Notice2022-16592

Energy Stream, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
August 3, 2022

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 87 Issue 148 (Wednesday, August 3, 2022)</title>
</head>
<body><pre>
[Federal Register Volume 87, Number 148 (Wednesday, August 3, 2022)]
[Notices]
[Pages 47410-47411]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2022-16592]



[[Page 47410]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 5679-041]


Energy Stream, LLC; Notice of Application Tendered for Filing 
With the Commission and Soliciting Additional Study Requests and 
Establishing Procedural Schedule for Relicensing and a Deadline for 
Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Subsequent Minor License.
    b. Project No.: 5679-041.
    c. Date Filed: July 15, 2022.
    d. Applicant: Energy Stream, LLC.
    e. Name of Project: M.S.C. Power Project.
    f. Location: On the Quinebaug River in Windham County, Connecticut. 
The project does not occupy any federal land.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Rolland Zeleny, Energy Stream, LLC, 18 
Washington St., Suite 18, Canton, MA 02021; Phone at (603) 498-8089, or 
email at <a href="/cdn-cgi/l/email-protection#b8d1d6dcd1dfd7d0d9cadad7caf8c1d9d0d7d796dbd7d5"><span class="__cf_email__" data-cfemail="5930373d303e3631382b3b362b192038313636773a3634">[email&#160;protected]</span></a>.
    i. FERC Contact: Robert Haltner at (202) 502-8612, or 
<a href="/cdn-cgi/l/email-protection#f3819c91968187dd9b929f879d9681b395968190dd949c85"><span class="__cf_email__" data-cfemail="a0d2cfc2c5d2d48ec8c1ccd4cec5d2e0c6c5d2c38ec7cfd6">[email&#160;protected]</span></a>.
    j. Cooperating agencies: Federal, state, local, and tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item l below. Cooperating agencies should note 
the Commission's policy that agencies that cooperate in the preparation 
of the environmental document cannot also intervene. See 94 FERC ] 
61,076 (2001).
    k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's 
regulations, if any resource agency, Indian Tribe, or person believes 
that an additional scientific study should be conducted in order to 
form an adequate factual basis for a complete analysis of the 
application on its merit, the resource agency, Indian Tribe, or person 
must file a request for a study with the Commission not later than 60 
days from the date of filing of the application, and serve a copy of 
the request on the applicant.
    l. Deadline for filing additional study requests and requests for 
cooperating agency status: September 13, 2022.
    The Commission strongly encourages electronic filing. Please file 
additional study requests and requests for cooperating agency status 
using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. For assistance, please contact FERC Online Support at 
<a href="/cdn-cgi/l/email-protection#afe9eafdece0c1c3c6c1cafcdadfdfc0dddbefc9caddcc81c8c0d9"><span class="__cf_email__" data-cfemail="85c3c0d7c6caebe9ecebe0d6f0f5f5eaf7f1c5e3e0f7e6abe2eaf3">[email&#160;protected]</span></a>, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy. 
Submissions sent via the U.S. Postal Service must be addressed to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via 
any other carrier must be addressed to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, 
MD 20852. All filings must clearly identify the project name and docket 
number on the first page: M.S.C. Power Project (P-5679-041).
    m. The application is not ready for environmental analysis at this 
time.
    n. Project Description: The existing M.S.C. Project consists of: 
(1) an approximately 256-foot-long, 14.3-foot-high granite block and 
concrete dam that includes: (a) an approximately 35-foot-long headgate 
structure with four aluminum sluice gates that are each 4 feet wide by 
10 feet high; (b) a 109-foot-long granite block spillway section with a 
concrete cap, 1.6-foot-high flashboards, and a crest elevation of 
288.74 feet mean sea level (msl) at the top of the flashboards; and (c) 
a 112-foot-long auxiliary concrete gravity spillway section with a 
crest elevation of 288.94 feet msl; (2) an impoundment with a surface 
area of 4.7 acres at an elevation of 288.74 feet msl; (3) an 
approximately 30-foot-wide, 25-foot-long stone and concrete forebay 
downstream of the headgate structure; (4) an intake structure at the 
downstream end of the forebay with a 19-foot-wide, 16.5-foot-high 
trashrack with 1.6-inch clear bar spacing; (5) a 2-foot-wide, 3-foot-
high trash sluice gate adjacent to the trashrack; (6) a 21-foot-long, 
33-foot-wide steel and reinforced concrete powerhouse containing a 400-
kilowatt (kW) Kaplan turbine-generator unit and a 112-kW Francis 
turbine-generator unit, for a total installed capacity of 512 kW; (7) a 
39-foot-long, 28-foot-wide, 10-foot-deep tailrace; (8) 50-foot-long, 
2.4-kilovolt (kV) lead lines that connect the generators to three 2.4/
23-kV step-up transformers, and a 200-foot-long, 13.8-kV transmission 
line that connects the transformers to the regional grid; and (9) 
appurtenant facilities. The project creates an approximately 65-foot-
long bypassed reach of the Quinebaug River.
    Article 401 of the current license requires Energy Stream, LLC to 
operate the project in a run-of-river mode, such that project outflow 
approximates inflow. Energy Stream, LLC maintains the impoundment at 
the flashboard crest elevation of 288.74 feet msl. To protect aquatic 
resources, Article 26 of the current license requires Energy Stream, 
LLC to release a continuous minimum flow of 144 cubic feet per second 
(cfs) or inflow to the impoundment, whichever is less, as measured 
immediately below the tailrace. Article 402 of the current license 
specifies seasonal minimum flow releases to the downstream reach when 
refilling the impoundment following emergency or maintenance drawdowns, 
including 90 percent of impoundment inflow.
    Article 404 of the current license requires Energy Stream, LLC to 
provide upstream and downstream passage for American eels. Upstream 
passage for American eels is provided from June 15 to September 1 by 
netting placed over the dam and ramps extending to the crest of the 
flashboards. Downstream American eel passage is provided from September 
1 through November 15, on rainy nights and three nights after rain 
events through a notch in the flashboards located on the west side of 
the spillway, and a low-level outlet gate.
    The minimum and maximum hydraulic capacities of the powerhouse are 
40 and 545 cfs, respectively. The average annual generation of the 
project was approximately 2,885 megawatt-hours from 2017 through 2021.
    Energy Stream, LLC is not proposing any changes to project 
facilities or operation.
    o. In addition to publishing the full text of this notice in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this notice, as well 
as other documents in the proceeding (e.g., license application) via 
the internet through the Commission's Home Page (<a href="http://www.ferc.gov">http://www.ferc.gov</a>) 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document (P-
5679). For assistance, contact FERC at <a href="/cdn-cgi/l/email-protection#df999a8d9c90b1b3b6b1ba8caaafafb0adab9fb9baadbcf1b8b0a9"><span class="__cf_email__" data-cfemail="64222136272b0a080d0a01371114140b161024020116074a030b12">[email&#160;protected]</span></a> or 
call toll-free, (866) 208-3676 or (202) 502-8659 (TTY).
    You may also register online at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a> to be notified via email of new filings and issuances 
related to this or other pending projects.

[[Page 47411]]

For assistance, contact FERC Online Support.
    p. Procedural Schedule: The application will be processed according 
to the following preliminary schedule. Revisions to the schedule will 
be made as appropriate.

Issue Deficiency Letter (if necessary) September 2022
Request Additional Information September 2022
Issue Scoping Document 1 for comments December 2022
Request Additional Information (if necessary) December 2022
Issue Acceptance Letter December 2022
Issue Scoping Document 2 (if necessary) February 2023
Issue Notice of Ready for Environmental Analysis February 2023

    q. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: July 28, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-16592 Filed 8-2-22; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on August 3, 2022.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.