. 3501 et seq.).

Karen Thundiyil,
Chief, Office of Regulations, Bureau of Ocean Energy Management.
[FR Doc. 2022-19043 Filed 9-1-22; 8:45 am]
BILLING CODE 4310-MR-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on September 2, 2022.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.