Notice2022-16350

Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Southside Reliability Enhancement Project, Request for Comments on Environmental Issues, and Schedule for Environmental Review

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
August 1, 2022

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 87 Issue 146 (Monday, August 1, 2022)</title>
</head>
<body><pre>
[Federal Register Volume 87, Number 146 (Monday, August 1, 2022)]
[Notices]
[Pages 46953-46955]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2022-16350]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP22-461-000]


Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To 
Prepare an Environmental Impact Statement for the Proposed Southside 
Reliability Enhancement Project, Request for Comments on Environmental 
Issues, and Schedule for Environmental Review

    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental impact statement (EIS) that 
will discuss the environmental impacts of the Southside Reliability 
Enhancement Project (Project) involving construction and operation of 
facilities by Transcontinental Gas Pipe Line Company, LLC (Transco) in 
Virginia and North Carolina. The Commission will use this EIS in its 
decision-making process to determine whether the Project is in the 
public convenience and necessity. The schedule for preparation of the 
EIS is discussed in the Schedule for Environmental Review section of 
this notice.
    As part of the National Environmental Policy Act (NEPA) review 
process, the Commission takes into account concerns the public may have 
about proposals and the environmental impacts that could result 
whenever it considers the issuance of a Certificate of Public 
Convenience and Necessity. This gathering of public input is referred 
to as ``scoping.'' By notice issued on December 15, 2021, in Docket No. 
PF22-1-000, the Commission opened a scoping period during Transco's 
planning process for the Project and prior to filing a formal 
application with the Commission, a process referred to as ``pre-
filing.'' Transco has now filed an application with the Commission, and 
staff intends to prepare an EIS that will address the concerns raised 
during the pre-filing scoping process and in response to this notice.
    By this notice, the Commission requests public comments on the 
scope of issues to address in the environmental document, including 
comments on potential alternatives and impacts, and any relevant 
information, studies, or analyses of any kind concerning impacts 
affecting the quality of the human environment. To ensure that your 
comments are timely and properly recorded, please submit your comments 
so that the Commission receives them in Washington, DC on or before 
5:00 p.m. Eastern Time on August 24, 2022. Comments may be submitted in 
written form. Further details on how to submit comments are provided in 
the Public Participation section of this notice.
    As mentioned above, during the pre-filing process, the Commission 
opened a scoping period which expired on January 14, 2022; however, 
Commission staff continued to accept comments during the entire pre-
filing process. Staff also held one virtual scoping session to take 
oral scoping comments. The session was held via teleconference on 
January 5, 2022. All substantive written and oral comments provided 
during pre-filing will be addressed in the EIS. Therefore, if you 
submitted comments on this Project to the Commission during the pre-
filing process in Docket No. PF22-1-000 you do not need to file those 
comments again.
    If you are a landowner receiving this notice, a pipeline company 
representative may contact you about the acquisition of an easement to 
construct, operate, and maintain the proposed facilities. The company 
would seek to negotiate a mutually acceptable easement agreement. You 
are not required to enter into an agreement. However, if the Commission 
approves the Project, the Natural Gas Act conveys the right of eminent 
domain to the company. Therefore, if you and the company do not reach 
an easement agreement, the pipeline company could initiate condemnation 
proceedings in court. In such instances, compensation would be 
determined by a judge in accordance with state law. The Commission does 
not grant, exercise, or oversee the exercise of eminent domain 
authority. The courts have exclusive authority to handle eminent domain 
cases; the Commission has no jurisdiction over these matters.
    Transco provided landowners with a fact sheet prepared by the FERC 
entitled ``An Interstate Natural Gas Facility On My Land? What Do I 
Need To Know?'' which addresses typically asked questions, including 
the use of eminent domain and how to participate in the Commission's 
proceedings. This fact sheet along with other landowner topics of 
interest are available for viewing on the FERC website (<a href="http://www.ferc.gov">www.ferc.gov</a>) 
under the Natural Gas Questions or Landowner Topics link.

Public Participation

    There are three methods you can use to submit your comments to the 
Commission. The Commission encourages electronic filing of comments and 
has staff available to assist you at (866) 208-3676 or 
<a href="/cdn-cgi/l/email-protection#aceac9decfe3c2c0c5c2c9ffd9dcdcc3ded8eccac9decf82cbc3da"><span class="__cf_email__" data-cfemail="a3e5c6d1c0eccdcfcacdc6f0d6d3d3ccd1d7e3c5c6d1c08dc4ccd5">[email&#160;protected]</span></a>. Please carefully follow these instructions 
so that your comments are properly recorded.
    (1) You can file your comments electronically using the eComment 
feature, which is located on the Commission's website (<a href="http://www.ferc.gov">www.ferc.gov</a>) 
under the link to FERC Online. Using eComment is an easy method for 
submitting brief, text-only comments on a project;
    (2) You can file your comments electronically by using the eFiling 
feature, which is also located on the Commission's website 
(<a href="http://www.ferc.gov">www.ferc.gov</a>) under the link to FERC Online. With eFiling, you can 
provide comments in a variety of formats by attaching them as a file 
with your submission. New eFiling users must first create an account by 
clicking on ``eRegister.'' You will be asked to select the type of 
filing you are making; a comment on a particular project is considered 
a ``Comment on a Filing''; or
    (3) You can file a paper copy of your comments by mailing them to 
the Commission. Be sure to reference the project docket number (CP22-
461-000) on your letter. Submissions sent via the U.S. Postal Service 
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 
20426. Submissions sent via any other carrier must be addressed to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 
12225 Wilkins Avenue, Rockville, Maryland 20852.
    Additionally, the Commission offers a free service called 
eSubscription. This service provides automatic notification of filings 
made to subscribed dockets, document summaries, and direct links to the 
documents. Go to <a href="https://www.ferc.gov/ferc-online/overview">https://www.ferc.gov/ferc-online/overview</a> to register 
for eSubscription.

Summary of the Proposed Project, the Project Purpose and Need, and 
Expected Impacts

    Transco proposes to construct and operate one new compressor 
station and modify two existing compressor stations and three existing 
meter stations in North Carolina and Virginia. The Project would 
provide 160,000 dekatherms per day (Dth/d) of incremental firm 
transportation capacity from Transco's

[[Page 46954]]

Compressor Station 165 in Pittsylvania County, Virginia and 263,400 
Dth/d from the Pine Needle liquified natural gas storage facility to 
delivery points in North Carolina. Transco's stated purpose of the 
additional capacity is to reduce supply constraints when natural gas 
demand is the highest, support overall reliability and diversification 
of energy infrastructure in the mid-Atlantic, and benefit the public by 
promoting competitive markets and increasing the security of natural 
gas supplies to major delivery points serving the mid-Atlantic.
    The Project would consist of the following facilities:
    <bullet> installation of a new compressor station (Compressor 
Station 168) which includes one new 33,000 horsepower electric motor-
driven compressor unit, and installation of new mainline valves on 
South Virginia Lateral A-Line and B-Line at the new Compressor Station 
168 in Mecklenburg County, Virginia;
    <bullet> addition of one 16,000 horsepower electric motor-driven 
compressor unit at existing Compressor Station 166 in Pittsylvania 
County, Virginia;
    <bullet> installation of piping modifications to allow for flow 
reversal at existing Compressor Station 155 in Davidson County, North 
Carolina;
    <bullet> replacement of one meter run to increase delivery volumes 
at the existing Ahoskie Meter Station in Hertford County, North 
Carolina;
    <bullet> installation of new facilities to increase delivery 
volumes at the existing Pleasant Hill Meter Station in Northampton 
County, North Carolina; and
    <bullet> upgrade meter and controls and debottleneck piping at the 
existing Iredell Meter Station in Iredell County, North Carolina.
    The general location of the proposed Project facilities is shown in 
appendix 1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice will not appear in 
the Federal Register. Copies of the appendices were sent to all 
those receiving this notice in the mail and are available at 
<a href="http://www.ferc.gov">www.ferc.gov</a> using the link called ``eLibrary''. For instructions on 
connecting to eLibrary, refer to the last page of this notice. At 
this time, the Commission has suspended access to the Commission's 
Public Reference Room due to the proclamation declaring a National 
Emergency concerning the Novel Coronavirus Disease (COVID-19), 
issued by the President on March 13, 2020. For assistance, contact 
FERC at <a href="/cdn-cgi/l/email-protection" class="__cf_email__" data-cfemail="32747760717d5c5e5b5c57614742425d404672545740511c555d44">[email&#160;protected]</a> or call toll free, (886) 208-3676 
or TTY (202) 502-8659.
---------------------------------------------------------------------------

    Based on the environmental information provided by Transco, 
construction and modification of the proposed facilities would disturb 
about 122 acres of land, which includes temporary construction 
workspace, permanent aboveground facility areas, and permanent access 
roads. Following construction, Transco would maintain about 119 acres 
for permanent operation of the Project's facilities; the remaining 3 
acres would be restored and revert to former uses.
    Based on an initial review of Transco's proposal and public 
comments received during the pre-filing process, Commission staff have 
identified several expected impacts that will be addressed in the EIS. 
The Project would impact agricultural, pasture, forest, open, 
residential, and industrial land uses. Further, the EIS will describe 
impacts on environmental justice communities, federally and state-
listed species, air quality, climate change, and connected actions/
cumulative impacts. The Project would not directly impact any wetlands 
or waterbodies.

The NEPA Process and the EIS

    The EIS issued by the Commission will discuss impacts that could 
occur as a result of the construction and operation of the proposed 
Project under the relevant general resource areas:
    <bullet> geology and soils;
    <bullet> water resources and wetlands;
    <bullet> vegetation and wildlife;
    <bullet> threatened and endangered species;
    <bullet> cultural resources;
    <bullet> land use;
    <bullet> air quality and noise;
    <bullet> climate change;
    <bullet> cumulative impacts; and
    <bullet> reliability and safety.
    Commission staff will also make recommendations on how to lessen or 
avoid impacts on the various resource areas. Your comments will help 
Commission staff focus its analysis on the issues that may have a 
significant effect on the human environment.
    The EIS will present Commission staff's independent analysis of the 
issues. Staff will prepare a draft EIS which will be issued for public 
comment. Commission staff will consider all timely comments received 
during the comment period on the draft EIS and revise the document, as 
necessary, before issuing a final EIS. Any draft and final EIS will be 
available in electronic format in the public record through eLibrary 
\2\ and the Commission's natural gas environmental documents web page 
(<a href="https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents">https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents</a>). If eSubscribed, you will receive instant 
email notification when the environmental document is issued.
---------------------------------------------------------------------------

    \2\ For instructions on connecting to eLibrary, refer to the 
last page of this notice.
---------------------------------------------------------------------------

Alternatives Under Consideration

    The EIS will evaluate reasonable alternatives that are technically 
and economically feasible and meet the purpose and need for the 
proposed action.\3\ Alternatives currently under consideration include:
---------------------------------------------------------------------------

    \3\ 40 CFR 1508.1(z).
---------------------------------------------------------------------------

    <bullet> the no-action alternative, meaning the Project is not 
implemented;
    <bullet> existing and proposed natural gas pipeline system 
alternatives; and
    <bullet> alternative locations for new aboveground facilities.
    With this notice, the Commission requests specific comments 
regarding any additional potential alternatives to the proposed action 
or segments of the proposed action. Please focus your comments on 
reasonable alternatives (including alternative facility sites) that 
meet the Project objectives, are technically and economically feasible, 
and avoid or lessen environmental impact.

Consultation Under Section 106 of the National Historic Preservation 
Act

    In accordance with the Advisory Council on Historic Preservation's 
implementing regulations for section 106 of the National Historic 
Preservation Act, the Commission initiated section 106 consultation for 
the Project in the notice issued on December 15, 2021, with the 
applicable State Historic Preservation Office(s), and other government 
agencies, interested Indian tribes, and the public to solicit their 
views and concerns regarding the Project's potential effects on 
historic properties.\4\ This notice is a continuation of section 106 
consultation for the Project. The Project EIS will document findings on 
the impacts on historic properties and summarize the status of 
consultations under section 106.
---------------------------------------------------------------------------

    \4\ The Advisory Council on Historic Preservation's regulations 
are at Title 36, Code of Federal Regulations, Part 800. Those 
regulations define historic properties as any prehistoric or 
historic district, site, building, structure, or object included in 
or eligible for inclusion in the National Register of Historic 
Places.
---------------------------------------------------------------------------

Schedule for Environmental Review

    On June 7, 2022, the Commission issued its Notice of Application 
for the Project. Among other things, that notice alerted other agencies 
issuing federal authorizations of the requirement to complete all 
necessary reviews and to reach a final decision on the request for a 
federal authorization within 90 days of the date of issuance of the 
Commission staff's final EIS for the Project. This notice identifies 
the Commission staff's planned schedule for completion of the

[[Page 46955]]

final EIS for the Project, which is based on an issuance of the draft 
EIS in October 2022.

Issuance of Notice of Availability of the final EIS--(February 24, 
2023)
90-day Federal Authorization Decision Deadline \5\--(May 25, 2023)
---------------------------------------------------------------------------

    \5\ The Commission's deadline applies to the decisions of other 
federal agencies, and state agencies acting under federally 
delegated authority, that are responsible for federal 
authorizations, permits, and other approvals necessary for proposed 
projects under the Natural Gas Act. Per 18 CFR 157.22(a), the 
Commission's deadline for other agency's decisions applies unless a 
schedule is otherwise established by federal law.

    If a schedule change becomes necessary for the final EIS, an 
additional notice will be provided so that the relevant agencies are 
kept informed of the Project's progress.

Permits and Authorizations

    The table below lists the anticipated permits and authorizations 
for the Project required under federal law. This list may not be all-
inclusive and does not preclude any permit or authorization if it is 
not listed here. Agencies with jurisdiction by law and/or special 
expertise may formally cooperate in the preparation of the Commission's 
EIS and may adopt the EIS to satisfy its NEPA responsibilities related 
to this Project. Agencies that would like to request cooperating agency 
status should follow the instructions for filing comments provided 
under the Public Participation section of this notice.

------------------------------------------------------------------------
                 Agency                               Permit
------------------------------------------------------------------------
FERC...................................  Section 7 of the Natural Gas
                                          Act.
U.S. Fish and Wildlife Service.........  Section 7 of Endangered Species
                                          Act Consultation.
State Historic Preservation Office.....  Section 106 of National
                                          Historic Preservation Act
                                          Consultation.
------------------------------------------------------------------------

Environmental Mailing List

    This notice is being sent to the Commission's current environmental 
mailing list for the Project which includes federal, state, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for Project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the Project and includes a mailing address with their 
comments. Commission staff will update the environmental mailing list 
as the analysis proceeds to ensure that Commission notices related to 
this environmental review are sent to all individuals, organizations, 
and government entities interested in and/or potentially affected by 
the proposed Project. State and local government representatives should 
notify their constituents of this proposed project and encourage them 
to comment on their areas of concern.
    If you need to make changes to your name/address, or if you would 
like to remove your name from the mailing list, please complete one of 
the following steps:
    (1) Send an email to <a href="/cdn-cgi/l/email-protection#175076644765787d72746356737365726464547f76797072577172657439707861"><span class="__cf_email__" data-cfemail="2e694f5d7e5c41444b4d5a6f4a4a5c4b5d5d6d464f40494b6e484b5c4d00494158">[email&#160;protected]</span></a> stating your 
request. You must include the docket number CP22-461-000 in your 
request. If you are requesting a change to your address, please be sure 
to include your name and the correct address. If you are requesting to 
delete your address from the mailing list, please include your name and 
address as it appeared on this notice. This email address is unable to 
accept comments.
    OR
    (2) Return the attached ``Mailing List Update Form'' (appendix 2).

Additional Information

    Additional information about the Project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC website at <a href="http://www.ferc.gov">www.ferc.gov</a> using the eLibrary link. Click on the 
eLibrary link, click on ``General Search'' and enter the docket number 
in the ``Docket Number'' field (i.e., CP22-461-000). Be sure you have 
selected an appropriate date range. For assistance, please contact FERC 
Online Support at <a href="/cdn-cgi/l/email-protection#41072433220e2f2d282f24123431312e333501272433226f262e37"><span class="__cf_email__" data-cfemail="6c2a091e0f2302000502093f191c1c031e182c0a091e0f420b031a">[email&#160;protected]</span></a> or (866) 208-3676, or for 
TTY, contact (202) 502-8659. The eLibrary link also provides access to 
the texts of all formal documents issued by the Commission, such as 
orders, notices, and rulemakings.
    Public sessions or site visits will be posted on the Commission's 
calendar located at <a href="https://www.ferc.gov/news-events/events">https://www.ferc.gov/news-events/events</a> along with 
other related information.

    Dated: July 25, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-16350 Filed 7-29-22; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on August 1, 2022.