Notice2022-10201
City of Hood River, Oregon; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
May 12, 2022
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 87 Issue 92 (Thursday, May 12, 2022)</title>
</head>
<body><pre>
[Federal Register Volume 87, Number 92 (Thursday, May 12, 2022)]
[Notices]
[Pages 29152-29153]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2022-10201]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD22-6-000]
City of Hood River, Oregon; Notice of Preliminary Determination
of a Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On May 5, 2022, the City of Hood River, Oregon, filed a notice of
intent to construct a qualifying conduit hydropower facility, pursuant
to section 30 of the Federal Power Act (FPA). The proposed Dee Bridge
Hydroelectric Station Project would have an installed capacity of 175
kilowatts (kW), and would be located along an existing 24-inch pipeline
at the applicant's Dee Bridge Pressure Reducing Station in Dee, Hood
River County, Oregon.
Applicant Contact: Andrew Benjamin, NLine Energy, Inc., 403 Portway
Avenue, Suite 300, Hood River, OR 97031, 530-420-6098,
<a href="/cdn-cgi/l/email-protection#0a6b686f64606b6763644a646663646f6f646f786d7324696567"><span class="__cf_email__" data-cfemail="2a4b484f44404b4743446a444643444f4f444f584d5304494547">[email protected]</span></a>.
FERC Contact: Christopher Chaney, 202-502-6778,
<a href="/cdn-cgi/l/email-protection#82e1eaf0ebf1f6edf2eae7f0ace1eae3ece7fbc2e4e7f0e1ace5edf4"><span class="__cf_email__" data-cfemail="cdaea5bfa4beb9a2bda5a8bfe3aea5aca3a8b48daba8bfaee3aaa2bb">[email protected]</span></a>.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) One 175
[[Page 29153]]
kW turbine/generator unit; (2) 12 or 18-inch-diameter intake and
discharge pipes; and (3) appurtenant facilities. The proposed project
would have an estimated annual generation of approximately 650
megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
Satisfies (Y/
Statutory provision Description N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A).......................... The conduit the facility uses is a tunnel, canal, Y
pipeline, aqueduct, flume, ditch, or similar
manmade water conveyance that is operated for the
distribution of water for agricultural, municipal,
or industrial consumption and not primarily for the
generation of electricity.
FPA 30(a)(3)(C)(i)....................... The facility is constructed, operated, or maintained Y
for the generation of electric power and uses for
such generation only the hydroelectric potential of
a non-federally owned conduit.
FPA 30(a)(3)(C)(ii)...................... The facility has an installed capacity that does not Y
exceed 40 megawatts.
FPA 30(a)(3)(C)(iii)..................... On or before August 9, 2013, the facility is not Y
licensed, or exempted from the licensing
requirements of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------
Preliminary Determination: The proposed Dee Bridge Hydroelectric
Station Project will not alter the primary purpose of the conduit,
which is to transport potable water for municipal use. Therefore, based
upon the above criteria, Commission staff preliminarily determines that
the proposal satisfies the requirements for a qualifying conduit
hydropower facility, which is not required to be licensed or exempted
from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 30
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2021).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at <a href="http://www.ferc.gov/docs-filing/efiling.asp">http://www.ferc.gov/docs-filing/efiling.asp</a>. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at <a href="http://www.ferc.gov/docs-filing/ecomment.asp">http://www.ferc.gov/docs-filing/ecomment.asp</a>. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at <a href="/cdn-cgi/l/email-protection#cf898a9d8c80a1a3a6a1aa9cbabfbfa0bdbb8fa9aabdace1a8a0b9"><span class="__cf_email__" data-cfemail="a5e3e0f7e6eacbc9cccbc0f6d0d5d5cad7d1e5c3c0d7c68bc2cad3">[email protected]</span></a>, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, you may send a
paper copy. Submissions sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, MD 20852. A copy of all other filings in reference
to this application must be accompanied by proof of service on all
persons listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 385.2010.
Locations of Notice of Intent: The Commission provides all
interested persons an opportunity to view and/or print the contents of
this document via the internet through the Commission's website at
<a href="http://www.ferc.gov/docs-filing/elibrary.asp">http://www.ferc.gov/docs-filing/elibrary.asp</a>. Enter the docket number
(i.e., CD22-6) in the docket number field to access the document. You
may also register online at <a href="http://www.ferc.gov/docs-filing/esubscription.asp">http://www.ferc.gov/docs-filing/esubscription.asp</a> to be notified via email of new filings and issuances
related to this or other pending projects. Copies of the notice of
intent can be obtained directly from the applicant. For assistance,
call toll-free 1-866-208-3676 or email <a href="/cdn-cgi/l/email-protection#cd8b889f8e82a3a1a4a3a89eb8bdbda2bfb98daba8bfaee3aaa2bb"><span class="__cf_email__" data-cfemail="c4828196878baaa8adaaa197b1b4b4abb6b084a2a1b6a7eaa3abb2">[email protected]</span></a>. For
TTY, call (202) 502-8659.
Dated: May 6, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-10201 Filed 5-11-22; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on May 12, 2022.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.