Brookfield White Pine Hydro, LLC; Errol Hydro Co., LLC; Notice of Application Tendered for Filing With The Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
August 12, 2021

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 86 Issue 153 (Thursday, August 12, 2021)</title>
</head>
<body><pre>
[Federal Register Volume 86, Number 153 (Thursday, August 12, 2021)]
[Notices]
[Page 44355]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2021-17240]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 3133-033]


Brookfield White Pine Hydro, LLC; Errol Hydro Co., LLC; Notice of 
Application Tendered for Filing With The Commission and Establishing 
Procedural Schedule for Licensing and Deadline for Submission of Final 
Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 3133-033.
    c. Date Filed: July 30, 2021.
    d. Applicant: Brookfield White Pine Hydro, LLC and Errol 
Hydroelectric Co., LLC (licensees).
    e. Name of Project: Errol Hydroelectric Project (Errol Project).
    f. Location: The Errol Project is located on the Androscoggin River 
and Umbagog Lake, near the Town of Errol, and Township of Cambridge, 
NH, in Coos Wing County, New Hampshire and the Towns of Magalloway 
Plantation and Upton in Oxford County, Maine. The project occupies 
3,285 acres federal land in the Umbagog National Wildlife Refuge 
administered by the U.S. Fish and Wildlife Service.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Mr. Tom Uncher, Vice President, Brookfield 
White Pine Hydro, LLC, Errol Hydroelectric Co., LLC, 339B Big Bay Rd., 
Queensbury, NY 12804 Phone at: (518) 743-2018 
<a href="/cdn-cgi/l/email-protection#aefac6c1c3cfdd80fbc0cdc6cbdceeccdcc1c1c5c8c7cbc2cadccbc0cbd9cfccc2cb80cdc1c3"><span class="__cf_email__" data-cfemail="e8bc808785899bc6bd868b808d9aa88a9a8787838e818d848c9a8d868d9f898a848dc68b8785">[email&#160;protected]</span></a>.
    i. FERC Contact: Kelly Wolcott at (202) 502-6480 or email at 
<a href="/cdn-cgi/l/email-protection#365d535a5a4f1841595a55594242765053445518515940"><span class="__cf_email__" data-cfemail="d5beb0b9b9acfba2bab9b6baa1a195b3b0a7b6fbb2baa3">[email&#160;protected]</span></a>.
    j. This application is not ready for environmental analysis at this 
time.
    k. The Errol Project consists of: (1) An existing dam consisting of 
a 25-foot-high, 202.5- foot-long gated section separated by rock-filled 
timber or concrete crib piers supporting five sluice gates and seven 
deep gates, and an earthen dike with a sheet steel cut-off wall on the 
upstream side, extending approximately 50 feet from the end of the 
gated section of the dam to the northwestern wall of the powerhouse and 
then extending another approximately 70 feet from the southeastern 
powerhouse wall to the eastern embankment; (2) an approximately 9,098-
acre project impoundment with a storage capacity of 89,568 acre-feet at 
a normal pond elevation of 1,247 feet, which includes an approximately 
3-mile-long reach of the Androscoggin River above Errol Dam, Umbagog 
Lake, and approximately 4.3 miles of the Magalloway River; (3) a 
reinforced concrete powerhouse containing one horizontal double 
regulated bulb turbine-generator unit with a hydraulic capacity of 
2,600 cubic feet per second and an authorized installed generating 
capacity of 2,031 kilowatts (kW); (4) an approximately 80-foot-long 
tailrace; (5) a 3,333-kilovolt-ampere substation power transformer; and 
(6) appurtenant facilities.
    The Errol Project is operated in accordance with the current 
license, and three water agreements that dictate operational flows in 
the watershed for other hydropower developments and for waterfowl 
nesting, with an estimated annual energy production of approximately 
15,944 megawatt hours. The licensees propose to operate the project 
allowing for seasonal flows necessary for waterfowl nesting in Umbagog 
Lake and spring runoff and does not propose any new construction to the 
project. A license amendment was issued for the project in 2016 (156 
FERC ] 62,045 (2016)), which approved the installation of a sixth 
turbine generator unit, which would increase the total installed 
capacity to 3,542.5 kW; however, the additional generator unit has not 
yet been installed.
    l. A copy of the application can be viewed on the Commission's 
website at <a href="http://www.ferc.gov">http://www.ferc.gov</a> using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. At this time, the Commission has 
suspended access to the Commission's Public Reference Room due to the 
proclamation declaring a National Emergency concerning the Novel 
Coronavirus Disease (COVID-19) issued on March 13, 2020. For 
assistance, contact FERC at <a href="/cdn-cgi/l/email-protection#21676473626e4f4d484f44725451514e535561474453420f464e57"><span class="__cf_email__" data-cfemail="14525146575b7a787d7a71476164647b666054727166773a737b62">[email&#160;protected]</span></a> or call toll-
free, (866) 208-3676 or (202) 502-8659 (TTY).
    m. You may also register online at <a href="http://www.ferc.gov/docs-filing/esubscription.asp">http://www.ferc.gov/docs-filing/esubscription.asp</a> to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Procedural schedule: The application will be processed according 
to the following preliminary schedule. Revisions to the schedule will 
be made as appropriate.

------------------------------------------------------------------------
               Milestone                           Target date
------------------------------------------------------------------------
Issue Deficiency Letter (if necessary)  September 2021.
Request Additional Information........  September 2021.
Notice of Acceptance December.........  2021.
Notice of Ready for Environmental
 Analysis TBD.
------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: August 6, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-17240 Filed 8-11-21; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on August 12, 2021.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.