Notice2022-08552
City of Portland, Oregon; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
April 22, 2022
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 87 Issue 78 (Friday, April 22, 2022)</title>
</head>
<body><pre>
[Federal Register Volume 87, Number 78 (Friday, April 22, 2022)]
[Notices]
[Pages 24152-24153]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2022-08552]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD22-5-000]
City of Portland, Oregon; Notice of Preliminary Determination of
a Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On April 12, 2022, as supplemented on April 13, 2022, the City of
Portland, Oregon, through its Water Bureau, filed a notice of intent to
construct a qualifying conduit hydropower facility, pursuant to section
30 of the Federal Power Act (FPA). The proposed Washington Park
Reservoir Hydroelectric Project would have an installed capacity of 30
kilowatts (kW), and would be located along an existing 24-inch pipeline
at the applicant's Washington Park Reservoir in Portland, Multnomah
County, Oregon.
Applicant Contact: Susan Priddy, InPipe Energy, 920 SE 6th Ave 12th
Floor, Portland, OR 97204, 503-380-8487, <a href="/cdn-cgi/l/email-protection#9ecdebedfff0def7f0eef7eefbfbf0fbecf9e7b0fdf1f3"><span class="__cf_email__" data-cfemail="8cdff9ffede2cce5e2fce5fce9e9e2e9feebf5a2efe3e1">[email protected]</span></a>.
FERC Contact: Christopher Chaney, 202-502-6778,
<a href="/cdn-cgi/l/email-protection#05666d776c76716a756d60772b666d646b607c45636077662b626a73"><span class="__cf_email__" data-cfemail="e88b809a819b9c8798808d9ac68b8089868d91a88e8d9a8bc68f879e">[email protected]</span></a>.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) One 30 kW turbine/generator unit; (2) 10-
inch-diameter intake and discharge pipes; and (3) appurtenant
facilities. The proposed project would have an estimated annual
generation of approximately 77 megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
Statutory provision Description Satisfies (Y/N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A).......................... The conduit the facility uses is a tunnel, canal, Y
pipeline, aqueduct, flume, ditch, or similar
manmade water conveyance that is operated for the
distribution of water for agricultural, municipal,
or industrial consumption and not primarily for the
generation of electricity.
FPA 30(a)(3)(C)(i)....................... The facility is constructed, operated, or maintained Y
for the generation of electric power and uses for
such generation only the hydroelectric potential of
a non-federally owned conduit.
FPA 30(a)(3)(C)(ii)...................... The facility has an installed capacity that does not Y
exceed 40 megawatts.
FPA 30(a)(3)(C)(iii)..................... On or before August 9, 2013, the facility is not Y
licensed, or exempted from the licensing
requirements of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------
Preliminary Determination: The proposed Washington Park Reservoir
Hydroelectric Project will not alter the primary purpose of the
conduit, which is to transport water for municipal use. Therefore,
based upon the above criteria, Commission staff preliminarily
determines that the proposal satisfies the requirements for a
qualifying conduit hydropower facility, which is not required to be
licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 30
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2021).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at <a href="http://www.ferc.gov/docs-filing/efiling.asp">http://www.ferc.gov/docs-filing/efiling.asp</a>. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at <a href="http://www.ferc.gov/docs-filing/ecomment.asp">http://www.ferc.gov/docs-filing/ecomment.asp</a>. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at <a href="/cdn-cgi/l/email-protection#88cecddacbc7e6e4e1e6eddbfdf8f8e7fafcc8eeedfaeba6efe7fe"><span class="__cf_email__" data-cfemail="276162756468494b4e494274525757485553674142554409404851">[email protected]</span></a>, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, you may send a
paper copy. Submissions sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, MD 20852. A copy of all other filings in reference
to this application must be accompanied by proof of service on all
persons listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 385.2010.
Locations of Notice of Intent: The Commission provides all
interested
[[Page 24153]]
persons an opportunity to view and/or print the contents of this
document via the internet through the Commission's website at <a href="http://www.ferc.gov/docs-filing/elibrary.asp">http://www.ferc.gov/docs-filing/elibrary.asp</a>. Enter the docket number (i.e.,
CD22-5) in the docket number field to access the document. You may also
register online at <a href="http://www.ferc.gov/docs-filing/esubscription.asp">http://www.ferc.gov/docs-filing/esubscription.asp</a> to
be notified via email of new filings and issuances related to this or
other pending projects. Copies of the notice of intent can be obtained
directly from the applicant. For assistance, call toll-free 1-866-208-
3676 or email <a href="/cdn-cgi/l/email-protection#42040710010d2c2e2b2c27113732322d303602242730216c252d34"><span class="__cf_email__" data-cfemail="a9efecfbeae6c7c5c0c7ccfadcd9d9c6dbdde9cfccdbca87cec6df">[email protected]</span></a>. For TTY, call (202) 502-8659.
Dated: April 15, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022-08552 Filed 4-21-22; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on April 22, 2022.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.