Notice2021-19785
Kinet, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
September 14, 2021
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 86 Issue 175 (Tuesday, September 14, 2021)</title>
</head>
<body><pre>
[Federal Register Volume 86, Number 175 (Tuesday, September 14, 2021)]
[Notices]
[Page 51139]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2021-19785]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15113-000]
Kinet, Inc.; Notice of Preliminary Permit Application Accepted
for Filing and Soliciting Comments, Motions To Intervene, and Competing
Applications
On April 12, 2021, Kinet, Inc., filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Coons Rapid Hydroelectric
Project to be located on the Mississippi River, near the Towns of
Brooklyn Park and Coon Rapids, in Hennepin County, Minnesota. The sole
purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would utilize the impoundment formed by the
Hennepin County Dam owned and operated by Suburban Hennepin Regional
Park District (Three Rivers Park District) and consist of the
following: (1) An existing 975-foot-long by 35-foot-high concrete dam;
(2) a 160-square-mile reservoir with a normal storage volume of 1,380
acre-feet at a normal pool elevation of 830 feet mean sea level; (3)
three 52-foot-long by 102-foot-wide by 33-foot-high concrete- intake
structures with varying depths of between 8 to 32 feet; (4) a new 120-
foot-wide by 60-foot-long by 33-foot-high concrete powerhouse
containing fifteen 751-kilowatt (kW) turbine-generators for a total
project capacity of 10,275 kW; (5) a 54-foot-long by 306-foot-wide
tailrace; (6) a 1,200-foot-long, 115-kilovolt transmission line; and
(7) appurtenant facilities. The estimated annual generation of the Coon
Rapids Hydroelectric Project would be 62,539 megawatt-hours.
Applicant Contact: Mr. Dan Panko, Kinet, Inc, 2401 Monarch Street,
Alameda, CA 94501; phone: (802) 578-7973; email: <a href="/cdn-cgi/l/email-protection#cea5a7a0abba8ea0afbaaba2aba0abbca9b7e0ada1a3"><span class="__cf_email__" data-cfemail="1c77757279685c727d6879707972796e7b65327f7371">[email protected]</span></a>.
FERC Contact: Tyrone Williams; phone: (202) 502-6331.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at <a href="http://www.ferc.gov/docs-filing/efiling.asp">http://www.ferc.gov/docs-filing/efiling.asp</a>. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at <a href="http://www.ferc.gov/docs-filing/ecomment.asp">http://www.ferc.gov/docs-filing/ecomment.asp</a>. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
<a href="/cdn-cgi/l/email-protection#e6a0a3b4a5a9888a8f8883b5939696899492a680839485c8818990"><span class="__cf_email__" data-cfemail="1d5b584f5e5273717473784e686d6d726f695d7b786f7e337a726b">[email protected]</span></a>, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. The first page of any filing should include docket
number P-15113-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's website at <a href="http://www.ferc.gov/docs-filing/elibrary.asp">http://www.ferc.gov/docs-filing/elibrary.asp</a>.
Enter the docket number (P-15113) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: September 8, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-19785 Filed 9-13-21; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on September 14, 2021.
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.