Notice2021-11989

North Loup River Public Power and Irrigation District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

Primary source

Metadata and text below are from the Federal Register, a public-domain U.S. government work. Always verify the official published version before relying on it for any legal matter.

Published
June 8, 2021

Issuing agencies

Energy DepartmentFederal Energy Regulatory Commission

Full Text

<html>
<head>
<title>Federal Register, Volume 86 Issue 108 (Tuesday, June 8, 2021)</title>
</head>
<body><pre>
[Federal Register Volume 86, Number 108 (Tuesday, June 8, 2021)]
[Notices]
[Pages 30455-30456]
From the Federal Register Online via the Government Publishing Office [<a href="http://www.gpo.gov">www.gpo.gov</a>]
[FR Doc No: 2021-11989]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CD21-6-000]


North Loup River Public Power and Irrigation District; Notice of 
Preliminary Determination of a Qualifying Conduit Hydropower Facility 
and Soliciting Comments and Motions To Intervene

    On May 21, 2021, North Loup River Public Power and Irrigation 
District filed a notice of intent to construct a qualifying conduit 
hydropower facility, pursuant to section 30 of the Federal Power Act 
(FPA). The proposed North Loup Canal Hydroelectric Project would have 
an installed capacity of 30 kilowatts (kW), and would be located in the 
applicant's existing North Loup Main Canal in Valley County, Nebraska.
    Applicant Contact: Amos Lange, 128 North 16th Street, Ord, NE 
68862, Email: <a href="/cdn-cgi/l/email-protection#3a5456484a4a535e7a435b52555514595557"><span class="__cf_email__" data-cfemail="7816140a0808111c380119101717561b1715">[email&#160;protected]</span></a>.
    FERC Contact: Christopher Chaney, Phone No. (202) 502-6778, Email: 
<a href="/cdn-cgi/l/email-protection#482b203a213b3c2738202d3a662b2029262d31082e2d3a2b662f273e"><span class="__cf_email__" data-cfemail="94f7fce6fde7e0fbe4fcf1e6baf7fcf5faf1edd4f2f1e6f7baf3fbe2">[email&#160;protected]</span></a>.
    Qualifying Conduit Hydropower Facility Description: The proposed 
project would consist of: (1) Four approximately 1.8-meter by 2.3-meter 
by 2.4-meter hydrokinetic turbine modules with a total capacity of 30 
kW; and (2) appurtenant facilities. The proposed project would have an 
estimated annual generation of approximately 130 megawatt-hours.
    A qualifying conduit hydropower facility is one that is determined 
or deemed to meet all the criteria shown in the table below.

                          Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
              Statutory provision                                 Description                    Satisfies (Y/N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A)...............................  The conduit the facility uses is a tunnel,                    Y
                                                 canal, pipeline, aqueduct, flume, ditch, or
                                                 similar manmade water conveyance that is
                                                 operated for the distribution of water for
                                                 agricultural, municipal, or industrial
                                                 consumption and not primarily for the
                                                 generation of electricity.
FPA 30(a)(3)(C)(i)............................  The facility is constructed, operated, or                     Y
                                                 maintained for the generation of electric
                                                 power and uses for such generation only the
                                                 hydroelectric potential of a non-federally
                                                 owned conduit.
FPA 30(a)(3)(C)(ii)...........................  The facility has an installed capacity that                   Y
                                                 does not exceed 40 megawatts.
FPA 30(a)(3)(C)(iii)..........................  On or before August 9, 2013, the facility is                  Y
                                                 not licensed, or exempted from the licensing
                                                 requirements of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------

    Preliminary Determination: The proposed North Loup Canal 
Hydroelectric Project will not alter the primary purpose of the conduit 
system, which is used to distribute water for agricultural irrigation. 
Therefore, based upon the above criteria, Commission staff 
preliminarily determines that the proposal satisfies the requirements 
for a qualifying conduit hydropower facility, which is not required to 
be licensed or exempted from licensing.

[[Page 30456]]

    Comments and Motions to Intervene: Deadline for filing comments 
contesting whether the facility meets the qualifying criteria is 30 
days from the issuance date of this notice.
    Deadline for filing motions to intervene is 30 days from the 
issuance date of this notice.
    Anyone may submit comments or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210 and 385.214. Any motions to intervene must be received on or 
before the specified deadline date for the particular proceeding.
    Filing and Service of Responsive Documents: All filings must (1) 
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR 
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as 
applicable; (2) state in the heading the name of the applicant and the 
project number of the application to which the filing responds; (3) 
state the name, address, and telephone number of the person filing; and 
(4) otherwise comply with the requirements of sections 385.2001 through 
385.2005 of the Commission's regulations.\1\ All comments contesting 
Commission staff's preliminary determination that the facility meets 
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.2001-2005 (2020).
---------------------------------------------------------------------------

    The Commission strongly encourages electronic filing. Please file 
motions to intervene and comments using the Commission's eFiling system 
at <a href="http://www.ferc.gov/docs-filing/efiling.asp">http://www.ferc.gov/docs-filing/efiling.asp</a>. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at <a href="http://www.ferc.gov/docs-filing/ecomment.asp">http://www.ferc.gov/docs-filing/ecomment.asp</a>. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at <a href="/cdn-cgi/l/email-protection#773132253438191b1e191224020707180503371112051459101801"><span class="__cf_email__" data-cfemail="286e6d7a6b67464441464d7b5d5858475a5c684e4d5a4b064f475e">[email&#160;protected]</span></a>, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, you may send a 
paper copy. Submissions sent via the U.S. Postal Service must be 
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, MD 20852. A copy of all other filings in reference 
to this application must be accompanied by proof of service on all 
persons listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 385.2010.
    Locations of Notice of Intent: The Commission provides all 
interested persons an opportunity to view and/or print the contents of 
this document via the internet through the Commission's website at 
<a href="http://www.ferc.gov/docs-filing/elibrary.asp">http://www.ferc.gov/docs-filing/elibrary.asp</a>. Enter the docket number 
(i.e., CD21-6) in the docket number field to access the document. You 
may also register online at <a href="http://www.ferc.gov/docs-filing/esubscription.asp">http://www.ferc.gov/docs-filing/esubscription.asp</a> to be notified via email of new filings and issuances 
related to this or other pending projects. Copies of the notice of 
intent can be obtained directly from the applicant. At this time, the 
Commission has suspended access to the Commission's Public Reference 
Room due to the proclamation declaring a National Emergency concerning 
the Novel Coronavirus Disease (COVID-19), issued by the President on 
March 13, 2020. For assistance, call toll-free 1-866-208-3676 or email 
<a href="/cdn-cgi/l/email-protection#d1979483929ebfbdb8bfb482a4a1a1bea3a591b7b4a3b2ffb6bea7"><span class="__cf_email__" data-cfemail="6e282b3c2d21000207000b3d1b1e1e011c1a2e080b1c0d40090118">[email&#160;protected]</span></a>. For TTY, call (202) 502-8659.

    Dated: June 2, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-11989 Filed 6-7-21; 8:45 am]
BILLING CODE 6717-01-P


</pre><script data-cfasync="false" src="/cdn-cgi/scripts/5c5dd728/cloudflare-static/email-decode.min.js"></script></body>
</html>
Indexed from Federal Register on June 8, 2021.

This is legal information, not legal advice. Laws vary by jurisdiction and change frequently. Always verify current law with official sources and consult a licensed attorney in your jurisdiction for advice on your specific situation.