Abstract

The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 6 to Regulatory Guide (RG) 1.29, "Seismic Design Classification for Nuclear Power Plants." This RG describes a method that the staff of the NRC considers acceptable for use in identifying and classifying those features of light-water-reactor nuclear power plants that must be designed to withstand the effects of the safe- shutdown earthquake. Revision 6 corrects a minor error in the numbering of the elements in Section C, "Staff Regulatory Guidance."

Full Text

<html>
<head>
<title>Federal Register, Volume 86 Issue 145 (Monday, August 2, 2021)</title>
</head>
<body><pre>
[Federal Register Volume 86, Number 145 (Monday, August 2, 2021)]
[Notices]
[Page 41525]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2021-16343]



[[Page 41525]]

=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2015-0220]


Seismic Design Classification for Nuclear Power Plants

AGENCY: Nuclear Regulatory Commission.

ACTION: Regulatory guide; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing 
Revision 6 to Regulatory Guide (RG) 1.29, ``Seismic Design 
Classification for Nuclear Power Plants.'' This RG describes a method 
that the staff of the NRC considers acceptable for use in identifying 
and classifying those features of light-water-reactor nuclear power 
plants that must be designed to withstand the effects of the safe-
shutdown earthquake. Revision 6 corrects a minor error in the numbering 
of the elements in Section C, ``Staff Regulatory Guidance.''

DATES: RG 1.29 is available on August 2, 2021.

ADDRESSES: Please refer to Docket ID NRC-2015-0220 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly available information related to this document 
using any of the following methods:
    <bullet> Federal Rulemaking Website: Go to <a href="https://www.regulations.gov">https://www.regulations.gov</a> and search for Docket ID NRC-2015-0220. Address 
questions about Docket IDs in <a href="http://Regulations.gov">Regulations.gov</a> to Stacy Schumann; 
telephone: 301-415-0624; email: <a href="/cdn-cgi/l/email-protection#55062134362c7b06363d2038343b3b153b27367b323a23"><span class="__cf_email__" data-cfemail="b7e4c3d6d4ce99e4d4dfc2dad6d9d9f7d9c5d499d0d8c1">[email&#160;protected]</span></a>. For technical 
questions, contact the individuals listed in the FOR FURTHER 
INFORMATION CONTACT section of this document.
    <bullet> NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at <a href="https://www.nrc.gov/reading-rm/adams.html">https://www.nrc.gov/reading-rm/adams.html</a>. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to <a href="/cdn-cgi/l/email-protection#4b3b2f3965392e38243e39282e0b253928652c243d"><span class="__cf_email__" data-cfemail="38485c4a164a5d4b574d4a5b5d78564a5b165f574e">[email&#160;protected]</span></a>. The ADAMS accession number for each 
document referenced (if it is available in ADAMS) is provided the first 
time that it is mentioned in this document.
    <bullet> Attention: The PDR, where you may examine and order copies 
of public documents, is currently closed. You may submit your request 
to the PDR via email at <a href="/cdn-cgi/l/email-protection#a4d4c0d68ad6c1d7cbd1d6c7c1e4cad6c78ac3cbd2"><span class="__cf_email__" data-cfemail="dcacb8aef2aeb9afb3a9aebfb99cb2aebff2bbb3aa">[email&#160;protected]</span></a> or call 1-800-397-4209 or 
301-415-4737, between 8:00 a.m. and 4:00 p.m. (ET), Monday through 
Friday, except Federal holidays.
    Revision 6 to RG 1.29 and the regulatory analysis may be found in 
ADAMS under Accession Nos. ML21155A003 and ML21155A004, respectively.
    Regulatory guides are not copyrighted, and NRC approval is not 
required to reproduce them.

FOR FURTHER INFORMATION CONTACT: Yuken Wong, Office of Nuclear Reactor 
Regulation, telephone: 301-415-0500, email: <a href="/cdn-cgi/l/email-protection#b7eec2dcd2d999e0d8d9d0f7d9c5d499d0d8c1"><span class="__cf_email__" data-cfemail="59002c323c37770e36373e19372b3a773e362f">[email&#160;protected]</span></a> and 
Edward O'Donnell, Office of Nuclear Regulatory Research, telephone: 
301-415-3317, email: <a href="/cdn-cgi/l/email-protection#155071627467713b5a717a7b7b707979557b67763b727a63"><span class="__cf_email__" data-cfemail="511435263023357f1e353e3f3f343d3d113f23327f363e27">[email&#160;protected]</span></a>. Both are staff of the 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.

SUPPLEMENTARY INFORMATION:

I. Discussion

    The NRC is issuing a revision to an existing guide in the NRC's 
``Regulatory Guide'' series. This series was developed to describe and 
make available to the public information regarding methods that are 
acceptable to the NRC staff for implementing specific parts of the 
agency's regulations, techniques that the NRC staff uses in evaluating 
specific issues or postulated events, and data that the NRC staff needs 
in its review of applications for permits and licenses.

II. Additional Information

    RG 1.29, Revision 6 corrects a minor error in the numbering within 
the Section C, ``Staff Regulatory Guidance.'' What was C.1.i became 
C.2. This results in C.2 becoming C.3 and C.3 became C.4. In addition, 
RG 1.29 was reformatted to conform with the current template for 
Regulatory Guides.

III. Congressional Review Act

    This RG is a rule as defined in the Congressional Review Act (5 
U.S.C. 801-808). However, the Office of Management and Budget has not 
found it to be a major rule as defined in the Congressional Review Act.

IV. Backfitting and Issue Finality

    Issuance of RG 1.29 does not constitute backfitting as defined in 
Section 50.109 of title 10 of the Code of Federal Regulations (10 CFR), 
``Backfitting,'' and as described in NRC Management Directive (MD) 8.4, 
``Management of Backfitting, Forward Fitting, Issue Finality, and 
Information Requests''; constitute forward fitting as that term is 
defined and described in MD 8.4; or affect issue finality of any 
approval issued under 10 CFR part 52, ``Licenses, Certificates, and 
Approvals for Nuclear Power Plants.'' As explained in this regulatory 
guide, applicants and licensees would not be required to comply with 
the positions set forth in this RG.

    Dated: July 27, 2021.

    For the Nuclear Regulatory Commission.
Meraj Rahimi,
Chief, Regulatory Guide and Programs Management Branch, Division of 
Engineering, Office of Nuclear Regulatory Research.
[FR Doc. 2021-16343 Filed 7-30-21; 8:45 am]
BILLING CODE 7590-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on August 2, 2021.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.