Withdrawal of the Notice of Intent To Prepare an Environmental Impact Statement for the Carpinteria Shoreline, a Feasibility Study in the City of Carpinteria, Santa Barbara County, CA
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Issuing agencies
Abstract
The U.S. Army Corps of Engineers, Los Angeles District, Planning Division is notifying interested parties that it has withdrawn the Notice of Intent (NOI) to develop an environmental impact statement (EIS) for the proposed Carpinteria Shoreline General Investigation (GI) feasibility study. The original NOI to prepare a EIS was published in the Federal Register on September 11, 2003. The proposed Carpinteria Shoreline GI feasibility study is being converted to a Continuing Authority Program (CAP) study.
Full Text
<html> <head> <title>Federal Register, Volume 86 Issue 144 (Friday, July 30, 2021)</title> </head> <body><pre> [Federal Register Volume 86, Number 144 (Friday, July 30, 2021)] [Notices] [Page 41028] From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>] [FR Doc No: 2021-16327] ----------------------------------------------------------------------- DEPARTMENT OF THE DEFENSE Department of the Army, Corps of Engineers Withdrawal of the Notice of Intent To Prepare an Environmental Impact Statement for the Carpinteria Shoreline, a Feasibility Study in the City of Carpinteria, Santa Barbara County, CA AGENCY: Army Corps of Engineers, DoD. ACTION: Notice of intent; withdrawal. ----------------------------------------------------------------------- SUMMARY: The U.S. Army Corps of Engineers, Los Angeles District, Planning Division is notifying interested parties that it has withdrawn the Notice of Intent (NOI) to develop an environmental impact statement (EIS) for the proposed Carpinteria Shoreline General Investigation (GI) feasibility study. The original NOI to prepare a EIS was published in the Federal Register on September 11, 2003. The proposed Carpinteria Shoreline GI feasibility study is being converted to a Continuing Authority Program (CAP) study. DATES: The notice of intent to prepare an EIS published in the Federal Register on September 11, 2003 (68 FR 53598), is withdrawn as of July 30, 2021. ADDRESSES: U.S. Army Corps of Engineers, Los Angeles District, Environmental Resources Branch, (CESPL-PDR), 915 Wilshire Blvd., Suite 930, Los Angeles, CA 90017-3489. FOR FURTHER INFORMATION CONTACT: Questions regarding the withdrawal of this NOI should be addressed to Mr. Kirk Brus, 213-452-3876, or <a href="/cdn-cgi/l/email-protection#dcb7b5aeb7f2bff2beaea9af9ca9afbdbfb9f2bdaeb1a5f2b1b5b0"><span class="__cf_email__" data-cfemail="a8c3c1dac386cb86cadadddbe8dddbc9cbcd86c9dac5d186c5c1c4">[email protected]</span></a>. SUPPLEMENTARY INFORMATION: Study efforts in the Carpinteria study area will be converted to the Continuing Authorities Program (CAP) Section 103 which addresses projects of limited size, cost and complexity for Hurricane and Storm Damage Reduction. Antoinette R. Gant, Colonel, U.S. Army, Division Commander. [FR Doc. 2021-16327 Filed 7-29-21; 8:45 am] BILLING CODE 3720-58-P </pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body> </html>
This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.