Lakeport Hydroelectric One, LLC; Notice Soliciting Scoping Comments
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
March 4, 2022
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 87 Issue 43 (Friday, March 4, 2022)</title>
</head>
<body><pre>
[Federal Register Volume 87, Number 43 (Friday, March 4, 2022)]
[Notices]
[Pages 12447-12448]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2022-04555]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6440-010]
Lakeport Hydroelectric One, LLC; Notice Soliciting Scoping
Comments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 6440-010.
c. Date Filed: August 30, 2021.
d. Applicant: Lakeport Hydroelectric One, LLC (Lakeport).
e. Name of Project: Lakeport Hydroelectric Project (project).
f. Location: On the Winnipesaukee River in Belknap County, New
Hampshire. The project does not occupy any federal land.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)--825(r).
h. Applicant Contact: Ms. Jody Smet, Lakeport Hydroelectric One,
LLC c/o Eagle Creek Renewable Energy, LLC, 7315 Wisconsin Avenue, Suite
1100W, Bethesda, MD 20814; Phone at (240) 482-2700, or email at
<a href="/cdn-cgi/l/email-protection#72181d160b5c011f1706321713151e17110017171900175c111d1f"><span class="__cf_email__" data-cfemail="8ae0e5eef3a4f9e7effecaefebede6efe9f8efefe1f8efa4e9e5e7">[email protected]</span></a>..
i. FERC Contact: Erin Kimsey at (202) 502-8621, or
<a href="/cdn-cgi/l/email-protection#9cf9eef5f2b2f7f5f1eff9e5dcfaf9eeffb2fbf3ea"><span class="__cf_email__" data-cfemail="fe9b8c9790d09597938d9b87be989b8c9dd0999188">[email protected]</span></a>.
j. Deadline for Filing Scoping Comments: March 26, 2022.
The Commission strongly encourages electronic filing. Please file
scoping comments using the Commission's eFiling system at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at <a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
<a href="/cdn-cgi/l/email-protection#a0e6e5f2e3efceccc9cec5f3d5d0d0cfd2d4e0c6c5d2c38ec7cfd6"><span class="__cf_email__" data-cfemail="1a5c5f485955747673747f496f6a6a75686e5a7c7f6879347d756c">[email protected]</span></a>, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
MD 20852. All filings must clearly identify the project name and docket
number on the first page: Lakeport Project (P-6440-010).
[[Page 12448]]
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. The application is not ready for environmental analysis at this
time.
l. The existing Lakeport Hydroelectric Project consists of: (1) A
243-foot-long, 12.34-foot-high concrete gravity dam that includes the
following sections: (a) A 60-foot-long, 12.34-foot-high east abutment
section; (b) 78-foot-long, 4-foot-high section with a sill elevation of
495.22 feet National Geodetic Vertical Datum of 1929 (NGVD29), topped
with three 10-foot-high, 18-foot-wide slide gates; (c) an approximately
15-foot-long overflow section with a crest elevation of 505.33 feet
NGVD29; (d) an approximately 21-foot-long, 10-foot-wide center pier;
(e) a 25-foot-long, 12.33-foot-high stoplog section; and (f) a 44-foot-
long, 41.67-foot-wide concrete powerhouse that is integral with the dam
and that contains three 200-kW vertical submersible Flygt turbine-
generator units located on outdoor concrete pilings for a total
installed capacity of 600 kW; (2) a 75-foot-long stone training wall
that extends downstream on the western side of the powerhouse; (3) an
impoundment (Lake Winnipesaukee) with a surface area of approximately
46,208 acres and a storage capacity of 165,800 acre-feet at an
elevation of 504 feet NGVD29; (4) a 2,500-square-foot forebay area; (4)
a 7.7-foot-long, 15-foot-high concrete and granite intake structure
that is equipped with three 6-foot-diameter, 10-foot-long cylindrical
headgates and a trashrack with 2-inch clear bar spacing with a 0.75-
inch overlay; (5) a 23-foot-long, 30.5-foot-wide, 20-foot-high concrete
and lumber control building adjacent to the powerhouse, on the eastern
shoreline; (6) a 200-foot-long, 50-foot-wide tailrace that discharges
into the Winnipesaukee River; (7) three 30- to 55-foot-long, 0.48-
kilovolt (kV) generator leads, three 0.48/12.4-kV step-up transformers
at a substation adjacent to the control building that connect the
project to the local utility distribution system; and (8) appurtenant
facilities. The average annual energy production of the project from
2015 to 2019, was 2,250 MWh.
Lakeport proposes to prepare a trashrack replacement plan, in
consultation with agencies. Lakeport is not proposing any operational
changes.
m. In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents via the internet through
the Commission's Home Page (<a href="http://www.ferc.gov">http://www.ferc.gov</a>) using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC at <a href="/cdn-cgi/l/email-protection#f1b7b4a3b2be9f9d989f94a28481819e8385b197948392df969e87"><span class="__cf_email__" data-cfemail="ca8c8f988985a4a6a3a4af99bfbabaa5b8be8aacafb8a9e4ada5bc">[email protected]</span></a> or call toll-free, (866) 208-3676 or
TYY, (202) 502-8659.
n. You may also register online at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a> to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
o. Scoping Process:
Commission staff will prepare either an environmental assessment
(EA) or an Environmental Impact Statement (EIS) that describes and
evaluates the probable effects, if any, of the licensee's proposed
action and alternatives. The EA or EIS will consider environmental
impacts and reasonable alternatives to the proposed action. The
Commission's scoping process will help determine the required level of
analysis and satisfy the National Environmental Policy Act (NEPA)
scoping requirements, irrespective of whether the Commission prepares
an EA or an EIS. At this time, we do anticipate holding on-site scoping
meetings. Instead, we are soliciting written comments and suggestions
on the preliminary list of issues and alternatives to be addressed in
the NEPA document, as described in scoping document 1 (SD1), issued
February 24, 2022.
Copies of the SD1 outlining the subject areas to be addressed in
the NEPA document were distributed to the parties on the Commission's
mailing list and the applicant's distribution list. Copies of SD1 may
be viewed on the web at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, call 1-866-
208-3676 or for TTY, (202) 502-8659.
Dated: February 24, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-04555 Filed 3-3-22; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>