Notice2021-16327

Withdrawal of the Notice of Intent To Prepare an Environmental Impact Statement for the Carpinteria Shoreline, a Feasibility Study in the City of Carpinteria, Santa Barbara County, CA

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
July 30, 2021

Issuing agencies

Defense DepartmentEngineers Corps

Abstract

The U.S. Army Corps of Engineers, Los Angeles District, Planning Division is notifying interested parties that it has withdrawn the Notice of Intent (NOI) to develop an environmental impact statement (EIS) for the proposed Carpinteria Shoreline General Investigation (GI) feasibility study. The original NOI to prepare a EIS was published in the Federal Register on September 11, 2003. The proposed Carpinteria Shoreline GI feasibility study is being converted to a Continuing Authority Program (CAP) study.

Full Text

<html>
<head>
<title>Federal Register, Volume 86 Issue 144 (Friday, July 30, 2021)</title>
</head>
<body><pre>
[Federal Register Volume 86, Number 144 (Friday, July 30, 2021)]
[Notices]
[Page 41028]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2021-16327]


-----------------------------------------------------------------------

DEPARTMENT OF THE DEFENSE

Department of the Army, Corps of Engineers


Withdrawal of the Notice of Intent To Prepare an Environmental 
Impact Statement for the Carpinteria Shoreline, a Feasibility Study in 
the City of Carpinteria, Santa Barbara County, CA

AGENCY: Army Corps of Engineers, DoD.

ACTION: Notice of intent; withdrawal.

-----------------------------------------------------------------------

SUMMARY: The U.S. Army Corps of Engineers, Los Angeles District, 
Planning Division is notifying interested parties that it has withdrawn 
the Notice of Intent (NOI) to develop an environmental impact statement 
(EIS) for the proposed Carpinteria Shoreline General Investigation (GI) 
feasibility study. The original NOI to prepare a EIS was published in 
the Federal Register on September 11, 2003. The proposed Carpinteria 
Shoreline GI feasibility study is being converted to a Continuing 
Authority Program (CAP) study.

DATES: The notice of intent to prepare an EIS published in the Federal 
Register on September 11, 2003 (68 FR 53598), is withdrawn as of July 
30, 2021.

ADDRESSES: U.S. Army Corps of Engineers, Los Angeles District, 
Environmental Resources Branch, (CESPL-PDR), 915 Wilshire Blvd., Suite 
930, Los Angeles, CA 90017-3489.

FOR FURTHER INFORMATION CONTACT: Questions regarding the withdrawal of 
this NOI should be addressed to Mr. Kirk Brus, 213-452-3876, or 
<a href="/cdn-cgi/l/email-protection#dcb7b5aeb7f2bff2beaea9af9ca9afbdbfb9f2bdaeb1a5f2b1b5b0"><span class="__cf_email__" data-cfemail="a8c3c1dac386cb86cadadddbe8dddbc9cbcd86c9dac5d186c5c1c4">[email&#160;protected]</span></a>.

SUPPLEMENTARY INFORMATION: Study efforts in the Carpinteria study area 
will be converted to the Continuing Authorities Program (CAP) Section 
103 which addresses projects of limited size, cost and complexity for 
Hurricane and Storm Damage Reduction.

Antoinette R. Gant,
Colonel, U.S. Army, Division Commander.
[FR Doc. 2021-16327 Filed 7-29-21; 8:45 am]
BILLING CODE 3720-58-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on July 30, 2021.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.