Airworthiness Directives; The Boeing Company Airplanes
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
The FAA proposes to adopt a new airworthiness directive (AD) for certain The Boeing Company Model 787-8, 787-9, and 787-10 airplanes. This proposed AD was prompted by reports of a missing shim at a joint common to the main torque box (MTB) skin panel and rear spar root fitting. This proposed AD would require inspecting the MTB skin panel and rear spar root fitting for cracking and delamination, and applicable on-condition actions. The FAA is proposing this AD to address the unsafe condition on these products.
Full Text
<html>
<head>
<title>Federal Register, Volume 86 Issue 206 (Thursday, October 28, 2021)</title>
</head>
<body><pre>
[Federal Register Volume 86, Number 206 (Thursday, October 28, 2021)]
[Proposed Rules]
[Pages 59665-59667]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2021-23218]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2021-0844; Project Identifier AD-2021-00689-T]
RIN 2120-AA64
Airworthiness Directives; The Boeing Company Airplanes
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Notice of proposed rulemaking (NPRM).
-----------------------------------------------------------------------
SUMMARY: The FAA proposes to adopt a new airworthiness directive (AD)
for certain The Boeing Company Model 787-8, 787-9, and 787-10
airplanes. This proposed AD was prompted by reports of a missing shim
at a joint common to the main torque box (MTB) skin panel and rear spar
root fitting. This proposed AD would require inspecting the MTB skin
panel and rear spar root fitting for cracking and delamination, and
applicable on-condition actions. The FAA is proposing this AD to
address the unsafe condition on these products.
DATES: The FAA must receive comments on this proposed AD by December
13, 2021.
ADDRESSES: You may send comments, using the procedures found in 14 CFR
11.43 and 11.45, by any of the following methods:
<bullet> Federal eRulemaking Portal: Go to <a href="https://www.regulations.gov">https://www.regulations.gov</a>. Follow the instructions for submitting comments.
<bullet> Fax: 202-493-2251.
<bullet> Mail: U.S. Department of Transportation, Docket
Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New
Jersey Avenue SE, Washington, DC 20590.
<bullet> Hand Delivery: Deliver to Mail address above between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
For service information identified in this NPRM, contact Boeing
Commercial Airplanes, Attention: Contractual & Data Services (C&DS),
2600 Westminster Blvd., MC 110-SK57, Seal Beach, CA 90740-5600;
telephone 562-797-1717; internet <a href="https://www.myboeingfleet.com">https://www.myboeingfleet.com</a>. You may
view this referenced service information at the FAA, Airworthiness
Products Section, Operational Safety Branch, 2200 South 216th St., Des
Moines, WA. For information on the availability of this material at the
FAA, call 206-231-3195. It is also available at <a href="https://www.regulations.gov">https://www.regulations.gov</a> by searching for and locating Docket No. FAA-2021-
0844.
Examining the AD Docket
You may examine the AD docket at <a href="https://www.regulations.gov">https://www.regulations.gov</a> by
searching for and locating Docket No. FAA-2021-0844; or in person at
Docket Operations between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays. The AD docket contains this NPRM, any comments
received, and other information. The street address for Docket
Operations is listed above.
FOR FURTHER INFORMATION CONTACT: Joseph Hodgin, Aerospace Engineer,
Airframe Section, FAA, Seattle ACO Branch, 2200 South 216th St., Des
Moines, WA 98198; phone and fax: 206-231-3962; email:
<a href="/cdn-cgi/l/email-protection#bdd7d2ced8cdd593d793d5d2d9dad4d3fddbdcdc93dad2cb"><span class="__cf_email__" data-cfemail="83e9ecf0e6f3ebade9adebece7e4eaedc3e5e2e2ade4ecf5">[email protected]</span></a>.
SUPPLEMENTARY INFORMATION:
Comments Invited
The FAA invites you to send any written relevant data, views, or
arguments about this proposal. Send your comments to an address listed
under ADDRESSES. Include ``Docket No. FAA-2021-0844; Project Identifier
AD-2021-00689-T'' at the beginning of your comments. The most helpful
comments reference a specific portion of the proposal, explain the
reason for any recommended change, and include supporting data. The FAA
will consider all comments received by the closing date and may amend
this proposal because of those comments.
Except for Confidential Business Information (CBI) as described in
the following paragraph, and other information as described in 14 CFR
11.35, the FAA will post all comments received, without change, to
<a href="https://www.regulations.gov">https://www.regulations.gov</a>, including any personal information you
provide. The agency will also post a report summarizing each
substantive verbal contact received about this NPRM.
[[Page 59666]]
Confidential Business Information
CBI is commercial or financial information that is both customarily
and actually treated as private by its owner. Under the Freedom of
Information Act (FOIA) (5 U.S.C. 552), CBI is exempt from public
disclosure. If your comments responsive to this NPRM contain commercial
or financial information that is customarily treated as private, that
you actually treat as private, and that is relevant or responsive to
this NPRM, it is important that you clearly designate the submitted
comments as CBI. Please mark each page of your submission containing
CBI as ``PROPIN.'' The FAA will treat such marked submissions as
confidential under the FOIA, and they will not be placed in the public
docket of this NPRM. Submissions containing CBI should be sent to
Joseph Hodgin, Aerospace Engineer, Airframe Section, FAA, Seattle ACO
Branch, 2200 South 216th St., Des Moines, WA 98198; phone and fax: 206-
231-3962; email: <a href="/cdn-cgi/l/email-protection#0f65607c6a7f6721652167606b6866614f696e6e21686079"><span class="__cf_email__" data-cfemail="1d77726e786d753377337572797a74735d7b7c7c337a726b">[email protected]</span></a>. Any commentary that the FAA
receives which is not specifically designated as CBI will be placed in
the public docket for this rulemaking.
Background
The FAA has received a report indicating that a skin depression was
noticed on the vertical fin, located at a joint common to the MTB skin
panel, rear spar, and root fitting #4. The cause was discovered to be
the omission of a shim during production, between the MTB skin panel
and rear spar flange at the attachment to the root fitting. This
condition, if not addressed, could result in a reduction in fatigue
performance of the MTB skin panel and rear spar root fittings, which
could affect the structural integrity of the airplane.
FAA's Determination
The FAA is issuing this NPRM after determining that the unsafe
condition described previously is likely to exist or develop on other
products of the same type design.
Related Service Information Under 1 CFR Part 51
The FAA reviewed Boeing Alert Requirements Bulletin B787-81205-
SB550011-00 RB, Issue 001, dated May 18, 2021. This service information
specifies procedures for an ultrasonic test for cracking and
delamination of the skin panel, an open hole high frequency eddy
current (HFEC) inspection for cracking of the rear spar root fitting at
the fastener holes common to the MTB skin panel and rear spar root
fitting interface, and a surface HFEC inspection for cracking of
visible rear spar root fitting surface areas, and applicable on-
condition actions. On-condition actions include measurement of the gap
between the MTB skin panel and the rear spar flange, installation of a
new shim between the MTB skin panel and the rear spar flange, and
installation of new fasteners in the MTB skin panel and the rear spar
flange.
This service information is reasonably available because the
interested parties have access to it through their normal course of
business or by the means identified in ADDRESSES.
Proposed AD Requirements in This NPRM
This proposed AD would require accomplishing the actions specified
in the service information already described, except for any
differences identified as exceptions in the regulatory text of this
proposed AD. For information on the procedures and compliance times,
see this service information at <a href="https://www.regulations.gov">https://www.regulations.gov</a> by
searching for and locating Docket No. FAA-2021-0844.
Costs of Compliance
The FAA estimates that this AD, if adopted as proposed, would
affect 91 airplanes of U.S. registry. The FAA estimates the following
costs to comply with this proposed AD:
Estimated Costs
----------------------------------------------------------------------------------------------------------------
Cost per Cost on U.S.
Action Labor cost Parts cost product operators
----------------------------------------------------------------------------------------------------------------
Inspections........................ 14 work-hours x $85 per $0 $1,190 $108,290
hour = $1,190.
----------------------------------------------------------------------------------------------------------------
The FAA estimates the following costs to do any necessary
measurements and installations that would be required based on the
results of the proposed inspection. The agency has no way of
determining the number of aircraft that might need these actions:
On-Condition Costs
----------------------------------------------------------------------------------------------------------------
Cost per
Action Labor cost Parts cost product
----------------------------------------------------------------------------------------------------------------
Gap measurement............................... 1 work-hour x $85 per hour = $85 $0 $85
Installation.................................. 10 work-hours x $85 per hour = $11,330 $12,180
$850.
----------------------------------------------------------------------------------------------------------------
The FAA has received no definitive data on which to base the cost
estimates for the repairs specified in this proposed AD.
The FAA has included all known costs in its cost estimate.
According to the manufacturer, however, some or all of the costs of
this proposed AD may be covered under warranty, thereby reducing the
cost impact on affected operators.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. Subtitle VII: Aviation Programs,
describes in more detail the scope of the Agency's authority.
The FAA is issuing this rulemaking under the authority described in
Subtitle VII, Part A, Subpart III, Section 44701: General requirements.
Under that section, Congress charges the FAA with promoting safe flight
of civil aircraft in air commerce by prescribing regulations for
practices, methods, and procedures the Administrator finds necessary
for safety in air commerce. This regulation is within the scope of that
authority because it addresses an unsafe condition that is likely to
exist or
[[Page 59667]]
develop on products identified in this rulemaking action.
Regulatory Findings
The FAA determined that this proposed AD would not have federalism
implications under Executive Order 13132. This proposed AD would not
have a substantial direct effect on the States, on the relationship
between the national Government and the States, or on the distribution
of power and responsibilities among the various levels of government.
For the reasons discussed above, I certify this proposed
regulation:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866,
(2) Would not affect intrastate aviation in Alaska, and
(3) Would not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
The Proposed Amendment
Accordingly, under the authority delegated to me by the
Administrator, the FAA proposes to amend 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by adding the following new airworthiness
directive:
The Boeing Company: Docket No. FAA-2021-0844; Project Identifier AD-
2021-00689-T.
(a) Comments Due Date
The FAA must receive comments on this airworthiness directive
(AD) by December 13, 2021.
(b) Affected ADs
None.
(c) Applicability
This AD applies to The Boeing Company Model 787-8, 787-9, and
787-10 airplanes, certificated in any category, as specified in
Boeing Alert Requirements Bulletin B787-81205-SB550011-00 RB, Issue
001, dated May 18, 2021.
(d) Subject
Air Transport Association (ATA) of America Code 55, Stabilizers.
(e) Unsafe Condition
This AD was prompted by reports of a missing shim at a joint
common to the main torque box (MTB) skin panel and rear spar root
fitting. The FAA is issuing this AD to address the omission of a
shim between the MTB skin panel and rear spar flange at the
attachment to the root fitting. This condition, if not addressed,
could result in a reduction in fatigue performance of the MTB skin
panel and rear spar root fittings, which could affect the structural
integrity of the airplane.
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
(g) Required Actions
Except as specified by paragraph (h) of this AD: At the
applicable times specified in the ``Compliance'' paragraph of Boeing
Alert Requirements Bulletin B787-81205-SB550011-00 RB, Issue 001,
dated May 18, 2021, do all applicable actions identified in, and in
accordance with, the Accomplishment Instructions of Boeing Alert
Requirements Bulletin B787-81205-SB550011-00 RB, Issue 001, dated
May 18, 2021.
Note 1 to paragraph (g): Guidance for accomplishing the actions
required by this AD can be found in Boeing Alert Service Bulletin
B787-81205-SB550011-00, Issue 001, dated May 18, 2021, which is
referred to in Boeing Alert Requirements Bulletin B787-81205-
SB550011-00 RB, Issue 001, dated May 18, 2021.
(h) Exceptions to Service Information Specifications
Where Boeing Alert Requirements Bulletin B787-81205-SB550011-00
RB, Issue 001, dated May 18, 2021, specifies contacting Boeing for
repair instructions: This AD requires doing the repair before
further flight using a method approved in accordance with the
procedures specified in paragraph (i) of this AD.
(i) Alternative Methods of Compliance (AMOCs)
(1) The Manager, Seattle ACO Branch, FAA, has the authority to
approve AMOCs for this AD, if requested using the procedures found
in 14 CFR 39.19. In accordance with 14 CFR 39.19, send your request
to your principal inspector or responsible Flight Standards Office,
as appropriate. If sending information directly to the manager of
the certification office, send it to the attention of the person
identified in Related Information. Information may be emailed to: <a href="/cdn-cgi/l/email-protection#ecd5c1ada2a1c1bf898d98988089c1adafa3c1ada1a3afc1be899d99899f989fac8a8d8dc28b839a"><span class="__cf_email__" data-cfemail="e5dcc8a4aba8c8b6808491918980c8a4a6aac8a4a8aaa6c8b780949080969196a5838484cb828a93">[email protected]</span></a>.
(2) Before using any approved AMOC, notify your appropriate
principal inspector, or lacking a principal inspector, the manager
of the responsible Flight Standards Office.
(3) An AMOC that provides an acceptable level of safety may be
used for any repair, modification, or alteration required by this AD
if it is approved by The Boeing Company Organization Designation
Authorization (ODA) that has been authorized by the Manager, Seattle
ACO Branch, FAA, to make those findings. To be approved, the repair
method, modification deviation, or alteration deviation must meet
the certification basis of the airplane, and the approval must
specifically refer to this AD.
(j) Related Information
(1) For more information about this AD, contact Joseph Hodgin,
Aerospace Engineer, Airframe Section, FAA, Seattle ACO Branch, 2200
South 216th St., Des Moines, WA 98198; phone and fax: 206-231-3962;
email: <a href="/cdn-cgi/l/email-protection#0a6065796f7a6224602462656e6d63644a6c6b6b246d657c"><span class="__cf_email__" data-cfemail="2a4045594f5a4204400442454e4d43446a4c4b4b044d455c">[email protected]</span></a>.
(2) For service information identified in this AD, contact
Boeing Commercial Airplanes, Attention: Contractual & Data Services
(C&DS), 2600 Westminster Blvd., MC 110-SK57, Seal Beach, CA 90740-
5600; telephone 562-797-1717; internet <a href="https://www.myboeingfleet.com">https://www.myboeingfleet.com</a>. You may view this referenced service
information at the FAA, Airworthiness Products Section, Operational
Safety Branch, 2200 South 216th St., Des Moines, WA. For information
on the availability of this material at the FAA, call 206-231-3195.
Issued on September 30, 2021.
Lance T. Gant,
Director, Compliance & Airworthiness Division, Aircraft Certification
Service.
[FR Doc. 2021-23218 Filed 10-27-21; 8:45 am]
BILLING CODE 4910-13-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.