Notice2021-22020
Information Collection: Requirements for Renewal of Operating Licenses for Nuclear Power Plants
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
October 8, 2021
Issuing agencies
Nuclear Regulatory Commission
Abstract
The U.S. Nuclear Regulatory Commission (NRC) has recently submitted a request for renewal of an existing collection of information to the Office of Management and Budget (OMB) for review. The information collection is entitled, "Requirements for Renewal of Operating Licenses for Nuclear Power Plants."
Full Text
<html>
<head>
<title>Federal Register, Volume 86 Issue 193 (Friday, October 8, 2021)</title>
</head>
<body><pre>
[Federal Register Volume 86, Number 193 (Friday, October 8, 2021)]
[Notices]
[Pages 56295-56296]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2021-22020]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2021-0035]
Information Collection: Requirements for Renewal of Operating
Licenses for Nuclear Power Plants
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of submission to the Office of Management and Budget;
request for comment.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has recently
submitted a request for renewal of an existing collection of
information to the Office of Management and Budget (OMB) for review.
The information collection is entitled, ``Requirements for Renewal of
Operating Licenses for Nuclear Power Plants.''
DATES: Submit comments by November 8, 2021. Comments received after
this date will be considered if it is practical to do so, but the
Commission is able to
[[Page 56296]]
ensure consideration only for comments received on or before this date.
ADDRESSES: Written comments and recommendations for the proposed
information collection should be sent within 30 days of publication of
this notice to <a href="https://www.reginfo.gov/public/do/PRAMain">https://www.reginfo.gov/public/do/PRAMain</a>. Find this
particular information collection by selecting ``Currently under
Review--Open for Public Comments'' or by using the search function.
FOR FURTHER INFORMATION CONTACT: David C. Cullison, NRC Clearance
Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001;
telephone: 301-415-2084; email: <a href="/cdn-cgi/l/email-protection#034a6d656c606c6f6f666077702d5166706c76716066436d71602d646c75"><span class="__cf_email__" data-cfemail="11587f777e727e7d7d747265623f4374627e64637274517f63723f767e67">[email protected]</span></a>.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2021-0035 when contacting the NRC
about the availability of information for this action. You may obtain
publicly available information related to this action by any of the
following methods:
<bullet> Federal Rulemaking Website: Go to <a href="https://www.regulations.gov/">https://www.regulations.gov/</a> and search for Docket ID NRC-2021-0035.
<bullet> NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at <a href="https://www.nrc.gov/reading-rm/adams.html">https://www.nrc.gov/reading-rm/adams.html</a>. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to <a href="/cdn-cgi/l/email-protection#354551471b4750465a40475650755b47561b525a43"><span class="__cf_email__" data-cfemail="1b6b7f6935697e68746e69787e5b756978357c746d">[email protected]</span></a>. The supporting statement is available
in ADAMS under Accession No. ML21168A068.
<bullet> Attention: The PDR, where you may examine and order copies
of public documents, is currently closed. You may submit your request
to the PDR via email at <a href="/cdn-cgi/l/email-protection#364652441844534559434455537658445518515940"><span class="__cf_email__" data-cfemail="7a0a1e0854081f09150f08191f3a140819541d150c">[email protected]</span></a> or call 1-800-397-4209 or
301-415-4737, between 8:00 a.m. and 4:00 p.m. (ET), Monday through
Friday, except Federal holidays.
<bullet> NRC's Clearance Officer: A copy of the collection of
information and related instructions may be obtained without charge by
contacting the NRC's Clearance Officer, David C. Cullison, Office of
the Chief Information Officer, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001; telephone: 301-415-2084; email:
<a href="/cdn-cgi/l/email-protection#e7ae89818884888b8b82849394c9b582948892958482a7899584c9808891"><span class="__cf_email__" data-cfemail="6821060e070b0704040d0b1c1b463a0d1b071d1a0b0d28061a0b460f071e">[email protected]</span></a>.
B. Submitting Comments
Written comments and recommendations for the proposed information
collection should be sent within 30 days of publication of this notice
to <a href="https://www.reginfo.gov/public/do/PRAMain">https://www.reginfo.gov/public/do/PRAMain</a>. Find this particular
information collection by selecting ``Currently under Review--Open for
Public Comments'' or by using the search function.
The NRC cautions you not to include identifying or contact
information in comment submissions that you do not want to be publicly
disclosed in your comment submission. All comment submissions are
posted at <a href="https://www.regulations.gov/">https://www.regulations.gov/</a> and entered into ADAMS. Comment
submissions are not routinely edited to remove identifying or contact
information.
If you are requesting or aggregating comments from other persons
for submission to the OMB, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that comment submissions are not routinely edited to remove such
information before making the comment submissions available to the
public or entering the comment into ADAMS.
II. Background
Under the provisions of the Paperwork Reduction Act of 1995 (44
U.S.C. Chapter 35), the NRC recently submitted a request for renewal of
an existing collection of information to OMB for review entitled, Part
54 of title 10 of the Code of Federal Regulations (10 CFR),
``Requirements for Renewal of Operating Licenses for Nuclear Power
Plants.'' The NRC hereby informs potential respondents that an agency
may not conduct or sponsor, and that a person is not required to
respond to, a collection of information unless it displays a currently
valid OMB control number.
The NRC published a Federal Register notice with a 60-day comment
period on this information collection on May 19, 2021 (86 FR 27119). On
August 23, 2021, the NRC published a Federal Register notice with a 30-
day comment period (86 FR 47166). The NRC was delayed in submitting the
renewal to OMB, therefore, the NRC is reissuing this information
collection to provide the public the full 30 days to submit comments.
1. The title of the information collection: 10 CFR part 54
``Requirements for Renewal of Operating Licenses for Nuclear Power
Plants.''
2. OMB approval number: 3150-0155.
3. Type of submission: Extension.
4. The form number, if applicable: Not Applicable.
5. How often the collection is required or requested: There is a
one-time application for any licensee wishing to renew the operating
license for its nuclear power plant. There is a one-time requirement
for each licensee with a renewed operating license to submit a letter
documenting the completion of inspection and testing activities. All
holders of renewed licenses must perform yearly record keeping.
6. Who will be required or asked to respond: Commercial nuclear
power plant licensees who wish to renew their operating licenses and
holders of renewed licenses.
7. The estimated number of annual responses: 66 (11 reporting
responses + 55 recordkeepers).
8. The estimated number of annual respondents: 62 (1 initial
license renewal application + 1 subsequent license renewal application
+ 5 completion letters + 55 recordkeepers).
9. The estimated number of hours needed annually to comply with the
information collection requirement or request: 216,700 (160,200 hours
reporting + 56,500 hours recordkeeping).
10. Abstract: 10 CFR part 54 establishes license renewal
requirements for commercial nuclear power plants and describes the
information that licensees must submit to the NRC when applying for a
license renewal. The application must contain information on how the
licensee will manage the detrimental effects of age-related degradation
on certain plant systems, structures, and components to continue the
plant's safe operation during the renewal term. The NRC needs this
information to determine whether the licensee's actions will be
effective in assuring the plants' continued safe operation during the
period of extended operation. Holders of renewed licenses must retain
in an auditable and retrievable form, for the term of the renewed
operating license, all information and documentation required to
document compliance with 10 CFR part 54. The NRC needs access to this
information for continuing effective regulatory oversight.
Dated: October 5, 2021.
For the Nuclear Regulatory Commission.
David C. Cullison,
NRC Clearance Officer, Office of the Chief Information Officer.
[FR Doc. 2021-22020 Filed 10-7-21; 8:45 am]
BILLING CODE 7590-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on October 8, 2021.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.