Notice2022-16708
Transcontinental Gas Pipe Line Company, LLC; Notice of Availability of the Final Environmental Impact Statement for the Proposed Regional Energy Access Expansion
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
August 4, 2022
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 87 Issue 149 (Thursday, August 4, 2022)</title>
</head>
<body><pre>
[Federal Register Volume 87, Number 149 (Thursday, August 4, 2022)]
[Notices]
[Pages 47741-47742]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2022-16708]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP21-94-000]
Transcontinental Gas Pipe Line Company, LLC; Notice of
Availability of the Final Environmental Impact Statement for the
Proposed Regional Energy Access Expansion
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared a final environmental impact statement (EIS)
for the Regional Energy Access Expansion (Project), proposed by
Transcontinental Gas Pipe Line Company, LLC (Transco) in the above-
referenced docket. Transco requests authorization to construct and
operate approximately 36.0 miles of pipeline loop \1\ and one new
compressor station, abandon and replace certain existing compression
facilities, and modify existing compressor stations and facilities in
Pennsylvania and New Jersey to provide about 829 million standard cubic
feet of natural gas per day to multiple delivery points along Transco's
existing system in Pennsylvania, New Jersey, and Maryland, providing
customers with enhanced access to Marcellus and Utica Shale natural gas
supplies.
---------------------------------------------------------------------------
\1\ A pipeline loop is a segment of pipe constructed parallel to
an existing pipeline to increase capacity.
---------------------------------------------------------------------------
The final EIS assesses the potential environmental effects of the
construction and operation of the Project in accordance with the
requirements of the National Environmental Policy Act (NEPA). The FERC
staff concludes that approval of the proposed Project, with the
mitigation measures recommended in the EIS, would result in some
adverse environmental impacts; however, with the exception of climate
change impacts, those impacts would not be significant. Construction
and operation of the Project would increase the atmospheric
concentration of greenhouse gases (GHG), in combination with past,
current, and future emissions from all other sources globally and would
contribute incrementally to future climate change impacts. The EIS does
not characterize the Project's GHG emissions as significant or
insignificant because the Commission is conducting a generic proceeding
to determine whether and how the Commission will conduct climate change
significance determinations going forward.
The U.S. Environmental Protection Agency and U.S. Army Corps of
Engineers participated as cooperating agencies in the preparation of
the EIS. Cooperating agencies have jurisdiction by law or special
expertise with respect to resources potentially affected by the
proposal and participate in the NEPA analysis. The EIS is intended to
fulfill the cooperating federal agencies' NEPA obligations, as
applicable, and to support subsequent conclusions and decisions made by
the cooperating agencies. Although cooperating agencies provide input
to the conclusions and recommendations presented in the final EIS, the
agencies may present their own conclusions and recommendations in any
applicable Records of Decision for the Project.
The final EIS addresses the potential environmental effects of the
construction and operation of the following Project facilities:
<bullet> installation of 22.2 miles of 30-inch-diameter pipeline
loop in Luzerne County, Pennsylvania (Regional Energy Lateral);
<bullet> installation of 13.8 miles of 42-inch-diameter pipeline
loop in Monroe County, Pennsylvania (Effort Loop);
<bullet> installation of the new electric-motor driven Compressor
Station 201 (9,000 nominal horsepower [hp] at International
Organization of Standardization [ISO] conditions) in Gloucester County,
New Jersey);
<bullet> installation of two gas turbine driven compressor units
(31,800 nominal hp at ISO conditions) at existing Compressor Station
505 in Somerset County, New Jersey to accommodate the abandonment and
replacement of approximately 16,000 hp from eight existing internal
combustion engine-driven compressor units and increase the certificated
station compression by 15,800 hp;
<bullet> installation of a gas turbine compressor unit (63,742
nominal hp at ISO conditions) and modifications to three existing
compressors at existing Compressor Station 515 in Luzerne County,
Pennsylvania to accommodate the abandonment and replacement of
approximately 17,000 hp from five existing gas-fired reciprocating
engine driven compressors and increase the certificated station
compression by 46,742 hp;
<bullet> uprate and rewheel two existing electric motor-driven
compressor units at existing Compressor Station 195 in York County,
Pennsylvania to increase the certificated station compression by 5,000
hp and accommodate the abandonment of two existing gas-fired
reciprocating engine driven compressors, which total approximately
8,000 hp;
<bullet> installation of piping modifications at existing
Compressor Station 200 in Chester County, Pennsylvania to support south
flow of natural gas;
<bullet> uprate one existing electric motor-driven compressor unit
at existing Compressor Station 207 in Middlesex County, New Jersey to
increase the certificated station compression by 4,100 hp;
<bullet> modifications at existing compressor stations, meter
stations, interconnects, and ancillary facilities in Pennsylvania, New
Jersey, and Maryland; and
<bullet> installation of ancillary facilities such as mainline
valves, communication facilities, and pig launchers \2\ and receivers.
---------------------------------------------------------------------------
\2\ A ``pig'' is a tool that the pipeline company inserts into
and pushes through the pipeline for cleaning the pipeline,
conducting internal inspections, or other purposes.
---------------------------------------------------------------------------
The Commission mailed a copy of the Notice of Availability of the
final EIS to federal, state, and local government representatives and
agencies; elected officials; environmental and public interest groups;
Native American tribes; potentially affected landowners and other
interested individuals and groups; and newspapers and libraries in the
Project area. The final EIS is only available in electronic format. It
may be viewed and downloaded from the FERC's website (<a href="http://www.ferc.gov">www.ferc.gov</a>), on
the natural gas environmental documents page (<a href="https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents">https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents</a>). In
addition, the final EIS may be accessed by using
[[Page 47742]]
the eLibrary link on the FERC's website. Click on the eLibrary link
(<a href="https://elibrary.ferc.gov/eLibrary/search">https://elibrary.ferc.gov/eLibrary/search</a>) select ``General Search''
and enter the docket number in the ``Docket Number'' field, excluding
the last three digits (i.e., CP21-94). Be sure you have selected an
appropriate date range. For assistance, please contact FERC Online
Support at <a href="/cdn-cgi/l/email-protection#662003140529080a0f080335131616091412260003140548010910"><span class="__cf_email__" data-cfemail="b3f5d6c1d0fcdddfdaddd6e0c6c3c3dcc1c7f3d5d6c1d09dd4dcc5">[email protected]</span></a> or toll free at (866) 208-3676,
or for TTY, contact (202) 502-8659.
The final EIS is not a decision document. It presents Commission
staff's independent analysis of the environmental issues for the
Commission to consider when addressing the merits of all issues in this
proceeding. Additional information about the Project is available from
the Commission's Office of External Affairs, at (866) 208-FERC, or on
the FERC website (<a href="http://www.ferc.gov">www.ferc.gov</a>) using the eLibrary link. The eLibrary
link also provides access to the texts of all formal documents issued
by the Commission, such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription that allows you to keep track of all formal issuances and
submittals in specific dockets. This can reduce the amount of time you
spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to <a href="https://www.ferc.gov/ferc-online/overview">https://www.ferc.gov/ferc-online/overview</a> to
register for eSubscription.
Dated: July 29, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-16708 Filed 8-3-22; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on August 4, 2022.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.