City of North Little Rock; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
September 29, 2021
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 86 Issue 186 (Wednesday, September 29, 2021)</title>
</head>
<body><pre>
[Federal Register Volume 86, Number 186 (Wednesday, September 29, 2021)]
[Notices]
[Page 53956]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2021-21156]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15226-000]
City of North Little Rock; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On June 28, 2021, the City of North Little Rock filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study the feasibility of the Toad Suck
Ferry Lock & Dam Hydroelectric Project No. 15226-000 (Toad Suck Ferry
Project, or project), a run-of-river project to be located at the
existing U.S. Army Corps of Engineers' Toad Suck Ferry Lock and Dam in
Faulkner County, Arkansas. The sole purpose of a preliminary permit, if
issued, is to grant the permit holder priority to file a license
application during the permit term. A preliminary permit does not
authorize the permit holder to perform any land-disturbing activities
or otherwise enter upon lands or waters owned by others without the
owners' express permission.
The proposed project would consist of the following: (1) An
existing reservoir with a maximum water surface elevation of 265.3 feet
mean sea level; (2) an existing, 1,450-foot-long lock and dam,
including a 1,120-foot-long spillway section with 16, 60-foot-long by
27-foot-high tainter gates; (3) a new headrace intake channel; (4) a
new concrete powerhouse housing one, 40-megawatt horizontal turbine-
generator unit; (5) a new discharge penstock; (6) a new tailrace
receiving flow from the penstock; (7) a new interconnection line to
either the existing, 69 kilo-Volt (kV) Bigelow substation, or the
existing, 115-kV Mayflower substation; and (8) appurtenant facilities.
Applicant Contact: Scott Springer, 1400 W Maryland Ave., North
Little Rock, Arkansas, 72120; phone: (501) 372-0100.
FERC Contact: Navreet Deo; phone: (202) 502-6304; email:
<a href="/cdn-cgi/l/email-protection#c6a8a7b0b4a3a3b2e8a2a3a986a0a3b4a5e8a1a9b0"><span class="__cf_email__" data-cfemail="7917180f0b1c1c0d571d1c16391f1c0b1a571e160f">[email protected]</span></a>.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at <a href="http://www.ferc.gov/docs-filing/efiling.asp">http://www.ferc.gov/docs-filing/efiling.asp</a>. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at <a href="http://www.ferc.gov/docs-filing/ecomment.asp">http://www.ferc.gov/docs-filing/ecomment.asp</a>. You
must include your name and contact information at the end of your
comments. In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. The first page of any filing should include docket
number P-15226-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's website at <a href="http://www.ferc.gov/docs-filing/elibrary.asp">http://www.ferc.gov/docs-filing/elibrary.asp</a>.
Enter the docket number (P-15226) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: September 23, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-21156 Filed 9-28-21; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on September 29, 2021.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.