PacifiCorp; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
June 2, 2022
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 87 Issue 106 (Thursday, June 2, 2022)</title>
</head>
<body><pre>
[Federal Register Volume 87, Number 106 (Thursday, June 2, 2022)]
[Notices]
[Page 33477]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2022-11774]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15242-000]
PacifiCorp; Notice of Preliminary Permit Application Accepted for
Filing and Soliciting Comments, Motions To Intervene, and Competing
Applications
On October 13, 2021, the PacifiCorp, filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of Electric Lake Pumped
Storage Project to be located in Emery and Sanpete Counties, Utah. The
sole purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would consist of the following: (1) The
existing 31,500-acre-foot Electric Lake as the upper reservoir, which
is impounded by the 229-foot-high, 8,586-foot-long Electric Lake Dam;
(2) a new 3,900-foot-long, 375-foot-high concrete gravity dam; a new
820-foot-long, 85-foot-high embankment dam; and a new 1,300-foot-long,
150-foot-high embankment dam, each of which would impound a new 5,000-
acre-foot upper reservoir; (3) a new 9,504-foot-long, 24-foot-diameter
penstock; (4) a new underground powerhouse containing up to three 167-
megawatt Francis pump-turbines generators; (5) a new 345-kilovolt,
55,968-foot-long transmission line that would connect the powerhouse to
the PacifiCorp's existing Huntington-Mona 345-kilovolt transmission
line; and (6) appurtenant facilities. The estimated annual power
generation at the Electric Lake Pumped Storage Project would be 1,460
gigawatt-hours.
Applicant Contact: Mr. Tim Hemstreet, Managing Director, Renewable
Energy Development PacifiCorp. 825 NE Multnomah, Suite 1800 Portland,
OR 97232 <a href="/cdn-cgi/l/email-protection#b6e2dfdb98ded3dbc5c2c4d3d3c2f6c6d7d5dfd0dfd5d9c4c698d5d9db"><span class="__cf_email__" data-cfemail="bbefd2d695d3ded6c8cfc9dedecffbcbdad8d2ddd2d8d4c9cb95d8d4d6">[email protected]</span></a>.
FERC Contact: Ousmane Sidibe; Phone: (202) 502-6245.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at <a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
<a href="/cdn-cgi/l/email-protection#9fd9dacddcd0f1f3f6f1facceaefeff0edebdff9faedfcb1f8f0e9"><span class="__cf_email__" data-cfemail="f6b0b3a4b5b9989a9f9893a5838686998482b690938495d8919980">[email protected]</span></a>, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. The first page of any filing should include docket
number P-15242-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's website at <a href="https://www.ferc.gov/ferc-online/elibrary/overview">https://www.ferc.gov/ferc-online/elibrary/overview</a>. Enter the docket number (P-15242) in the docket number field
to access the document. For assistance, contact FERC Online Support.
Dated: May 25, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-11774 Filed 6-1-22; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on June 2, 2022.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.