Notice2021-15092
Texas Gas Transmission, LLC; Notice of Application and Establishing Intervention Deadline
Primary source
Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.
Published
July 15, 2021
Issuing agencies
Energy DepartmentFederal Energy Regulatory Commission
Full Text
<html>
<head>
<title>Federal Register, Volume 86 Issue 133 (Thursday, July 15, 2021)</title>
</head>
<body><pre>
[Federal Register Volume 86, Number 133 (Thursday, July 15, 2021)]
[Notices]
[Pages 37322-37324]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2021-15092]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP21-467-000]
Texas Gas Transmission, LLC; Notice of Application and
Establishing Intervention Deadline
Take notice that on June 25, 2021, Texas Gas Transmission, LLC
(Texas Gas), 9 Greenway Plaza, Suite 2800, Houston, TX 77046, filed an
application under sections 7(b), 7(c), and 7(e) of the Natural Gas Act
(NGA), and Part 157 of the Commission's regulations, requesting
authorization to construct, operate, and maintain (i) approximately 24
miles of new 20-inch diameter natural gas lateral, and auxiliary
appurtenant facilities located in Henderson County, Kentucky and Posey
County, Indiana; (ii) a new delivery meter and regulator (M&R) station
with 0.08 miles of new 16-inch diameter interconnecting pipe located in
Posey County, Indiana; (iii) upgrades to an existing receipt M&R
station located in Johnson County, Indiana; and (iv) a new C50 turbine
compressor unit with approximately 4,863 horsepower, piping
modifications, and other associated auxiliary appurtenant facilities to
be installed at Texas Gas' existing Slaughters Compressor Station in
Webster County, Kentucky.
At the Slaughters Compressor Station, Texas Gas also seeks
authority to (i) abandon reciprocating Unit 5 and (ii) place
reciprocating Unit 6 and Unit 7 on standby to be operated only under
limited circumstances.
The proposed Project will allow Texas Gas to provide up to 220,000
Dekatherms per day (Dth/d) of new firm transportation service to
CenterPoint Energy Indiana South (Center Point) to serve CenterPoint's
proposed new 460 megawatt (MW) natural gas-fired electric generating
facilities to be located at CenterPoint's existing A.B. Brown coal-
fired power plant site in Posey County, near Evansville, Indiana, all
as more fully set forth in the application which is on file with the
Commission and open for public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (<a href="http://ferc.gov">http://ferc.gov</a>) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at <a href="/cdn-cgi/l/email-protection#f8bebdaabbb7969491969dab8d8888978a8cb89e9d8a9bd69f978e"><span class="__cf_email__" data-cfemail="195f5c4b5a56777570777c4a6c6969766b6d597f7c6b7a377e766f">[email protected]</span></a> or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Any questions regarding the proposed project should be directed to
J. Kyle Stephens, Vice President, Regulatory Affairs, Texas Gas
Transmission, LLC, 9 Greenway Plaza, Suite 2800, Houston, Texas, 77046,
or by phone at (713)-479-8033, by fax at (713) 479-1846, or by email at
<a href="/cdn-cgi/l/email-protection#cf84b6a3aae19cbbaabfa7aaa1bc8fadb8bfa6bfaaa3a6a1aabce1aca0a2"><span class="__cf_email__" data-cfemail="5b1022373e75082f3e2b333e35281b392c2b322b3e3732353e2875383436">[email protected]</span></a>.
Pursuant to Section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: Complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS)
[[Page 37323]]
or environmental assessment (EA) for this proposal. The filing of an EA
in the Commission's public record for this proceeding or the issuance
of a Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------
Public Participation
There are two ways to become involved in the Commission's review of
this project: You can file comments on the project, and you can file a
motion to intervene in the proceeding. There is no fee or cost for
filing comments or intervening. The deadline for filing a motion to
intervene is 5:00 p.m. Eastern Time on July 30, 2021.
Comments
Any person wishing to comment on the project may do so. Comments
may include statements of support or objections to the project as a
whole or specific aspects of the project. The more specific your
comments, the more useful they will be. To ensure that your comments
are timely and properly recorded, please submit your comments on or
before July 30, 2021.
There are three methods you can use to submit your comments to the
Commission. In all instances, please reference the Project docket
number (CP21-467-000) in your submission.
(1) You may file your comments electronically by using the eComment
feature, which is located on the Commission's website at <a href="http://www.ferc.gov">www.ferc.gov</a>
under the link to Documents and Filings. Using eComment is an easy
method for interested persons to submit brief, text-only comments on a
project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's website (<a href="http://www.ferc.gov">www.ferc.gov</a>)
under the link to Documents and Filings. With eFiling, you can provide
comments in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You will be asked to select the type of filing you
are making; first select ``General'' and then select ``Comment on a
Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address below.\2\ Your written comments must reference
the Project docket number (CP21-467-000).
---------------------------------------------------------------------------
\2\ Hand delivered submissions in docketed proceedings should be
delivered to Health and Human Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
---------------------------------------------------------------------------
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426.
The Commission encourages electronic filing of comments (options 1
and 2 above) and has eFiling staff available to assist you at (202)
502-8258 or <a href="/cdn-cgi/l/email-protection" class="__cf_email__" data-cfemail="b6f0d3c4d5f9d8dadfd8d3e5c3c6c6d9c4c2f6d0d3c4d598d1d9c0">[email protected]</a>.
Persons who comment on the environmental review of this project
will be placed on the Commission's environmental mailing list, and will
receive notification when the environmental documents (EA or EIS) are
issued for this project and will be notified of meetings associated
with the Commission's environmental review process.
The Commission considers all comments received about the project in
determining the appropriate action to be taken. However, the filing of
a comment alone will not serve to make the filer a party to the
proceeding. To become a party, you must intervene in the proceeding.
For instructions on how to intervene, see below.
Interventions
Any person, which includes individuals, organizations, businesses,
municipalities, and other entities,\3\ has the option to file a motion
to intervene in this proceeding. Only intervenors have the right to
request rehearing of Commission orders issued in this proceeding and to
subsequently challenge the Commission's orders in the U.S. Circuit
Courts of Appeal.
---------------------------------------------------------------------------
\3\ 18 CFR 385.102(d).
---------------------------------------------------------------------------
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is July 30, 2021. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
the your interest in the proceeding. [For an individual, this could
include your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene.] For more information
about motions to intervene, refer to the FERC website at <a href="https://www.ferc.gov/resources/guides/how-to/intervene.asp">https://www.ferc.gov/resources/guides/how-to/intervene.asp</a>.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
There are two ways to submit your motion to intervene. In both
instances, please reference the Project docket number (CP21-467-000) in
your submission.
(1) You may file your motion to intervene by using the Commission's
eFiling feature, which is located on the Commission's website
(<a href="http://www.ferc.gov">www.ferc.gov</a>) under the link to Documents and Filings. New eFiling
users must first create an account by clicking on ``eRegister.'' You
will be asked to select the type of filing you are making; first select
``General'' and then select ``Intervention.'' The eFiling feature
includes a document-less intervention option; for more information,
visit <a href="https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf">https://www.ferc.gov/docs-filing/efiling/document-less-intervention.pdf</a>; or
(2) You can file a paper copy of your motion to intervene, along
with three copies, by mailing the documents to the address below.\6\
Your motion to intervene must reference the Project docket number
(CP21-467-000).
---------------------------------------------------------------------------
\6\ Hand delivered submissions in docketed proceedings should be
delivered to Health and Human Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
---------------------------------------------------------------------------
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC 20426.
The Commission encourages electronic filing of motions to intervene
(option 1 above) and has eFiling staff available to assist you at (202)
502-8258 or <a href="/cdn-cgi/l/email-protection" class="__cf_email__" data-cfemail="31775443527e5f5d585f54624441415e434571575443521f565e47">[email protected]</a>.
Motions to intervene must be served on the applicant either by mail
or email at: 9 Greenway Plaza, Houston, Texas, 77046 or at
<a href="/cdn-cgi/l/email-protection#541f2d38317a072031243c313a27143623243d2431383d3a31277a373b39"><span class="__cf_email__" data-cfemail="43083a2f266d103726332b262d30032134332a33262f2a2d26306d202c2e">[email protected]</span></a>. Any subsequent submissions by an
intervenor must be served on the applicant and all other parties to the
proceeding. Contact information for parties can be downloaded from the
service list at the eService link on FERC Online. Service can be via
email with a link to the document.
All timely, unopposed \7\ motions to intervene are automatically
granted by operation of Rule 214(c)(1).\8\ Motions to intervene that
are filed after the intervention deadline are untimely, and may be
denied. Any late-filed motion to intervene must show good cause for
being late and must explain why the time limitation should be waived
and provide justification by reference to factors set forth in Rule
214(d) of the Commission's Rules and Regulations.\9\ A person obtaining
party status will be placed on the service list maintained by the
Secretary of the Commission and
[[Page 37324]]
will receive copies (paper or electronic) of all documents filed by the
applicant and by all other parties.
---------------------------------------------------------------------------
\7\ The applicant has 15 days from the submittal of a motion to
intervene to file a written objection to the intervention.
\8\ 18 CFR 385.214(c)(1).
\9\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at <a href="http://www.ferc.gov">www.ferc.gov</a> using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
<a href="http://www.ferc.gov/docs-filing/esubscription.asp">www.ferc.gov/docs-filing/esubscription.asp</a>.
Intervention Deadline: 5:00 p.m. Eastern Time on July 30, 2021.
Dated: July 9, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-15092 Filed 7-14-21; 8:45 am]
BILLING CODE 6717-01-P
</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>Indexed from Federal Register on July 15, 2021.