Notice2021-24830
Florida Gas Transmission Company, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
November 15, 2021
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 86 Issue 217 (Monday, November 15, 2021)</title>
</head>
<body><pre>
[Federal Register Volume 86, Number 217 (Monday, November 15, 2021)]
[Notices]
[Pages 63016-63017]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2021-24830]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP22-13-000]
Florida Gas Transmission Company, LLC; Notice of Request Under
Blanket Authorization and Establishing Intervention and Protest
Deadline
Take notice that on October 28, 2021, Florida Gas Transmission
Company, LLC (FGT), 1300 Main Street, Houston, Texas 77002, filed in
the above referenced docket, a prior notice request pursuant to
sections 157.205, 157.208, and 157.210 of the Commission's regulations
under the Natural Gas Act (NGA) and FGT's blanket certificate issued in
Docket No. CP82-553-000, for authorization to increase mainline
capacity, and to replace and uprate an Electric Motor Drive (EMD) and
related appurtenances on compressor unit 1110 and make minor auxiliary
modifications to upgrade existing EMD system controls and auxiliary
equipment on compressor unit 1111 under Section 2.55(a) of the
Commission's regulations, all at FGT's existing Compressor Station 11
(CS 11) in Mobile County, Alabama.
The proposed modifications at CS 11 will allow FGT to flow natural
gas from west to east, and transport incremental interstate gas from an
existing receipt point in George County, Mississippi, to an existing
delivery point in Escambia County, Alabama. The proposed project is
designed primarily to meet the demand for an additional 100,000 million
British Thermal Units per day (MMBtu/d) of natural gas transportation
to be delivered to Florida Power & Light Company (FPL), d/b/a Gulf
Power Company (Gulf Power), in FGT's Western Division in the Alabama
Gulf Coast natural gas market, all as more fully set forth in the
application, which is on file with the Commission and open to public
inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (<a href="http://ferc.gov">http://ferc.gov</a>) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact FERC at
<a href="/cdn-cgi/l/email-protection#f0b6b5a2b3bf9e9c999e95a38580809f8284b096958293de979f86"><span class="__cf_email__" data-cfemail="bdfbf8effef2d3d1d4d3d8eec8cdcdd2cfc9fddbd8cfde93dad2cb">[email protected]</span></a> or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
Any questions regarding this prior notice request should be
directed to Blair Lichtenwalter, Senior Director, Certificates, Florida
Gas Transmission Company, LLC, 1300 Main Street, P.O. Box 4967,
Houston, Texas 77210-4967, at (713) 989-2605, or by email to
<a href="/cdn-cgi/l/email-protection#f8ba9499918ad6b4919b908c9d968f99948c9d8ab89d969d8a9f818c8a99968b9e9d8ad69b9795"><span class="__cf_email__" data-cfemail="c082aca1a9b2ee8ca9a3a8b4a5aeb7a1acb4a5b280a5aea5b2a7b9b4b2a1aeb3a6a5b2eea3afad">[email protected]</span></a>.
Public Participation
There are three ways to become involved in the Commission's review
of this project: You can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on January 7, 2022.
How to file protests, motions to intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\1\ any person \2\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\1\ 18 CFR 157.205.
\2\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
[[Page 63017]]
157.205(e) of the Commission's regulations,\3\ and must be submitted by
the protest deadline, which is January 7, 2022. A protest may also
serve as a motion to intervene so long as the protestor states it also
seeks to be an intervenor.
---------------------------------------------------------------------------
\3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is January 7, 2022. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at <a href="https://www.ferc.gov/resources/guides/how-to/intervene.asp">https://www.ferc.gov/resources/guides/how-to/intervene.asp</a>.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before January 7, 2022. The filing of a comment alone will not
serve to make the filer a party to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP22-13-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (<a href="http://www.ferc.gov">www.ferc.gov</a>) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select ``General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \6\
---------------------------------------------------------------------------
\6\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at <a href="http://www.ferc.gov">www.ferc.gov</a> under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
(2) You can file a paper copy of your submission by mailing it to
the address below.\7\ Your submission must reference the Project docket
number CP22-13-000. Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Washington, DC 20426.
---------------------------------------------------------------------------
\7\ Hand-delivered submissions in docketed proceedings should be
delivered to Health and Human Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
---------------------------------------------------------------------------
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or <a href="/cdn-cgi/l/email-protection" class="__cf_email__" data-cfemail="44022136270b2a282d2a21173134342b363004222136276a232b32">[email protected]</a>.
Protests and motions to intervene must be served on the applicant
either by mail at: 1300 Main Street, P.O. Box 4967, Houston, Texas
77210-4967, or email (with a link to the document) at:
<a href="/cdn-cgi/l/email-protection#743618151d065a381d171c00111a03151800110634111a1106130d0006151a071211065a171b19"><span class="__cf_email__" data-cfemail="185a7479716a3654717b706c7d766f79746c7d6a587d767d6a7f616c6a79766b7e7d6a367b7775">[email protected]</span></a>. Any subsequent submissions by
an intervenor must be served on the applicant and all other parties to
the proceeding. Contact information for parties can be downloaded from
the service list at the eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at <a href="http://www.ferc.gov">www.ferc.gov</a> using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
<a href="http://www.ferc.gov/docs-filing/esubscription.asp">www.ferc.gov/docs-filing/esubscription.asp</a>.
Dated: November 8, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-24830 Filed 11-12-21; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on November 15, 2021.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.