Notice2021-24231

Empire District Electric Company; Notice of Material Amendment of License Application, Soliciting Comments and Associated Study Requests, and Establishing The Deadline for Submission of Final Amendments

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
November 5, 2021

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 86 Issue 212 (Friday, November 5, 2021)</title>
</head>
<body><pre>
[Federal Register Volume 86, Number 212 (Friday, November 5, 2021)]
[Notices]
[Pages 61206-61207]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2021-24231]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2221-041]


Empire District Electric Company; Notice of Material Amendment of 
License Application, Soliciting Comments and Associated Study Requests, 
and Establishing The Deadline for Submission of Final Amendments

    On February 28, 2020, Empire District Electric Company (Empire 
District) filed, pursuant to sections 4(e) and 15 of the Federal Power 
Act, an application for a new major license to continue operating the 
Ozark Beach Hydroelectric Project No. 2221 (Ozark Beach Project) 
located on the White River in Taney County, Missouri. On March 10, 
2020, the Commission issued a Notice of Application Tendered for Filing 
with the Commission and Establishing Procedural Schedule for Licensing 
and Deadline for Submission of Final Amendments. On August 28, 2020, 
Empire District filed an amendment to the license application.
    The Ozark Beach Project currently occupies 5.1 acres of federal 
land administered by the U.S. Army Corps of Engineers (Corps) and is 
situated between two multipurpose projects owned by the Corps. The 
Corps' Table Rock Project, which is located approximately 22 miles 
upstream of the Ozark Beach Project, is operated in a peaking mode 
based on regional electrical demand requirements. The Ozark Beach 
Project discharges directly into the Corps' Bull Shoals Project 
reservoir, which is located immediately downstream.
    The project currently consists of the following existing 
facilities: (1) A 2,224-acre reservoir (Lake Taneycomo) with a gross 
storage capacity of 21,800 acre-feet and a usable storage capacity of 
6,500 acre-feet at a water surface elevation of 701.35 feet National 
Geodetic Vertical Datum of 1929 (NGVD29); (2) a 1,301-foot-long dam 
consisting of, from west to east: (a) A 420-foot-long earth fill 
embankment with a concrete core wall, (b) an 18-foot-long concrete 
overflow spillway topped with a sharp-crested steel weir having a 
compound section, (c) a 575-foot-long, 53-foot-high, concrete overflow 
spillway topped with 32 4-foot-high Obermeyer gates, (d) an 18-foot-
long concrete non-overflow section, (e) an integral 220-foot-long 
reinforced concrete powerhouse, and (f) a 50-foot-long concrete non-
overflow section; (3) a 220-foot-long, 88-foot-wide, 92-foot-high 
reinforced concrete

[[Page 61207]]

integral powerhouse with an operating head of 50 feet; (4) trash racks 
at the entrance to the intakes; (5) four 7,500 horsepower (5.625 
megawatt (MW)) vertical-shaft Francis-type turbines with a total 
capacity of 30,000 horsepower (22.500 MW), each coupled to a 4.0 MW 
generator with a total installed capacity of 16.0 MW; (6) a 445-foot-
long, 4,600-volt overhead transmission line connected to a three-phase, 
4,600 to 161,000 volt step-up transformer with a rating of 22,400-
kilovolt ampere that connects to Empire District's 161,000-volt 
transmission system; and (7) appurtenant facilities.
    Using the storage in Lake Taneycomo, the Ozark Beach Project is 
currently operated based on various conditions including closely 
matching the releases of the Corps' upstream Table Rock Project, market 
pricing, Lake Taneycomo water level, the water level of the Corps' 
downstream Bull Shoals Project, and rainfall. The project currently 
operates to maintain water surface elevations between 701.35 and 700.00 
feet NGVD29 in Lake Taneycomo. The Ozark Beach Project currently has an 
estimated annual energy production of about 50,768 megawatt-hours.
    In its amended license application, Empire District proposes to 
replace the existing 4-foot-high Obermeyer gates with new 6-foot-high 
Obermeyer gates. As proposed, the water surface elevation of Lake 
Taneycomo would be raised from 701.35 to 703.35 feet NGVD29 when the 6-
foot gates are fully raised. At a water surface elevation of 703.35 
feet NGVD29, Lake Taneycomo would increase from 2,224 to 2,523 acres, 
its gross storage capacity would increase from 21,800 to 24,100 acre-
feet, and its usable storage capacity would increase from 6,500 to 
8,800 acre-feet. As amended, the project would operate between 703.35 
and 700 feet NGVD29, the total generating capacity would remain 16.0 
MW, and the estimated annual energy production would remain about 
50,768 megawatt-hours.
    The current project boundary for the project encompasses 
approximately 8,271 acres of water and land. Empire District proposes 
to modify the current project boundary by removing 5,728 acres for a 
proposed project boundary that encompasses 2,543 acres. Empire 
District's proposal would reduce the existing area of federal land 
occupied by the project from 5.1 acres to 0.64 acre.
    Pursuant to 18 CFR 4.35(f)(1)(ii)(A), the license application as 
amended constitutes a material amendment. This application is not ready 
for environmental analysis at this time. With this notice, we are 
soliciting comments on Empire District's amended application as well as 
study requests. The deadline for filing comments and study requests is 
60 days from the issuance date of this notice.
    The Commission strongly encourages electronic filing. Please file 
comments and study requests using the Commission's eFiling system at 
<a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a>. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the Comment system at <a href="https://ferconline.ferc.gov/QuickComment.aspx">https://ferconline.ferc.gov/QuickComment.aspx</a>. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at <a href="/cdn-cgi/l/email-protection#f9bfbcabbab6979590979caa8c8989968b8db99f9c8b9ad79e968f"><span class="__cf_email__" data-cfemail="f8bebdaabbb7969491969dab8d8888978a8cb89e9d8a9bd69f978e">[email&#160;protected]</span></a>, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, you may submit a 
paper copy. Submissions sent via the U.S. Postal Service must be 
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852. The first page of any filing should 
include docket number P-2221-041.
    In addition to publishing the full text of this notice in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this notice, as well 
as other documents in the proceeding, via the internet through the 
Commission's Home Page (<a href="http://www.ferc.gov">http://www.ferc.gov</a>) using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document (P-2221). At this time, the 
Commission has suspended access to the Commission's Public Reference 
Room, due to the proclamation declaring a National Emergency concerning 
the Novel Coronavirus Disease (COVID-19), issued by the President on 
March 13, 2020. For assistance, contact FERC at 
<a href="/cdn-cgi/l/email-protection#165053445559787a7f787345636666796462567073647538717960"><span class="__cf_email__" data-cfemail="7c3a392e3f3312101512192f090c0c130e083c1a190e1f521b130a">[email&#160;protected]</span></a> or call toll-free, (866) 208-3676 or (202) 
502-8659 (TTY).
    You may also register online at <a href="https://ferconline.ferc.gov/FERCOnline.aspx">https://ferconline.ferc.gov/FERCOnline.aspx</a> to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    Applicant Contact: Randy Richardson, Plant Manager--Energy Center/
Ozark Beach, Empire District Electric Company, 2537 Fir Road, Sarcoxie, 
MO 64862, (417) 625-6138 or <a href="/cdn-cgi/l/email-protection#0f5d5d666c676e7d6b7c60614f63666d6a7d7b767a7b6663667b666a7c216c6062"><span class="__cf_email__" data-cfemail="e5b7b78c868d849781968a8ba5898c878097919c90918c898c918c8096cb868a88">[email&#160;protected]</span></a>.
    FERC Contact: Colleen Corballis at (202) 502-8598 or email at 
<a href="/cdn-cgi/l/email-protection#791a1615151c1c17571a160b1b181515100a391f1c0b1a571e160f"><span class="__cf_email__" data-cfemail="4a292526262f2f2464292538282b262623390a2c2f3829642d253c">[email&#160;protected]</span></a>.
    The Council on Environmental Quality (CEQ) issued a final rule on 
July 15, 2020, revising the regulations under 40 CFR parts 1500-1518 
that federal agencies use to implement NEPA (see Update to the 
Regulations Implementing the Procedural Provisions of the National 
Environmental Policy Act, 85 FR 43,304). The Final Rule became 
effective on and applies to any NEPA process begun after September 14, 
2020. An agency may also apply the regulations to ongoing activities 
and environmental documents begun before September 14, 2020, which 
includes the proposed Ozark Beach Project. Commission staff intends to 
conduct its NEPA review in accordance with CEQ's new regulations.
    Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: November 1, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-24231 Filed 11-4-21; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on November 5, 2021.