Notice2022-15595
Northern Natural Gas Company; Notice of Availability of the Environmental Assessment for the Proposed Ogden to Ventura A-Line Abandonment and Capacity Replacement Project
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
July 21, 2022
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 87 Issue 139 (Thursday, July 21, 2022)</title>
</head>
<body><pre>
[Federal Register Volume 87, Number 139 (Thursday, July 21, 2022)]
[Notices]
[Pages 43516-43517]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2022-15595]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP22-42-000]
Northern Natural Gas Company; Notice of Availability of the
Environmental Assessment for the Proposed Ogden to Ventura A-Line
Abandonment and Capacity Replacement Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared an environmental assessment (EA) for the Ogden
to Ventura A-line Abandonment and Capacity Replacement Project
(Project), proposed by Northern Natural Gas Company (Northern) in the
above-referenced docket. Northern requests authorization to abandon,
construct, modify, and operate natural gas pipeline facilities in
Boone, Webster, and Hancock Counties, Iowa.
The EA assesses the potential environmental effects of the
construction and operation of the Project in accordance with the
requirements of the National Environmental Policy Act. The FERC staff
concludes that approval of the proposed Project, with appropriate
mitigating measures, would not constitute a major federal action
significantly affecting the quality of the human environment.
The proposed Project includes the following activities and
facilities:
[[Page 43517]]
<bullet> abandon-in-place 82.7 miles of 20-inch-diameter IAM60601
A-line pipeline (A-line) between the Ogden and Ventura compressor
stations in Boone, Webster, and Hancock Counties, Iowa;
<bullet> disconnect the 20-inch-diameter A-line near the Ogden
Compressor Station in Boone County, Iowa;
<bullet> disconnect the 20-inch-diameter A-line at the Eagle Grove
branch line take-off in Wright County, Iowa;
<bullet> disconnect the 20-inch-diameter A-line at the Ventura
Compressor Station in Hancock County, Iowa;
<bullet> install 300 to 1,200 horsepower (hp) temporary compression
stations at three discrete locations (one each in Boone, Webster, and
Hancock Counties) to evacuate gas from the A-line to the IAM60602 B-
line (B-line); and
<bullet> install a pipeline extension of the IAM60604 D-Line
pipeline (D-line) consisting of 6.04 miles of 30-inch-diameter pipeline
and an associated aboveground pipeline inspection gauge (pig) receiver
in Wright County, Iowa.
The Commission mailed a copy of the Notice of Availability of the
EA to federal, state, and local government representatives and
agencies; elected officials; environmental and public interest groups;
Native American tribes; potentially affected landowners and other
interested individuals and groups; and newspapers and libraries in the
Project area. The EA is only available in electronic format. It may be
viewed and downloaded from the FERC's website (<a href="http://www.ferc.gov">www.ferc.gov</a>), on the
natural gas environmental documents page (<a href="https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents">https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents</a>). In
addition, the EA may be accessed by using the eLibrary link on the
FERC's website. Click on the eLibrary link (<a href="https://elibrary.ferc.gov/eLibrary/search">https://elibrary.ferc.gov/eLibrary/search</a>), select ``General Search'' and enter the docket number
in the ``Docket Number'' field (i.e., CP22-42). Be sure you have
selected an appropriate date range. For assistance, please contact FERC
Online Support at <a href="/cdn-cgi/l/email-protection#35735047567a5b595c5b50664045455a474175535047561b525a43"><span class="__cf_email__" data-cfemail="165073647559787a7f787345636666796462567073647538717960">[email protected]</span></a> or toll free at (866) 208-
3676, or for TTY, contact (202) 502-8659.
The EA is not a decision document. It presents Commission staff's
independent analysis of the environmental issues for the Commission to
consider when addressing the merits of all issues in this proceeding.
Any person wishing to comment on the EA may do so. Your comments should
focus on the EA's disclosure and discussion of potential environmental
effects, reasonable alternatives, and measures to avoid or lessen
environmental impacts. The more specific your comments, the more useful
they will be. To ensure that the Commission has the opportunity to
consider your comments prior to making its decision on this Project, it
is important that we receive your comments in Washington, DC on or
before 5:00 p.m. Eastern Time on August 15, 2022.
For your convenience, there are three methods you can use to file
your comments with the Commission. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or <a href="/cdn-cgi/l/email-protection#f4b2918697bb9a989d9a91a78184849b8680b492918697da939b82"><span class="__cf_email__" data-cfemail="d99fbcabba96b7b5b0b7bc8aaca9a9b6abad99bfbcabbaf7beb6af">[email protected]</span></a>. Please carefully follow these
instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment
feature on the Commission's website (<a href="http://www.ferc.gov">www.ferc.gov</a>) under the link to
FERC Online. This is an easy method for submitting brief, text-only
comments on a project;
(2) You can also file your comments electronically using the
eFiling feature on the Commission's website (<a href="http://www.ferc.gov">www.ferc.gov</a>) under the
link to FERC Online. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the Commission. Be sure to reference the Project docket number (CP22-
42-000) on your letter. Submissions sent via the U.S. Postal Service
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
20426. Submissions sent via any other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, Maryland 20852.
Filing environmental comments will not give you intervenor status,
but you do not need intervenor status to have your comments considered.
Only intervenors have the right to seek rehearing or judicial review of
the Commission's decision. At this point in this proceeding, the
timeframe for filing timely intervention requests has expired. Any
person seeking to become a party to the proceeding must file a motion
to intervene out-of-time pursuant to Rule 214(b)(3) and (d) of the
Commission's Rules of Practice and Procedures (18 CFR 385.214(b)(3) and
(d)) and show good cause why the time limitation should be waived.
Motions to intervene are more fully described at <a href="https://www.ferc.gov/ferc-online/ferc-online/how-guides">https://www.ferc.gov/ferc-online/ferc-online/how-guides</a>.
Additional information about the Project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website (<a href="http://www.ferc.gov">www.ferc.gov</a>) using the eLibrary link. The eLibrary link
also provides access to the texts of all formal documents issued by the
Commission, such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to <a href="https://www.ferc.gov/ferc-online/overview">https://www.ferc.gov/ferc-online/overview</a> to
register for eSubscription.
Dated: July 15, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-15595 Filed 7-20-22; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on July 21, 2022.