Tallassee Shoals, LLC.; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
July 13, 2022

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 87 Issue 133 (Wednesday, July 13, 2022)</title>
</head>
<body><pre>
[Federal Register Volume 87, Number 133 (Wednesday, July 13, 2022)]
[Notices]
[Pages 41709-41710]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2022-14927]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 6951-018]


Tallassee Shoals, LLC.; Notice of Application Accepted for 
Filing, Soliciting Motions To Intervene and Protests, Ready for 
Environmental Analysis, and Soliciting Comments, Recommendations, Terms 
and Conditions, and Prescriptions

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New License.
    b. Project No.: 6951-018.
    c. Date Filed: September 15, 2021.
    d. Applicant: Tallassee Shoals, LLC.
    e. Name of Project: Tallassee Shoals Hydroelectric Project 
(project).
    f. Location: On the Middle Oconee River, in Athens-Clarke and 
Jackson Counties, Georgia. The project does not occupy any federal 
land.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Walter Puryear, Tallassee Shoals, LLC, 2399 
Tallassee Road, Athens, Georgia 30607; Phone at (706) 540-7621, or 
email at <a href="/cdn-cgi/l/email-protection#196e696c6b607c786b597b7c75756a766c6d7137777c6d"><span class="__cf_email__" data-cfemail="f4838481868d919586b496919898879b81809cda9a9180">[email&#160;protected]</span></a>.
    i. FERC Contact: Michael Spencer at (202) 502-6093, or 
<a href="/cdn-cgi/l/email-protection#127f7b717a73777e3c6162777c71776052747760713c757d64"><span class="__cf_email__" data-cfemail="177a7e747f76727b3964677279747265577172657439707861">[email&#160;protected]</span></a>.
    j. Deadline for filing comments, recommendations, terms and 
conditions, and prescriptions: 60 days from the issuance date of this 
notice; reply comments are due 105 days from the issuance date of this 
notice.
    The Commission strongly encourages electronic filing. Please file 
comments,

[[Page 41710]]

recommendations, terms and conditions, and prescriptions using the 
Commission's eFiling system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
<a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
<a href="/cdn-cgi/l/email-protection#5d1b180f1e1233313433380e282d2d322f291d3b382f3e733a322b"><span class="__cf_email__" data-cfemail="13555641505c7d7f7a7d76406663637c616753757661703d747c65">[email&#160;protected]</span></a>, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy. 
Submissions sent via the U.S. Postal Service must be addressed to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via 
any other carrier must be addressed to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, 
Maryland 20852. The first page of any filing should include docket 
number P-6951-018.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    k. This application has been accepted and is ready for 
environmental analysis at this time.
    The Council on Environmental Quality (CEQ) issued a final rule on 
April 20, 2022, revising the regulations under 40 CFR parts 1502, 1507, 
and 1508 that federal agencies use to implement the National 
Environmental Policy Act (NEPA) (see National Environmental Policy Act 
Implementing Regulations Revisions, 87 FR 23,453-70). The final rule 
became effective on May 20, 2022. Commission staff intends to conduct 
its NEPA review in accordance with CEQ's new regulations.
    l. The Tallassee Shoals Project consists of: (1) a 365-foot-long, 
25-foot-high concrete dam; (2) a 23-acre impoundment with a net storage 
capacity of 115 acre-feet, at 645 feet elevation; (3) a 100-kilowatt 
fixed Kaplan unit integral with the east end of the dam; (4) a 1,400-
foot-long headrace canal from the dam to the powerhouse; (5) an 80-
foot-long, 11-foot-diameter penstock; (6) a powerhouse containing a 
single 2.2-megawatt (MW) adjustable Kaplan unit; (7) a 75-foot-long 
tailrace; and (8) a 100-foot-long, 42-kilovolt transmission line. The 
project creates a 2,100-foot-long bypassed reach of the Middle Oconee 
River. The project's total capacity is 2.3 MW.
    The current license requires Tallassee Shoals, LLC. to: (1) operate 
the project in run-of-river mode; (2) release a bypassed reach minimum 
flow of 70 cubic feet per second (cfs) all months of the year except 
May when the minimum flow is 138 cfs. The average annual generation of 
the project is approximately 6,100 megawatt-hours.
    Tallassee Shoals, LLC. proposes to discontinue releasing the 138-
cfs minimum flow currently required in the month of May and instead 
release the 70 cfs minimum flow, which is currently required from June 
through April, through May as well (i.e., through the entire year).
    m. A copy of the application can be viewed on the Commission's 
website at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. For assistance, contact FERC Online 
Support.
    n. Anyone may submit comments, a protest, or a motion to intervene 
in accordance with the requirements of Rules of Practice and Procedure, 
18 CFR 385.210, .211, and .214. In determining the appropriate action 
to take, the Commission will consider all protests or other comments 
filed, but only those who file a motion to intervene in accordance with 
the Commission's Rules may become a party to the proceeding. Any 
comments, protests, or motions to intervene must be received on or 
before the specified comment date for the particular application.
    All filings must: (1) bear in all capital letters the title 
``PROTEST,'' ``MOTION TO INTERVENE,'' ``COMMENTS,'' ``REPLY COMMENTS,'' 
``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or ``PRESCRIPTIONS;'' 
(2) set forth in the heading the name of the applicant and the project 
number of the application to which the filing responds; (3) furnish the 
name, address, and telephone number of the person protesting or 
intervening; and (4) otherwise comply with the requirements of 18 CFR 
385.2001 through 385.2005. All comments, recommendations, terms and 
conditions, or prescriptions must set forth their evidentiary basis and 
otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may 
obtain copies of the application directly from the applicant. A copy of 
any protest or motion to intervene must be served upon each 
representative of the applicant specified in the particular 
application. A copy of all other filings in reference to this 
application must be accompanied by proof of service on all persons 
listed on the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    You may also register online at <a href="https://www.ferc.gov/ferc-online/overview">https://www.ferc.gov/ferc-online/overview</a> to be notified via email of new filings and issuances related 
to this or other pending projects. For assistance, contact FERC Online 
Support.
    o. The applicant must file no later than 60 days following the date 
of issuance of this notice: (1) a copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification. Please note 
that the certification request must comply with 40 CFR 121.5(b), 
including documentation that a pre-filing meeting request was submitted 
to the certifying authority at least 30 days prior to submitting the 
certification request. Please also note that the certification request 
must be sent to the certifying authority and to the Commission 
concurrently.
    p. Procedural Schedule: The application will be processed according 
to the following schedule. Revisions to the schedule will be made as 
appropriate.

------------------------------------------------------------------------
                 Milestone                           Target date
------------------------------------------------------------------------
Deadline for filing comments,               September 2022.
 recommendations, preliminary terms and
 conditions, and preliminary fishway
 prescriptions.
Deadline for filing reply comments........  October 2022.
------------------------------------------------------------------------

    q. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of this notice.

    Dated: July 7, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-14927 Filed 7-12-22; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on July 13, 2022.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.